ML20044C293

From kanterella
Revision as of 06:01, 12 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Repts for Jan 1993 for Catawba Nuclear Station,Units 1 & 2
ML20044C293
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 01/31/1993
From:
DUKE POWER CO.
To:
Shared Package
ML20044C282 List:
References
NUDOCS 9303220054
Download: ML20044C293 (1)


Text

e i

t CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT January 1993 >

t

1. Personnel Exposure - i Duke Power Company has changed the monthly monitoring exposure report to quarterly. First quarter TLD results will be available for inclusion in the April 1993 report.
2. The total station liquid release for January has been compared with the Technical Specifications maximum annual .

dose commitment and was less than 10 percent of this limit.

The total station gaseous release for January has been compared with the Technical Specifications maximum annual dose commitment'and was less than 10 percent of this list.

  • t k

9303220054 930315 PDR ADDCK 05000413 R PDR l

r DOCKET: 50-414 l UNIT: _ Catawba 2 l Date: 03/15/93  !

i NAR.RATIVE

SUMMARY

l MONTH: February 1993 .;

Catawba Unit 2 began the month of February in end-of-cycle 5 refueling outage. The unit was in the outage ,

for the entire month. j i

I F

l b

5 h

i

.t i

Prepared by N. C. Simmons Telephone: 704-382-5263  ;

' ' ' :LL.:n

-