October 2004 Monthly Operating Report for Callaway Plant Unit 1
ML043240018
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/10/2004
From: Keith Young
AmerenUE, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC05088
Download: ML043240018 (4)


Text

AmerenUE PO Box 620 Callaway Plant Fulton, MIO65251 November 10, 2004 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop PI -137 Washington, DC 20555-0001 ULNRC05088 Ladies & Gentlemen:

wAmeren DOCKET NUMBER 50-483 UNION ELECTRIC CO.

Uf CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT October/2004 The enclosed Monthly Operating Report for October/2004 is submitted pursuant to Section 5.6.4 of the Callaway Unit I Technical Specifications.

nerith D. R u oyng f Manager, Regulatory Affairs KDY/JER/slk Enclosure

,-<6,

'-' q a subsidiary ofAmeren Corporation

ULNRC05088 November 10, 2004 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street P.O. Box 360 Jefferson City, MO 65102-0360

Enclosure ULNRC05088 November 10, 2004 DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORTING PERIOD: Octoberf2004 I. DESIGN ELECTRICAL RATING (MWe-Net): 1171

2. MAX. DEPEND. CAPACITY (MWe-Net): 1125 THIS MONTH YR TO DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 745 5,468.57 155,414.57
4. HOURS GENERATOR ON-LINE 745 5,393.02 153,387.02
5. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
6. NET ELECTRICAL ENERGY GENERATED (MWH) 868,542 6,128,519 169,372,358 Page 1 of 2

Enclosure ULNRC05088 November 10, 2004 UNIT SHUTDOWNS DOCKET NO.: 50-483 UNIT NAME: CALLAWAY UNIT I COMPLETED BY: J. E. Ready TELEPHONE: 573/676-8617 FAX: 573/676-4202 REPORT: October /2004 TYPE METHOD OF CORRECTIVE F: FORCED DURATION SHUTTING DOWN ACTIONS/

NO. DATE S: SCHEDULED (HOURS) REASON THE REACTOR COMMENTS

SUMMARY

Callaway Plant operated at approximately 100% power for the month of October.

REASON METHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFUELING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4. CONTINUATION E: OPERATOR TRAINING / LICENSE EXAMINATION 5: OTHER (EXPLAIN)

F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

Page 2 of 2