Notifies of Error in 790713 Ltr Which Responded to IE Bulletin 79-13, Cracking in Feedwater Sys Piping. Feedwater Piping Sys Was Not Inspected on 790627.Only Steam Inlet Generator Nozzles Have Been Inspected
ML19208D697
Person / Time
Site: North Anna Dominion icon.png
Issue date: 08/08/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
530A, NUDOCS 7909290364
Download: ML19208D697 (1)


Text

~~^

G ,i VznorxrA Ez,zcTnze Axn Powna CoxPAxy .';

Rzcanown,VzmozwzA 20261

.2 :D

_ 40 w ._

August 8, 1979 >

c.:::

co Mr. James P. O'Reilly, Director Serial No. 530A -

Of fice of Inspection and Enforcement P0/FHT:sej U. S. Nuclear Regulatory Commission Docket No. 50-339 Region II License No. CPER-78 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Subject:

IE Bulletin 79-13 Amended Response

Dear Mr. O'Reilly:

Our July 13, 1979, letter, Serial no. 530, in response to IE Bulletin 79-13

" Cracking in Feedwater System Piping", stated that the North Anna Unit 2 feed-water piping had been inspected on June 27, 1979. This is incorrect, as only the steam generator inlet nozzles have been inspected to date. The remaining inspection effort will be completed in a timely manner consistent with the requirements of the subject bulletin.

Very truly yours, 4

. \ hd L6Nc)>

C. M. Stallings Vice President-Power Supply and Production Operations D*9 0 9

9 o1 1056 080 "o~3- T '1 q40 a _AJ_1 '

79o929 0 4 .