MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
.
0?ERATING DATA REPORT DOCKET NO 50-413 DATE May 13. 1994
'OPERAi!NG STATUS COMPLETED BV R.A. Williams TELEPHONE 704-362-5346
-1. Unit Names Catauba 1
- 2. Reporting Period: April 1, 19%-April 30, 1994
- 3. Licensed Thersal Pcwer (MWt): 3411
- 4. Nameplate Rating (Gross MWe): 13055 Notes *Naseplate Rating
- 5. Design Electrical Rating (Net MWe): 1145 (6 toss MWel cattulated as
- 6. Mariaan Dependable Capacity (Bross MWe): 1192 1450.000 MVA x .90 power
- 7. Maxirun Dependable Ccpacity (Net MWe): !!29 factor per Page 111,
- 3. If Changes Occur in Capacity Ratings (! tees Nur,ber 3 Through 7) Since last NUREG-0020.
Report. Give Reasons:
- 9. Power level To Which Restricted, if Any (Net MWe):
- 10. Reason For Restrictions, If any:
This Month Yr.-to-Date Cuaulative
- 11. Haurs In Reporting Period 719.0 2079.0 77472.0
- 12. Number Of Hours Reactor Was Critical 719.0 2852.6 58630.6
- 13. Reactor Reserve Shutdown Hours --0-- --0-- --n-- ;
- 14. Hours Generator On-Line 719.0 2041.1 57494.5
- 15. Unit f!eserve Stutdcun Hours --0-- --0-- ~
- 16. Gross Thersal Energy Benerated (MWH) 2450755 9403252 186645798 j
- 17. Gross Electrical Energy Generated (MWH) 871726 3367761 65731896
- 18. Net Electt: cal Energy Generated (MWH) 827610 3192189 61736818
- 19. Unit Ser< ice Factor 100.0 98.7 74.2
- 20. Unit Availability Factor 100.0 98.7 74.2
- 21. Unit Capacity Factor l'Jsir? MCC het) 102.0 98.2 70.3
- 22. thit Capacity Factor (Using DER Net) 100.5 96.8 69.6
- 23. Unit Forced Outage Rate 0.0 1.3 9.9-
- 24. Shutdcan Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None j
.j
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup- I
- 26. Units in Test Status (Frict to Cosaercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL CPERATIGN 9405180377 940513 PDR ADOCK 05000413 R PDR
i OPERATING DATA REPORT DOCKET NO 50-413 UNIT Catawba !
DATE May 13, 1994 -j COMPLETED M R.A. Willians i TELEPHONE 704-382-5346 l
MCliTH H nl, 1994 l 1
DAY AVERASE DAILY F0WER LEVEL LAY AVERAGE DAILY PDWER LEVEL j (MWe-NetI (MWe-Net) ;
1 1162 17 1157 ,
2 1161 18 !!57 3 1157 19 1!54 ;
4 !!59 20 !!51 ,
5 1157 21 !!53 6 1150 2d !153 7 1155 23 1157 8 1133 24 1155 9 1157 25 1147 .;
10 !!53 26 1141 11 1150 27 1142 12 1151 28 1140 13 !!49 29 !!39 14 1155 30 !!37 15 1150 16 1153 l
- iT
)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-413 UNIT NAME tarawr$a 1 DATE ub/laf94-REPORT MONTH April 1994 COMPLETED BY x. a. winbland TELEPHONE ( / us J -J UZ-DJ 4 t>
(1) 2) 3 (4) (5)
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1) (2) (3) (4)
F Forced Reason
- Method: Exhibit G - Instructions S Scheduled 1-Manual for Preparation of, Data A-Equipment FailureB-Maintenance or test (Explain) 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction E-Operator 1 raining & License Examination 4-Other (Explain) File (NUREG-0161))
F-Administrative (5)
G-Operator Error Exhibit I-- Same Source H-Other (Explain) (Explain) m = e
~ . . __ _-. --_. - - . _ _ _ _ _ _ - - - - _ _ _ - _ _ _ - - - - - _ - _ _ _ _ -
1 l
DOCTr: 50-413 L UNIT: Catawba 1 Date: 05/13/94 NARPATIVE SLM4ARY l \
MONIH: April 1994 Catawba Unit 1 began the month of April operating at'100% full power. 'Ihe unit operated at or near 100% full power for the entire month.
l \
t l
1 l
1 1
l i
l Prepared by: R. A. Williams Telephone: (704)-382-5346 l
+
4 I
MONTHLY REFUELING INFORMATION REOUEST
- 1. Facility _name: Catawba, Unit 1
- 2. Scheduled next refueling shutdown: February 1995
- 3. Scheduled restart following refueling: April 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 ;
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information. ;
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, i significant changes in design or new operating procedures). ;
- 7. Number of Fuel assemblies (a) in the core: 193 :
(b) in the spent fuel pool: 484
- 8. Present licensed fuel pool capacity: 1418 .
Size of requested or planned increase * --- !
i
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: September 2009 -
DUKE POWER COMPANY DATE: May 13, 1994 l Name of
Contact:
R. A. Williams Phone: (704)-382-5346 r
CPERATIN5 DATA REPORT I
DDCKET ND 50-414 DATE rdy_13.1994 OPERAilNG STATUS COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 4
- 1. Unit Nase: Catawba 2
- 2. Reporting Period: April 1, 1994-April 30, 1994
- 3. Licensed Thermal Power (MWti: 3411
-4. Nameplate Rating (Gross MWe): 13054 Notes *Naseplate Rating
- 5. Design Electrical Rating iNet N ei: 1145 (Stoss NWe) calculated as ,
.6. Maxisue Dependable Capacity (Srcss N e): 1192 1450,000 MVA x .90 power
- 7. Maximus Dependable Capacity (Net N e): !!29 factor per Page iii, ,
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last NUREti-0020.
Report. Give Reasonst
- 9. Poner Level To Which Restricted, If Any (Net Nelt
- 10. Reason For Restrictir,ns, If any:
l 1
This Month Yr.-to-Date Conclative it. Hours in Reperttag Period 719.0 2879.0 67483.0-
- 12. Nusber Of Hours Reactor Was Critical 694.2 2954.2 52795.1
- 13. Reactor Reserve Shutdown Hours - --0-- --0-- -j
- 14. Heers Benerator On-Lir,e 693.3 2818.8 51898.3 -j
- 15. Unit Reserve Shutdown Hours - --0-- --0--
- 16. Gross thersal Energy Generated (NH) 2224826 9140659 166029699
- 17. Gross Electrital Er.ergy Generated ( NH) 796128 3230126 58857385
- 18. Net Elettrical Erergy Generated (NH) '753437 3109599 $$399656
- 19. Unit Service Facter 96.4 97.9 76.9
- 20. Unit Anilability Facter 96.4 97.9 76.9 21, that Capacity Factor fusing MDC Net) 92.B 95.7 72.5
- 22. Unit Capataly f actor (Using DER Net) 91.5 94.3 71.7
- 23. Unit Forced Outage Rate 0.0 1.2 9.2
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
)
Current 1v RgLuelinn _ i 1
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: June 27, 1994 I
- 26. Units In Test Status (Prior to Coseercial Operation): Forecast Achieved j INITIAL CRITICAllTY INITIAL ELECTRIC!iY COMERCIAL OPERATION l
l
. . . - - - . .-. . ~..
t i
CPERATING LATA REPORT P
DOCKET ND 50-414-UNIT Catanba 2 !
DATE May 13, 1994 5 COMFLETED BY F.A. Willian TELEPHONE 704-352-5346
-i MONTH 4ril, 1994 DAY AVERASE DAILY PDWER LEVEL DAY AVERABE DAILY POWER LEVEL (PWe-het) (MWe-Met) 1 1150 17 1143 2 1149 10 !!43 3 1144 19 1139 4 1147 20 1139
'5 !!43 21 1142 i i
6 1139 22 !!43 7 1146 23 1146 8 1149 24 !!43 I
9 1144 25 1116 10 !!39 26 1100 11 !!33 27 1085 ,
t 12 !!40 28 626 13 1133 29 144 14 1140 30 0 15 1136 16 1139 i
I 4
i h_.- , . .- m.. --4, , ,-
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414 UNIT NAME miawisa, e DATE unfia/94 REPORT MONTH April 1994 COMPLETED BY x. a. winbland .
TELEPHONE (/us)-auz-da4o (1) (2 (3) (4) (5)
A)
E RET-HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 3-P 94- 4-29 S --
B --
IA XXXXXX POWER / INTERMEDIATE RANGE ANALOG CHANNEL OPERATIONAL TEST 4-P 94- 4-29 S --
B --
IA XXXXXX HOLD AT 18% POWER FOR INTERMEDIATE RANGE ANALOG CHANNEL OPERATIONAL TEST 5-P 94- 4-29 S --
C --
RC FUELXX RAMP DOWN FOR END-OF-CYCLE 6 REFUELING OUTAGE 2 94- 4-29 S 25.67 C 1 RC FUELXX END-OF-CYCLE 6 REFUELING OUTAGE (1) (2) (3) (4)
F Forced Reason
- Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER >
D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161) )
E-Operator Training & License Examination F-Administrative G-Operator Error H-Other. (Explain) (Explain) (5[xhibit e I - Same Source
.. . _. ~
t DOCKET: 50-414 UNIT: Catasta 2 Date: 05/13/94 NARRATIVE
SUMMARY
MJt m i: April 1994 Catawba Unit 2 began the month of April operating at 100% full'pcwer. On 04/25/94 at 0600 the began decreasing to 97% pcuer and held from 0906 to 04/27/94 at 2000 for steam generator power operated relief valve and power operated relief valve isolation valve testirq. 'Ihe unit began decreasing pcuer for end-of-cycle 6 refueliry outage on 04/27/94 at 2000. On 04/29/94 at 0958 the unit held at 20% pcuer i for power range and intermediate rarse analog channel operational tests. The unit began decreasirg power to 18% at 1345 and held at 1430 to perform intennediate range analog channel operational tests. At 1455 the unit resumed ramp down for end-of-cycle 6 refueling outage. 'Ihe unit was rernoved from service fcr end-of-cycle 6 refueling outage on 04/29/94 at' 2219. 'Ihe unit was in the outage the remainder of the month.
i l
l Prepared by: R. A. Williams Telephone: (704)-382-5346
i I' MONTHLY REFUELING INFORMATION REQUEST i.
- 1. Facility-name: Catawba. Unit 2
- 2. Scheduled next refueling shutdown: Currently Refuelina
- 3. Scheduled restart following refueling: June 1994 i THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
f 4. Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be? !
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
- 7. Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 356
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned-increase: ---
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE: May 13, 1994 Name of
Contact:
B. A. Williams Phone: (704)-382-5346 l