ML19345E271

From kanterella
Revision as of 05:13, 31 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revised Util Emergency Procedures
ML19345E271
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 12/03/1980
From: Parker W
DUKE POWER CO.
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML19345E268 List:
References
NUDOCS 8012230535
Download: ML19345E271 (2)


Text

,

2 .

DTJKE POWER COMPANY Powta Bettnixo 422 SocTu Caracu Srazzi. CitAat.orTz. N C. asa4a mw4 o. - =. s a. December 3, 1980

  1. ic t Dettio tse ? *t.tpacss Aata *04 Srtaan 8eCDvCt'Cas 3' 3--C 8 3

/ Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission [

Washington, D. C. 20555 Attention: Mr. 3. J. Youngblood, Chief -

Licensing Projects Branch No. 1

.-I --

Re: McGuire Nuclear Station ~ .','

Docket No. 50-369

Dear Mr. Denton:

Attached are copies of the following revised McGuire Emergency Procedures:

1) Immediate Actions and Diagnostics
2) Loss of Reactor Coolant
3) Steam Generator Tube Rupture Also included are copies of the following revised Abnornal Operating Procedures:
1) Inadequate Core Cooling
2) Loss of Steam Generator Feedwatar

! These procedures were revised based on comments received from Westinghouse and i

from the NRC Staff during their visit to McGuire on November 11 and 12, 1980.

To facilitate NRC Staff review of these procedures, a sheet has been added to each procedure which cross references each NRC comment to the appropriate step in the procedure.

It should be noted that the Inadequate Core Cooling procedure is for interim use until the final procedure developed by the Westinghouse Owners Group can be l reviewed by the NRC Staff and implemented by the station.

XOO3

. //

?Z:ISC:'ll. ?:17ACY INF0FutATION 22LC '; IN ACCO20A2 ICE #I31 THE TFG';C2.! CF ::7CR.!ATION ACT l

3 801oo30

! 1 ;

o-c _- _ T37 l

Mr. Harold R. Denton, Director December 3, 1980 Page Two If you have further questions regarding any of these procedures please do not hesitate to contact us.

Very truly yours, WMichl,/

William O. Parker, Jr.i GAC:ses Attachments

! cc: Mr. Walter J. Appley Battelle Pacific Northwest Laboratory Batelle Boulevard Richland, Washington 99352 d

i e

i l

l l

l.

i MSC.9AL ?317ACT I:GCR'lATI09 DEITZD I210C07.2A ;02 'YI"3 IHE

IEE0!4 0F IITF0FSATICN ACI a

j