MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
= . _ . .- -- .. .. . . . - - .
1 i
\ i I i i +
1
- (
) i
[
j l !
1 i i VIRGIrlIA ELECTRIC Afl0 POWER COMPANY i
- NORTH ANNA POWER STATI0ft i
- MONTHLY OPERATIf;G REPORT 1
) MONTH 4,,n,,e t YEAR m i >
j 1
1 l
i
- APPROVED:
1 4
thV 4 l STATION MANAGER U 8009290 32.)
. ~ , , ,.e , e- .,- . . - - , , - ,n. . ,._ ..,--,~ ----..,-.,..,.,e-, ,.v. ,,+ e.- - - - - -,. . . _ . . - , . . , . . - ~ . - , . , , . .---..--..-,n-.-
r AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT t1A 1 DATE 9-9-80 COMPLETED BY W. A. Woodsmall, III TELEPHONE (703) 894-5151 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 1 809 37 f>31 2 810 is 833 3 808 39 838 4 808 838 20 5 808 21 838 6 807 22 838 7 807 23 836 8 807 24 828 9 809 25 820 to 744 26 810 II 83? 27 835 12 831 g4j 33 13 830 29 835 la 809 30 829 15 834 837 3
16 830 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) 1
r . -- _ -_ _ _ _
OPERATING DATA REPORT DOCKET NO. 50-333 DATE 09-09-80 COMPLETEU llY W.A.Woodp all,III TELEPilONE 701/R04-6151 OPERATING STATUS N"
I. Unit Name: North Anna 1
- 2. Reporting Period: A urrust 1980
- 3. Licensed Thermal Power (MW ): 2775
- 4. Nameplate Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross MWe): 880
- 7. Maximum Dependable Capacity (Net MWe): 850
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gise Reasons:
N/A
- 9. Power Lesel To Which Restricted,If Any (Net MWe): N/A
- 10. Reasons For Restrictions.lf A.ny: N/A This Month Yr..to.Dat e Cumulatise iI. Ilours in Reporting Period 744 5,855 19,632
- 12. Number Of flours Reactor Was Critical 744 4.979.B Z5.145.0
- 13. Reactor Reserve Shutdown flours 'O 55J 203.9
- 14. Ilours Generator On.Line 744 4,780.7 14,833.9
- 15. Unit Reserse Shutdown floun 0 0 0
- 16. Grow Thermal Energy Generated (MWH) 2,037,456 12.15B 0B1 38.437.994
- 17. Gross Electrical Energy Generated (MWH) 6 J R . J2.9_ . _. 1 #06. 70R 7? 797.747
- 18. Net Electrical Energy Generated (MWH) 611.343 3.577.404 11.430,gs0
- 19. Unit Service Factor 700 B7.6 75.5
- 20. Unit Asailability Factor 100 BZ.6 75.5
- 21. Unit Capacity Factor IUsing MDC Net) 96.7 71.9 69.5
- 22. Unit Capacity FactorIUsing DER Net) 90.6 67.4 64.2
- 23. Unit Forced Outage Rate o 11.3 6.B
- 24. Shutdowns Scheduled Oser Next 6 Months ITy pe. Date,and Duration of Each):
Refuelina-six weeks t Deceml>er 1980 and Jangqru 1991
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Unit > In Test Status Irrior to Commercial Operation): Forecast Achiesed INITIA L CRITICALITY INITI AL ELFCTRICITY CO\1M ERCI A L OPER ATION 10/77)
b DOCKEI NO. _8_0-338 UNITSilUIDOWNS AND PODER REDUCllONS ' rth Anna 1 UNil N AME DAIE _-9-80 COMPLETED ny Neuter Ittp0R1 hl0 Nill Auoust 1980 irt.ErilONE TT03) 894-5151 ext. 22' h.
- f 8
!! ., jg 'h Y f, Licensee E*, k Cause & Corrective N. . Date y H, gx 3g @
y
)s5 Eveni y un u At tl"" 8" jgg Itepost a g Pievent Itecurience 6 b I .
j No si';nificant pcwer eductic nS or plant Shutdown'S.
}
, d b, .
1
, t
, I: Forced Iteason: Metintil: Exhibit G . Instructions S: Stlieduled A Lpeipment Failnre(Explain), I Manual for Picparation of Dana D Mainte sance niTest 2-Manual Sciarn. Entry Sheels for 1.icensee C.itefueling 3 Automatic Sesam. Event !tepost (l.I'1111 !c (Ntilti G-D.Itegulatory itest Iction 4-Olher (Explain) 0161)
- E Operator Training & IJcense Examination i F Adndnistrative 5 ti Operational 1
- ssos (Emplain) thhibit I- Same Source p:/77) ll Other (Earlain)
OPERATING DATA REPORT DOCKET NO. 50-339 DATE 9-9-W COMPLETED BY W. A. Woodsmall, IIK TELEPHONE (/U3) W4-5151 OPERATLNG STATUS N
- 1. Urdt Name: Nnrth Ann 3 9
- 2. Reporting Period: Auonst 1990
- 3. Licensed Thermal Power (MWt): 277G .
- 4. Nameplate Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross MWe): 429
- 7. Maximurn Dependable Capacity (Net MWe): 898 8' If Changes Occur in Capacity Ratings (1tems Number 3 nrough 7) Since Last Report. Give Reasons:
Item 1 channart frnm 170 en 977c h;, r,.11 tw ..g r i 4,gmc7 a3+na p_71_on
- 9. Power Level To Which Restricted,if Any (Net MWe): N/A ,
- 10. Reasons For Restrictions,if Any: N/A l
his Month Yr to-Date Cumulative
- 11. Hours in Reporting Period 744 1 9nq 1 9no
- 12. Number Of Hours Reactor Was Critical ??G P 7'4 A 4 776 4
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On-Line 55 s; RR
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 39.455 4 4 R17 a1 917
- 17. Gross Electrical Energy Generated (MWH) 8.174 _ _ ,
8.174 8.174
- 18. Net Electrical EnerEy Generated (MWH) 6,562 _
6.56? 6.562
- 19. Unit Service Factor _ N/A N/A N/A
- 20. Unit Availability Factor N/A M/A M/A
- 21. Unit Capacity Factor (Using MDC Net) N/A N/A tDA .
I
- 22. Unit Capacity Factor (Using DER Net) N/A _
N/A N/A
- 23. Unit Forced Outage Rate N/A N/A N/A l
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht: ,
TMI 'A d i f f r n + 1 n n e - Mnunn,hnr 1 1000 11 Asur l Maintenance: April 1. 1981- 11 d5vs
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: 09-4-80
- 26. Units In Test Status (Prior to Commercial Operationi: Forecast Achieved INITIA L CRITICALITY -6/12/80 INITIAL ELECTRICITY 8/P5/80 COMMERCIAL OPERATION 11/15/80 1o/77) l 1
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-339 UNIT NA 2 DATE 9-9-80 COMPLETED BY kl. A. Woodsmall, III TELEPHONE - (703) 894-5151 MONTH Aunust DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 n
. 2 0 18 0 3 0 _
19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 _
8 0 24 0 9 0 25 28 10 0 26 la l1 0 27 102 12 0 28 128 13 0 29 0 14 0 30 0 15 0 3, 0 16 0 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
50-339 DOCKET NO.
UNIT SHU1 DOWNS AND POWER REDUCTIONS Noreh Anna 2 UNIT N AME DATE no-no an COMPLETED BY A.G- Neufer August REPORT MONTH T ELEPHONE 703/894-5151 5g 3 y Licensee ,E r, Cause & Corrective No. Date g 3g i js5 Event p h'8 gu Action to H
f: 5 jgg Report # mV g Presen Recurrence 6 .
Initic 1 Power Gene ratic1 begins 08-2 i-80 at 0547. (Not ccmmerci al) 80-01 80-08-26 F 18.1 H+ 3 Turbine trip / Reactor trip when genera-tor breaker was openec'. Placed recor-ders on Ibactor Protection Circuits to tra.m cause.
80-02 80-08-27 F 2.4 H* 3 Turbine Trip /Roactor Trip when Oversped Protection Controller was activated during test.
80-03 80-08-28 F 2.0 A* 3 Steam Gcnerator Lo Level Reactor Trip caused by loss of Feedwater Flow when Condensate Pump Suction Straincts were l
clogged up. C1 caned straincts.
80-04 80-08-23 F 79.5 D 1 280-051/037,0 W VALygg Unit Shutdown to comply with Technical Spccifications TS. 3.6.3.1 Fcedwater/
Containment Penetration Tsolation.
I 2 3 4 F: Forced Reason: Method: Exhibit G. instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C. Refueling 3 Automatic Scram. Event Report (LER) File (NUREG.
D-Regulatcry Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I- Same Source (9/77) li Other (Explain)
-sco Attached Sheet
(2) .
DOCKE1NO.
UNil SIIUIDOWNS AND POWI:R REDUCI10NS UNIINAML DATE 00-09-90
,1.G.Neufer
, COMPLElED BY REPORT MONIll ,,ugust TELEPItONE 703/S94-5151 C
- !g 3 $
j~[y 5 Licensee E-t, {q Cause & Corrective No. DJte g 3g % Event gy ]
O Action to H yE $ ygc e
Report */ to U o u
Present Recurrence 6
80-04 F Conti tues chrough end of . month.
Shut Down I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Schedu ed A. Equipment Failure (Explain) 1 Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event ReporI (1.ER) hie (NURI G-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F Administrative 5 G-Operational Erroi (Explain) Exhibit ! - Same Source (9/77) Il Other (Explain)
Page 1 of 1 4
UNIT SilUTDOWN AND POWER REDUCTIONS EXPL C'sTION SilEET DOCKET NO. 50-339 REPORT MONTH August UNIT NNIE North Anna 2 YEAR 1980 DATE 09-09-80 r
- COMPLETED BY A. G. Neufer l
80-01 Unit was being removed f rom service for a scheduled turbine overspeed test.
!, When the last generater output breaker was opened, the turbine and reactor
. tripped. An improperly set transmitter PT-MS-232 caused turbine valves to j pulse open raising the 1st stage press to greater than 10% (turbine power
- greater than 10% with generator output breakers open causes a turbine trip) j' resulting in a turbine trip and reactor trip.
l 80-02 When the Overspeed Protection Controller pulsed during the planned overspeed
- test it caused First Stage Impulse Pressure to go greater than 10% inducing
- a signal te reinstate the at-power trips.
! t I 80-03 Condensate Pump Suction Strainers clogged up causing a loss of Feedwater
! Flow. i 1