ML20003B190

From kanterella
Revision as of 10:59, 30 January 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 81-002/03L-0
ML20003B190
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/30/1981
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20003B191 List:
References
MP-2-4579, NUDOCS 8102100500
Download: ML20003B190 (1)


Text

"

-2 . .

h $$ (5[bb3 bEk.N$(5kh P.O DOX 270 HART F ORD. CONNECTICUT OG101

.IN[$ 7/I[.'.$s N $ $ m

.. , o . ,6 a .m o ww (203) 006 6311

-L J N Y?ls$$$$l.5.5 January 30, 1981 MP 4579 Mr. Boyce H. Grier Director, Region I Office of Inspection and Enforcement -

U. S. fluclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 .

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336 1

Reportable Occurrence R0-50-336/81-2/3L

Dear Mr. Grier:

This letter forwards Licensee Event Report 81-2/3L-0 required to be submitted within thirty days pursuant to Millstone Unit 2 Appendix A Technical Specifications, Section 6.9.1.9.d, abnormal degradation of systems designed to contain radioactive material resulting from the fission process. An additional three copies.of the report are enclosed.

Yours truly, NORTHEAST NUCLEAR ENERGY COMPANY

. Mroczka v -

E.

Station Superintendent Millstone Nuclear Power Station EJM/CHC:mw

Attachment:

LER 81-2/3L-0 cc: Director, Office of Inspection and Enforcement,' Washington, D.C. (30) _

Director, Office- of Manage: rent Information' and Program Control, Washington, D.C. (3)

U. S. Nuclear Regulatory Commission, c/o Document Management-tS Branch. , . Washington,- D.C. 20555- -. . ..

_F m lj 54 l n __

'

Q[ R ;p

'O _

81_0210h5005 s

  • g

.. .