Responds to NRC 810402 Ltr Re Violations Noted in IE Insp Rept 50-483/80-22.Corrective actions:rip-rap on Ultimate Heat Sink Will Be Listed in FSAR Table 3.2-1 as safety- Related by 810615
ML19350D869
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/29/1981
From: Bryan J
UNION ELECTRIC CO.
To: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19350D868 List:
References
ULNRC-438, NUDOCS 8105190597
Download: ML19350D869 (3)


Text

3- .e

  • l t-

, 7 UNION ELECTRIC CQMPANY

) loot ORATIOT STREET

, 57. Louis, Missouma

. - .. ~

...., Apri1 29, 1981

~7;:.':::,":.".

.,. w o... ....ou.,.....

Mr. Gaston Florelli, Chief Reactor Construction & Engineering Support Branch US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 ULNRC-438

Dear Mr. Fiorelli:

INSPECTION REPORT NO. 50-483/80-22 This is in response to your letter of April 2,'1981, indicating that IE:HQ had confirmed the validity of non-compliance item 483/80-22-01, regarding the safety-related classification of the Ultimate Heat Sink rip-rap. On April 24, 1981 Mr. Konklin granted a one week extension in the response due date.

The following is in response to item 1 in Appendix A, Notice of Violation, of inspection report 50-483/80-22 transmitted with your letter dated September 29, 1980.

Infraction (483/80-22-01) 10CFR50, Appendix B, Criterion II states, in part, that "The applicant shall identify the structures, systems and components to be covered by the Quality Assurance Program."

The FSAR Sectivn 17.1.2 states, in part, "The Quality Assurance Program is to be applied,to those structures, systems, equipment and components that are necessary to assure the integrity of the reactor coolant pressure boundary, the capability to shutdown the reactor and maintain it in a safe shutdown condition, or the capability to prevent or mitigate the consequences of accidents which could result in potential offsite exposures..."

Contrary to the above, the rip-rap on the ultimate heat sink is not listed in Table 3.2-1 of the FSAR as safety related. Further-more, material cest results could not be located while on site. The rip-rap appears to

.ie placed improperly, in that it is not graded l and there are pockets of fine material on the I

surface.

810519069~7 w_

Mr. Gaston Fiorelli April 29, 1981

Response

CORRECTIVE ACTION TAKEN AND RESULTS ACHIEVED Rip-rap on the Ultimate Heat Sink will be listed in Table 3.2-1 of the FSAR as safety related.

Material test results have been located and are available for inspection at the site.

Our geotechnical consultant, who inspected the completed rip-rap installation, identified in a preservice inspection report some areas of rip-rap that were considered either unacceptable or marginally acceptable. These areas were reinspected by the constructor and reworked as necessary. The con-sultant reinspected the rip-rap installation and the reworked areas and with Union Electric's concurrence accepted the rip-rap and deemed it adequate.

CORRECTIVE ACTION TO BE TAKEN TO AVOID FURTHER NONCOMPLIANCE Rip-rap for the Ultimate Heat Sink will be listed in Table 3.2-1 of the FSAR as safety related. Specifica-tion No. 10884-C-001 for the rip-rap, will be revised to a "Q" specification.

THE DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance is expected to be achieved by June 15, 1981.

In paragraph 2 of Mr. Keppler's letter to me dated April 2, 1981, it is stated that we should include slope protection inspection of the UHS as a FSAR commitment. Table 2.4-14, sheet 3 of 5, paragraph 2.a.5 of the FSAR contains our commitment for slope protection inspection and we are proceeding on this basis.

If you have any questions regarding this response or if

, additional information is required, please let me know.

Ver truly yours,

/ss- 44 ~ meg j Jdin K. ryaf.

WHZ/jds

(

cc
Mr. J. E. Konklin, NRC Region III Mr. W. A. Hansen, NRC Resident Inspector, Callaway Plant Missouri Public Service Commission

L.

4 STATE OF MISSOl'RI)

) SS CITY OF ST. *OUIS) u John K. Bryan, of lawful age, being first duly sworn upon oath says that he is Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same~for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.

By bf JN\ %h L

~' John K! Bryas Vice Presidekt \

Nuclear SUBSCRIBED and sworn to before me this 29th day of April, 1981 I