ML19208D697
| ML19208D697 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 08/08/1979 |
| From: | Stallings C VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 530A, NUDOCS 7909290364 | |
| Download: ML19208D697 (1) | |
Text
~~^
,i G
VznorxrA Ez,zcTnze Axn Powna CoxPAxy
.2
- D Rzcanown,VzmozwzA 20261 40
_w August 8, 1979 c.:::
co Mr. James P. O'Reilly, Director Serial No. 530A Of fice of Inspection and Enforcement P0/FHT:sej U. S. Nuclear Regulatory Commission Docket No.
50-339 Region II License No. CPER-78 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Subject:
IE Bulletin 79-13 Amended Response
Dear Mr. O'Reilly:
Our July 13, 1979, letter, Serial no. 530, in response to IE Bulletin 79-13
" Cracking in Feedwater System Piping", stated that the North Anna Unit 2 feed-water piping had been inspected on June 27, 1979. This is incorrect, as only the steam generator inlet nozzles have been inspected to date. The remaining inspection effort will be completed in a timely manner consistent with the requirements of the subject bulletin.
Very truly yours,
. \\ hd L6Nc)>
4 C. M. Stallings Vice President-Power Supply and Production Operations D*9 0