ML19331C773

From kanterella
Revision as of 17:29, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 80-026/01T-0
ML19331C773
Person / Time
Site: Millstone Dominion icon.png
Issue date: 08/12/1980
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19331C774 List:
References
MP-2-4454, NUDOCS 8008190512
Download: ML19331C773 (1)


Text

.

. r s NOIt'ITII!JUiT IFFII.ITIIIS

200',%C7 T!r"' P.o. Box no 1 "

T.?l':'! ,=0."O'.t'," "~' "^"[$g, m numiceai k L J Z : 0 0;'::l 0 'll 1'l August 12, 1980 MP-2-4454 Mr. Boyce H. Grier .

Director, Region I Office of Inspection and Enforcement U. S. Nuclaar Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336 Reportable Occurrence R0-50-336/80-26/lT-0

Dear Mr. Grier:

This letter forwards Licensee Event Report 80-26/lT-0 required to be submitted within 14 days pursuant to Hillstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.8.1, discovery of conditions not specifically considered in the SAR or Technical Specifications that require remedial action or corrective measures to prevent the existence or development of an unsafe condition. An additional three copies of the report are enclosed.

Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY W

. J. Mroczka" Station Superintendent Millstone Nuclear Power Station EJM/JJK:11s

Attachment:

LER 80-26/lT-0 cc: Director, Office of Inspection and Enforcement, Washington, D.C.(40) '[

Director, Office of Management Information and Program Control, Washington, D.C. (3)

) U. S. Nuclear Regulatory Commission, c/o Document Management

Branch, Washington, D.C. 20555 i l

80081905/4-5