Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 05000458/LER-1999-010, Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-05-28028 May 1999 Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl RBG-45021, Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in1999-05-26026 May 1999 Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in 05000458/LER-1999-009, Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form1999-05-24024 May 1999 Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form RBG-45017, Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl1999-05-14014 May 1999 Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 05000458/LER-1999-007, Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 11999-05-10010 May 1999 Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1 05000458/LER-1999-006, Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 11999-05-0606 May 1999 Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 1 05000458/LER-1999-005, Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 11999-05-0303 May 1999 Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1 RBG-44993, Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl1999-04-30030 April 1999 Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl RBG-44998, Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 9802241999-04-30030 April 1999 Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 980224 ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested 05000458/LER-1999-003, Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 11999-04-23023 April 1999 Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 1 RBG-44968, Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC1999-04-15015 April 1999 Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC RBG-44965, Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl1999-04-0808 April 1999 Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl RBG-44959, Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage1999-04-0808 April 1999 Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage ML20205F1781999-03-31031 March 1999 Forwards Consolidated Entergy Submittal to Document Primary & Excess Property Damage Insurance Coverage for Nuclear Sites of Entergy Operations,Inc,Per 10CFR50.54(w)(3) RBG-44939, Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr1999-03-31031 March 1999 Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr ML20196K7101999-03-26026 March 1999 Submits Reporting & Recordkeeping for Decommissioning Planning,Per 10CFR50.75(f)(1) RBG-44899, Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed1999-03-25025 March 1999 Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed ML20204G8701999-03-15015 March 1999 Responds to NOV Described in NRC Correspondance to Util ,expressing Disappointment in NRC Determination That AD Wells Deliberately Provided Incomplete & Inaccurate Info to NRC During Meeting on 971015 RBG-44925, Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations1999-03-15015 March 1999 Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations RBG-44924, Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check1999-03-0505 March 1999 Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check RBG-44912, Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air1999-03-0303 March 1999 Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air RBG-44904, Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 9912161999-02-25025 February 1999 Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 991216 RBG-44384, Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition1999-02-11011 February 1999 Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition ML20203C4201999-01-25025 January 1999 Submits Denial of NRC Request for Advance Info Re Concerns Raised by Ucs in 10CFR2.206 Petitions on River Bend & Perry Plants.Petitioners Were Not Required to Provide NRC with Info in Advance of Informal Public Hearings 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARRBG-33517, Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed1990-09-10010 September 1990 Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed RBG-33466, Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range1990-08-30030 August 1990 Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range RBG-33460, Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.211990-08-28028 August 1990 Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.21 RBG-33496, Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment1990-08-28028 August 1990 Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment RBG-33450, Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-9003011990-08-28028 August 1990 Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-900301 RBG-33424, Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 9009291990-08-22022 August 1990 Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 900929 RBG-33406, Forwards Rev 6 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21)1990-08-17017 August 1990 Forwards Rev 6 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) RBG-33372, Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified1990-08-10010 August 1990 Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified RBG-33310, Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages1990-08-0101 August 1990 Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages RBG-33300, Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting1990-07-30030 July 1990 Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting RBG-33294, Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank1990-07-26026 July 1990 Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank RBG-33196, Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-161990-07-13013 July 1990 Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-16 RBG-33150, Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed1990-07-0202 July 1990 Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed RBG-33143, Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 19901990-06-29029 June 1990 Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 1990 RBG-33132, Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs1990-06-28028 June 1990 Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs RBG-33113, Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License1990-06-26026 June 1990 Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License RBG-33114, Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon1990-06-26026 June 1990 Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon RBG-33120, Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads1990-06-26026 June 1990 Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads RBG-33100, Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 19901990-06-22022 June 1990 Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 1990 ML20043G2211990-06-14014 June 1990 Responds to 900509 Request for Addl Info Re 900209 Response to Violations Noted in Insp Rept 50-458/89-41.Procedure Being Developed to Provide Guidelines for Future Troubleshooting of Recirculation Flow Control Valve Sys ML20043G8191990-06-12012 June 1990 Forwards Rev 5A to Pump Valve Inservice Testing Plan,For Review.Rev Provides Addl Info & Clarification for Requests for Relief Noted in Rev 5 ML20043E6531990-06-0606 June 1990 Forwards Addl Info Re 880930 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09 Requirements Re Preplanned Use of Addl Operating Flexibility ML20043F9801990-06-0606 June 1990 Forwards Response to NRC 890731 Request for Addl Info Re Util 890731 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09.Justifications for Use of Proposed Tech Spec 3.0.4 Will Be Submitted Separately ML20043D5591990-06-0101 June 1990 Provides Status of Actions Re Insp Rept 50-458/89-45 Which Dealt W/Dual Coil Solenoid Operated Valves Used to Control MSIVs ML20043D5421990-06-0101 June 1990 Forwards Addendum to River Bend Station - Unit 1,Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. ML20043D5401990-06-0101 June 1990 Provides Update to 900125 & 0315 Responses to Insp Rept 50-458/89-200.Util in Process of Performing Retrofit Review of in-stock Items Purchased Between 850101-900101 ML20043D2371990-05-31031 May 1990 Provides Suppl to 890929 Response to Violations Noted in Insp Rept 50-458/89-31.Safety Tagging Administrative Procedure Being Revised to Make Clearance Program Easier to Understand & Follow ML20043C8011990-05-29029 May 1990 Forwards Rev 12 to Physical Security Plan.Rev Reflects Current Activities of Plant Security Programs.Rev Withheld (Ref 10CFR73.21.) ML20043B4231990-05-21021 May 1990 Forwards Rept Re Investigation Involving Unsatisfactory Performance Test Result by Dhhs Certified Lab Under Contract to Util to Perform Drug Screen Testing Under 10CFR26, Fitness-For-Duty Program. ML20043A4271990-05-14014 May 1990 Forwards Authorization of Util Board of Directors for Tf Plunkett & Wh Odell to Sign Ltrs to NRC Transmitting Amends to OL or Responses to Insp Repts ML20042G7031990-05-0909 May 1990 Responds to NRC 900405 Ltr Re Weaknesses Noted in Insp Rept 50-458/90-06 on 900220-23.Corrective Action:Software in Simulator Changed to Duplicate Software in Control Room & More Training Time on Computers Given to Operators ML20042F9741990-05-0707 May 1990 Responds to Violations Noted in Insp Rept 50-458/90-02 on 900122-26.Corrective Actions:Electrical Power Removed from Valves,Safety Assessment of Spurious Opening Performed & QA Performed on Energized Valves ML20042G2521990-05-0404 May 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants.' ML20042E3781990-04-0606 April 1990 Responds to Violations Noted in Ofc of Investigations Rept 4-88-027,per Enforcement Action 90-043.Corrective Actions: Util Auditing self-screening Contractor Programs to Assure Compliance & Audit Will Be Evaluated for Acceptability ML20042D8351990-03-30030 March 1990 Submits Supplemental Info Re Util Response to Station Blackout Rule & Advises That Results of Plant Evaluations Demonstrate Ability to Cope W/Station Blackout for Proposed 4 H Duration W/O Reliance on Ac Power Sources ML20042E3501990-03-30030 March 1990 Forwards Evaluation of Unsatisfactory Performance by Dhhs Certified Lab Performing Drug Testing ML20012F1571990-03-28028 March 1990 Requests Extension Until 900601 to Submit Changes to Facility Tech Specs Re Leak Detection & Inservice Insp Program,Per Generic Ltr 88-01 ML20012F1551990-03-28028 March 1990 Suppls 890411 Response to Violations Noted in Insp Rept 50-458/86-04.Operations QC Instructed QC Planners & Lead Inspector to Include Hold Point of Electrical Maint Work Request for Category I Electrical Equipment Panels ML20042D7041990-03-21021 March 1990 Forwards Results of Ultrasonic Testing Conducted on N4A-2 Feedwater nozzle-to-safe End Weld During mid-cycle Outage at Plant.Circumferential Indication Identified in Buttered Area on Safe End Side of Weld During Second Refueling Outage ML20012E0001990-03-20020 March 1990 Forwards Marsh & Mclennan 900313 Ltr Containing Summary of Property Insurance Coverage for Facility,Per 10CFR50.54(w)(2) ML20012C7901990-03-16016 March 1990 Forwards Response to Violations Noted in Insp Rept 50-458/89-39.Response Withheld (Ref 10CFR73.21) ML20012C9931990-03-15015 March 1990 Forwards Duke Engineering & Svcs,Inc 900105 Ltr to BC Fichtenkort Re Proposed Crankshaft Insp Variation & Recommends Variation Be Presented to Clearinghouse Members at 900111-12 Meeting ML20012C7881990-03-15015 March 1990 Provides Updated Status for Corrective Actions Being Taken for Discrepancies Identified in Insp Rept 50-458/89-200. Thirty-six Items identified.Twenty-eight Items Completed. Three of Eight Remaining Items Require Evaluation of Stock ML20012C0381990-03-0909 March 1990 Advises That Senior Reactor Operator License 43188-1 & Reactor Operator License 42087-2 for a Middlebrooks & DG Looney,Respectively,Expired on 900105 & 900201 ML20012A4431990-03-0101 March 1990 Requests Addl Clarification to Prepare Response to Generic Ltr 90-01 Re Survey of Time Spent by Key Nuclear Power Plant Managers in Responding to Various Operational Insps & Audits ML20012B3001990-03-0101 March 1990 Forwards Fitness for Duty Program Rept 90-F-02 Re Investigation of Unsatisfactory Performance Test Result by Certified Lab Under Contract to Util to Perform Drug Screen Testing,Per 10CFR26 ML20012A9161990-02-28028 February 1990 Forwards Response to Inspector Followup Item Noted in Insp Rept 50-458/89-42 on 891113-17.Corrective Actions:Rev to Procedure EDP-AA-10 Re Issuance of Training Matrix on Semiannual Basis Will Be Issued to Remove 2-yr Rereading ML20011E8431990-02-0909 February 1990 Responds to Violations Noted in Insp Rept 50-458/89-40. Corrective Actions:All Prestaged Matl Removed from Containment & Radiation Protection Personnel Cautioned on Placement of Matl on 95-ft Elevation of Containment ML20011E6741990-02-0909 February 1990 Responds to Violation Noted in Insp Rept 50-458/89-41 on 891101-15.Corrective Actions:Procedure Which Would Provide Guidelines for Future Troubleshooting of Recirculation Flow Control Valve Sys Being Developed ML20011E1531990-01-29029 January 1990 Provides Currently Identified Outage & nonoutage-related Activities to Update NRC of Util Licensing Activities in Order of Priority 1990-09-10
[Table view] |
Text
.- .
c . -o l'
GULF STATES UTILETZES COMPANY .
a v s, w wn run omu eu m u s usc sa.a w>s,wws APL A CODI tird OS 0244 360 FfM s
June 12,1990 RBG- 33012 File Nos. G9.5, GL 2.5.2. 6, h
G12.5.2.7 U. S. Nuclear Regulatory Ccnndssion Document Control Desk Washington, D.C. 20555 Genticment River Bend Station - Unit 1 Docket No. 50-458 Gulf States Utilities Campany (GSU) is providing Pavision SA of the River Bend Station Pump Valve Inservice Testing Plan for your review. This revision provides additional infornation and !
clarification for the Requests for Relief provided in Revision 5.
As discussed in a telephone conference conducted on May 3, 1990 !
between your Ms. Abbate and Messrs. Paulson and Shaw and GSU's !
Messrs. Dietrich, Kugler and Walling GSU is subnitting revisions to the following Pump and Valve Requests for Relief (PRR and VRR, respo:tively):
PRR No. 3 VRR No. 17 VRR No. 19 VRR No. 20 VRR No. 22 VRR No. 27 !
VRR No. 33 l VRR No. 58 l Should you have any questions, please contact Mr. L. L. Dietrich j of my staff at (504) 381-4866.
Since y
, $D J
/
Y .
W.11. Odell i Manager-Oversight River Bend Nuclear Group
) d -
TrP/Lge /MSP/pg Enclosure 9006210163 900612 CW ADOCK 05000450 c;
[/ /g PDR P PNV 2
'~u ;E l e, --
9 N .* cot; U. S. Nuclear Regulatory Cannission Region IV s 611 Ryan Plaza Drive,; Suite 1000 Arlington, TX 76011.
Senior Resident Inspector.
- Post Office Box 1051 St. Francisville, LA. 70775
- Mr. W.' A. Paulson j '
- Nuclear Regulatory Cattnission One White Flint North 6 - 11555 Rockville Pike
, - Rockville, MD 20952
% ?W v
,.q ,g . .t E-. t i i j
=
s a
ti s
1 a
l q
. . f-i , e
) El, . s B
ti
=
{
i \ \
. i _
r.
i f l
- 3. ,
4
= 3 RW RfE1FST POR RFLIEP NO. 3 SYSTD4: Standby liquid control COMPCNENT: Pumps IC41*IC001A and IC41'PC001B CIASS: 2 ,
TUNCTION, To pump sodium pentaborate solution into the reactor vessel TEST REQUIREMENTS: per IWP-3400(a), an inservice test shall be run on each pump nmiinally every three months during nomal plant operation.
PASIS TVR RELIEF: The operability test of these pumps during nomal operation will require both punps to be made inoperable during the '
testing since they have a cmmon suction line. Also, running the punps for the code required 5 minutes prior to data collection at their rated 41 gal. per minute would not allow use of a portable container (ie 55 gal. drum) . Due to the refilling and measurennot of the test tank the necessity of flushing of the sodium pentaborate solution frcm the suction lines which requires the chemistry department to perfom 5A sampling prior to discharge to the suppression pool, the time required to perform testing of both pumps could easily exceed the short tire (8 hr.) allowed for the lintiting condition for operation. This rystem would also require manual realignment of valves insiSe containment should anergency conditions require system operation during testing. Containment may not be accessible during an accident for this regttired manual valve realignment.
ALTEINATE TESTING: The pumps will be tested during cold shutdown if not perfomed within the previous 92 days.
4
e e 9 a
e 4 VALVE RIKKET/P FOR RFLIF NO.17
,COMKFM7T IUNCTXN CIASS CATDGOR'l DELIMD SA e
b 9
4
s .: .. . .
VALVE RRQUEST FOR RELIFF NO.19 (Cbld Shutdown Justification) f q -. COMPONENT IUJCTION CLASS CATEGORY
' IE12*MOF008 Reactor coolant pressure 1 A IE12*McNhl09 boundary isolation and r dryw11 isolation for MIR
, shutdown cooling suction
~1E12*MOVF042A,B,C Reactor coolant pressure 1 A-
- boundary isolation, containment isolation and
{ LPCI injection
[ 1El2*M WF053A,B RHR chutdoan cooling return 2 A E to feedwater line containnent and press.tro isolation g
1E12*FOVF023 Reactor coolant pressure 1 A boundary isolation, containment isolation and MIR to RCIC head spray 1E21*MWF005 Reactor coolant pressure 1 A boundary isolation, containment isolation and LPCS injection 1E22*MOVF004 HPCS injection, containment 1 A E6 isolation, and reactor coolant SA' s pressure boundary TEST REOUIREMEN_T: Per IW-3411, Category A and B valves shall be exercised at least once every three months.
_ BASIS FOR 7 RELIEh The exercise testing of the valves during normal ' operation could subject sme of the system low pressurd* piping to .
greater than design pressure and tmperature,- assuming an 5A upstream check valve (if alplicable) and leaks. Valves
____ 1E12*bDVF008 and 9 are interlocked w.ith reactor pressure.
_ - ALTERIATE TESTING: An exercise test for each valve during cold shutdown if not performed within the previous 92 days as allowed by IW-3412
, (a).
E C
(
E m
VAINE RHOURST FOR RRLUF NO. 20 COMPCNFNI' FUNCJT ON CIASS CATmORY lE12*VF050A,B High pressure isolation check 2 C for RHR shutdown cooling return line to reactor feedwater line TEST RECUIREMENT: Per IW-3521, check valves shall be exercised at least once every three months.
BASIS 10R RELIFF: The RHR system head is inadequate to open the valves against }
feedwater operating pressure. The valves are opened when the ;
RHR system is placed into the shutdown cooling (SDC) nYxle during plant shutdowns. To verify the valves close during plant shutdowns would require the shutdown cooling loop of !
the RHR systs to be mde inoperable. I Technical Specification 3.4.9.2 requires two (2) loops of SDC ;
to be available or at least one alternate available for wch inoperable loop. Because of decay heat, it requires at least 30 days for an alternate method such as 16CU or fuel pool cooling to be able to handle the existing heat loads .for SDC. 3 During refueling outages, this requirment is reduced to cae loop of SDC when the technical specification does permit one !
loop to be made inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for testing. 5A Hcuever, because of the difficulty and- tim required in performing this test using hoses connected for drain down of ,
tbo column of water beneath the valve in order to verify disk c1ceure, operations personnel will ,ng pennit this testing as.
a caervative measure.
Thts test cannot be accmplished with- the loop in SDC. In addition, a significant volume of contaminated water is released to radwaste. Finally, since the- drain hub is located in a high radiation area for the VF050A valve and the drain valve connections are also located in high radiation areas and contamination zones during outages as a result of ;
SDC, significant radiation exposure can be received. '
T !1 i . " , ' . '
"1, . _ , ,f-F ' ,i lh )
- i h E, *
. d i5 l,l , (:t ' y i I . ' f 44
- gj g s .,h. r'k i , .h, J. m%. ,. .
..o- ), : , i.l d '-~ , y e ",4 .( .y, '
. s a w., . #,
, g.
3;
)?- 3 :[9 i'iby ' e 4. - r t - ) U,
+
- , c ay.
i e .-.4a '
- 3rv *- a :" ^',g h t'y% j :!,--_9&ss 'q h ' 4 C, v, -.,3 W, .
, s.y#pi m ,.
i -
, . s '
..-r-./.i
,i.' ' '
g W:i M[;W'ki ALT 15emTE L ' 1, .. *
m: a N M @ ';elYBPF5i57~ TThe valves are'ecmfirmed openLeach timel . . .thei associatedO M mi ,
$ 'MM A y . > loop gs n placed Lirito the~. normal' shutdown cooling mode. during)
R '%f 7 '
creactoriahutdown.9the valves are confinned.toL close during; ' '
$ 9 Ievery. refueling? outage.4 '
esWp,s-G,-.y . ; A e,f .i s , 4- W: ., g~,- '
i 5
'ia y k
I --t #
31 c;; Q i4[g$M : , r*u.. , ,
- q .. = ,..%
"n' . , ;; :- j
, J ,.,: a 7 i\7 '
t i4
'3.. -. ' n, . .;
F4 k
- jg 5
s
[j.
.un'.---.'-
j- - ) k
, i t; ,
, r+ ,
?.1.%g
! n.h g.,i ,
!,ya ;',,'
\
. m:- =
+ d; . ( .-
^
- ' . \r .: .m, it; 2 p ,
t -- : il M* 'T h ; i-
.n[n . ci _ - - ,
, l '!
h-( .N (. f .;f.g ,.
t
.o ." J ,
4 .
- i .
, r t :, 9 , _
%sma
. -. t -.~g h' t' e , , I
' y:
1 L' g'
% 5- 0'. - 3; _- g :;If-
- I .n sN $ y y. -fi ,1 x r-d I i ?
$Il gjp b ,L'{,,
(h [ 'I'. g y I t. ,, .__'. .
.~ . a , t,, n Id',
r y, ;
P I i
f.{ ' U f k 5_ ,
',AL
> ,1. .(. ' Y, c g..,.,';a, ,
3 y e 4 t ,,f \
g #. t '
' b 1; { f, (c d3 i
- )*
?;%gl;! + <
y
, ! -c e%; 7 .
er . ,c.i .' ,6 ,
s
' ' ':.. u,. y;-
If i 1-
'I ,,
Y
.* i.
G
) . . ]".';;
P (: i i -
N4%y y.3'(ta 1 ,
s:
mr My-i f; t
- a. s x
au
- w. . wop lM5 (t.-: v; ,
,d , k
- kiM[ s Ni t 4 w
5 4jQ%m n , ,
t f._ . . .d ; j (, * .y E,>
\' <e:. . 'qd? :- j k+
g /. 3 Q,G ' '
,- t r> e f s. ,
t*
? I q- 'm 3 3
ck ,
- t
{
i
+(. ,. e g f m s
'l.o- t h A
.h ,' ?4,=
%; l 'a . , ,
'.g n , +:
[ $ '[
f T % i: r :L
? ,; ) ~ s w '
t g
? Wi%, - s r g j t,=: -
".y,j ,', : . ;'-3 s
+
.\
e
- k. O '-
gy 1
-A. i t i I e
I { \
'l t .:
g'--(,-
k*. t ,
i+
._y t t q
t s, .nn J t
Ii
> s
=f
- 3f': t .
., i t"Y <
4 i
Q' .5),% Q , >
' t '; , .I
% 0, .
., . ':(
O[-l r:l# +
k}id
. a,w $ .N s, nn' r ,
W ,
. i, p:;s, g *. v. ,
-v. i, . ,-
rj o.:? 6 3_.,N.-h l s: . ":>1ay- .- ;- . ..a6 \
g [ F ((f t- . <; g .. .[2 1 $'. si-z' i !').m_y ' h-%. -[' *>.(j%(3 J. N.. t l,I(( # , f. '- -. ' .I ' /s ,
., .e, ew ~ a . ,
r ..
y , .
VAINE RP(1FBP POR RF2JEF 10. 22 COMPONENT FUNCTICN CLASS CATEGORY 1821*RVF041A, Main steam safety and relief 1 B,C B,C,D,P,G,L valves and. automatic.
1821*RVFG47A depressurization system relief
.B,C,D,F,G,L valves 1B21*RVF051B C,D,G l TEST RECdIRIM Nr: Per IWV-3411, Category A and B valves shall be exercired at least once overy three nonths.
BASIS FOR. .
The exercise testing of the valves every three nonths during:
RELIEP: I operation would interrupt plant operation by suddenly J
-reducing reactor pressure and adding heat to the suppression pool. Technical Specification 4.5.1.e.2 requires testing the valves which are part of ADS only once per 18 months.
Safety relief valves (SRVs) have a history of leakage past the seat during operations which causes the temperature of the su;pression pool to rise. As there are sixteen (16) ',
SRVs, this heating of the suppression pool can be significant should there by any ,severt eakers. l The technical specification 3.6.3.1 limit of 957 in the suppression . pool j during operations is a legitimate concern especially in the l sunmer months when there .is little cooling water delta T j margin available. Testing of these valves increases the- ,
likelihood of trapping contaminants on the seat thus 1' pennitting steam leakage and further steam cutting of the seat to occur. Often, a nonleaking valve will begin to leak after . exercising. Such conditions may require shutdown of- 5A the reactor as a result of exacerbating the, situation by testing.
Also, in order to address the NRC concern described in j NUREG-0737, II.K.3.16 and NUREG-0626, Appendix B and F, challenges to SRVs failing to close during testing and consequently leading to a sman-break IOCA can be returned by [
reducing the frequency of testirg.
l Since these are main steam safety relief valves, they will be I functional tested in accordance with 'Ibchnical . Specification l 4.5.1.e.2.
.l i
l
)
._ ,,_ m ,
i _ _Y _
__ m{ '[.. ~ ,- _ u;. ? 8 j_[. / > 2 , \?
-lNh,m,f,A,Gh f$ ;Q M
, x,ie a~.
-m n. - ,y ?:1 ~t 3.-. 9.z. #, y c c , .
,. . ~ a-. ' . '
. ., s1 3., w3.t n' j .
-; s -- e,,
l+ u i [-.~1--: ! i . 3 .ir
.n.: mu t y. { . 3 ,
., c - - ..: :
m'
- b ~:<-'),'..' '
.tv- -t. .~/4
+
l .
1 3 , !
. , ' . X ', ( i,.- P3- - 7 g.
. ,. . s ~.r~
W-;p:m[[,m. ;. p' ., n, .= " ! ,
v;, m s py n. g. ytcg n sa .s_...n. o.a
< . . . -s s.:4a.s. .
4 .
. ,,.,j,,.,,.,, .
,, , , , , , , , , , , .. --, , . g G!($[ ' TWfDCC ' MQTheC exercise Etestang s of : the 1 valves & willo be eperfomed *
$ .p 2, < TGfolicwingLevery refueling. outage with steam pressure t greater Lthan?1001 psig'as' delineated;by the technical' specifications
'y fW@
M E 'D, *.
, a '
!for.the ADS valve strokingc ,
+
- m. .
@m. y.,_ ',- W ,m;; .
m ,
+k' y j. y '/ j' ^'
a si '
1 . . :. .
? ;t t 4 ,
-% ? j 'j t p/j d:s 1 +
'4 n
m ,n , , '
, 3;.. , -
3 a
f k g :
5 'r g % 4 l'~
~
6
- p' .
t 'n :I
. l'l .{ f
?);; s i -
b.1 4
- u
. t r l t y t
w+ l- < <
, u
.Jf.. -
I (
pg @.'
g V. e .
> 3 4 ,i g :. . . .
.. A. .p, j.7' >
t*g-t r
- 4. , j, rh $s s
a' ,,6, ), m. .-r-. i u t ;- c li :14- . . .
., k k b f p php} y s>
q;- '
m',? dv*,
t:
~
- t. i.
4_ l
(, n';,h j g 'r; '. f a 3 }: e
- .' .y
? , . ;5 \',\:-y n ,v.
di" .
f'- L
-f 4~-
, e 60 3 99 09 J i
- - 1 4.
I
- i. t'; it '[
, , . - 4y h ;M ;t..- vj ';9 _-g s 3
> ,z, . .
.c 'J
-.Lf I
) h i.'i
]-
h (l.
.k, ' ' ' ,, i j;[' %'s'i _ t
'd t i ' :x Y-Q -* , ,. ;i..
31 qi$: t -1,4t *;i"i < s Dl ,,
jl
- ,_. c p e, , -
. y. ,
,\& f ,?, _. , ' I g_,- 3 %,dr ,<i
- ,'q - ?OB ,
s y %' i W I. O _g
}.."is;
'1
%,
.< .% 2 j i .- -- --
i t .p 9 ; . _ g,p -
1*
a s m. .a o "
i Mj 1%,pf[li x l ,
, .[ k,- f_h,5.k . i hf 1 j' cw--
y&ps A:}W(':*, : '
r :fCQ/ 1 3 JW I hi , y ,N ! g. .3' ,
w x.a.1 n.
V f r, 7
r=
- ' Ni '\
. .' .s l4- w: e;'.i n. ,h, 1
.r m 6. ti p' 5
- ~,g;: -
> r y.g ~
g s . f ' !.1 ff').,.
I p f
jlfft - '
9
. . .o.( k .h 0 .-
b I g,,
m_ d.m fb I,
. ,. ,),aw I 4
.4 i p' b 'k f,,
U.[ty'b ;
't>$J i r * .^4? s
- t
[;
++ 1 s . :1
.Jr f
.;$ { . *= p
.(
( 5 4 2 . , CI
' ^
4
,w i, h r p
,[
t ,
+m:
5' i y '_ , 5 t l
- i. .( . ;
i ?
} *4:( qIr r.. e r
't E e T
}f .
T 1 '_ [, , ,
t
-y Sf . . J
- -m .
wm 1
'Th ^ "'; , j> . afG.;:g ,,.Q Q W..}') l r
s if
- .>bf l W[
1, .v3,'n:Q u Q' ; f f s 'M h -
+
'iM n '. s ; L, , , , _ . , ,_ ,. ,
__ j
U VALVE RRQUEST FOR NF2JPF NO. 27 l (Cold shutdown Jtstification)-
COMTOENP _q1CN CIASS CATEGORY 1SWP*V172 Stardby service water supply 3 C header to normal service water supply header isolation check TEST REOUIREMENT: Per IWV-3521, check valves shall be exercised at least Once every three months.
RASIS FOR
.,REIJEF: The exercise testing of the V172 valve during normal operation could challenge plant safety syspems. Standby service water systen is approximately 20'T cooler than normal service water when started. ~This is a rapid 5A increase in the flVAC delta T's of unit coolers supplied by service water. In particular, llIVR*tC8 (main steam tunnel) could exceed its delta T setpoint causing an-isolation of the MSIVs and a reactor scram. Therefore, a test of #V172 in the open direction is considered hazardous to plant operation / reliability.
ALTFJNATE TESTING: An open exercise test. for this valvo during cold shutdown.
s
k ,V l,,o -..-
VALVE RHQUEST FOR RPLTPF NO. 33 4 FUNCTICN . CLASS CATfm RY
_004P%7NT
. (1 ea. for each-of' 145 lICU's):
-IC11*V114 _ Outlet scram check valve 2 C 4
- 1C11*V115 Scram accunulator charging 2 -C water check valve SA
- j. IC11*V138 Scram accumulator cooling 2 -C' !
water check valve l TIC 11*A0V126 Inlet scram valve 2 B
'1C11*A0V127 Outlet scram valve 2 B O TEST .!
REOUIRFMENT: Per IWV-3411 and IWV-3521, . Category A and B valves and '
check valves shall be exercised at least. once'..every -]
three months. Per IhV-3413 (b), the stroke of tine of -
"all power operated valves shall.be' measured..."
1.
. BASIS FOR RELIEP: Exercise and stroke time testing of the valves would
]*
~
a require - scranming the associated control rod during power operation. The stroke tine testing of the -scram valves is adequately perfonned by the CRD scram tine, d
, and rod notion would be inhibited hv failure of the valves to seat. This confirms valve V138 closes. SA Improper operation of any of the other valves will also 7 adversely affect the: CRD scram tine. A surveillance-
. test confirms
- hat the CRD: scram accumulators hold pressure ~ for a minimum period . ' of . tine. This also confirms' that V115 closes, i
f s g 3
e
+
t
, e .
., o . . - ,,:2 AT1rEINATE TPSTING: Scram testing of-the associated control rod drive as required by Technical- Specifications- 4.1.3.2.c of at.
least once per 120 days will prove proper ~ operation - of the subject valves. Acceptable scram tinr:s will be the
. acceptance criteria' for the subject . valves -for exercising the stroke timing. . Valve V138 will be tested on the same frequency as the air operated scram valves.
Valve V115 is confirmed . closed during- the= HCU accumulator pressure decay test performed per Technical SA Specification 4.1.3.3.b every refueling.. t This ' alternate. testing is in conformance.with NRC Generic Letter 89-04, Attachment 1, Item 7,_ for alternate testing of individual CRD valves in BWRs.
l tl i- i e t
, 'i- e o
[ ff
r _
3 VALVE RIKKEST FOR RELIEP NO. 58 COMPCNFNP FUNCTION CIASS CATETORY -
ISWP*V326 Standby service water supply 3 C header loop A isolation check with normal service water ISNP*V327 Standby service' water supply 3 C header loop B isolation check with nonnal service water t
ISWP*MOV57A,B StaMby service water supply 3 B header isolation with nonnal
(' service water !
TEST REOUIRIM WP: Per IWV-3411 and IWV-3521, Category A and B valves and I
-check valves shall be exercised at least once every three nonths.
. I BASIS FOR RELIEP: Check valves V326 and V327 are verified open by normal plant operations. In order to test these valves closed it is necessary to secure the normal service water locp resulting in the shutdown of e sential equipnm t for the safe operation of the plant such as instrument air. As !
a minimum, this requires supplying a temporary backup instrument air canpressor. In most shutdowns 'it would also be necessary to supply a temporary neans of cooling the condensate punp which would be in service for RPV level control.
In'a short shutdown > these activities' would be too 5A expensive and difficult to set- up. In a refueling outage, these items are prearranged and can be carried out without risk to the plant or public.
Closing bOV57A/B without operating standby service water in advance would cause an automatic initiation (ESP) of i standby service water. Operating Division ~I . standby service water at power is ~likely to cause an MSIV isolation on high HVAC delta T due to the sudden inrush 1 of cold water to the unit cooler for the main steam tunnel from the staMby cooling tower.
i
1
, :. e..
=<. .
ALTEINATE' An exercise test' for each valve during every_ refueling-.
TESTINGr.
outage, I
$$f .
e i
d' e $, -
,