ML19322E713

From kanterella
Revision as of 23:30, 10 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards, Annual Update Rept-1980 on Const Settlement Monitoring Program. Due to Limited Amount of Data Obtained During Present Period of Const Activity,Second Update Rept Will Be Forwarded One Yr After Const Is Resumed
ML19322E713
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 03/31/1980
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Parr O
Office of Nuclear Reactor Regulation
Shared Package
ML19322E714 List:
References
NUDOCS 8004020157
Download: ML19322E713 (1)


Text

- .

VIRGINI A ELECTRIC AND POWER COMP ANY. RICHMOND, VIRGINI A 23268 March 31, 1980 Mr. Harold R. Denton, Director Serial No. 231A Office of Nuclear Reactor Regulation P5 ESC /CES:adw:mc Attn: Mr. O. D. Parr, Chief Light Water Reactors Branch No. 3 Docket Nos. 50-404 Division of Project Management 50-405 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

Our letter, Serial No. 231, dated April 6,1979 transmitted 40 copies of the report titled " REPORT ON THE CONSTRUCTION SETTLEMENT MONITORING PROGRAM FOR NORTH ANNA NUCLEAR POWER STATION-UNITS 3 AND 4, VIRGINIA ELECTRIC AND POWER COMPANY" dated April 2, 1979. The report addressed each of your concerns outlined in your letter of October 6,1978 relative to the development of a construction settlement monitoring program for all seismic Category I structures for North Anna Units 3 and 4.

Section 6.0 " Submittal of Data" of the April 2,1979 report specified that all settlement data obtained for Category I structures during construction will be submitted annually. The first annual report titled " ANNUAL UPDATE REPORT-1980 ON THE CONSTRUCTION SETTLEMENT MONITORING PROGRAM FOR NORTH ANNA POWER STATION-UNITS 3 AND 4, VIRGINIA ELECTRIC AND POWER COMPANY" has been prepared and we are forward-ing 40 copies for your information.

As stated in the ANNUAL UPDATE REPORT-1980, construction activities were limited during 1979 and no additional settlement monitoring points were installed during this period. At present, the Service Water Pump House (SWPH) is the only Category I structure being monitored and the data contained in the ANNUAL UPDATE REPORT-1980 is limited to that structure. Construction of the remaining Category I structures has generally not progressed beyond foundation placement. The settlement monitoring points for these structures will be installed when construction is resumed.

Due to the limited amount of data obtained during the present period of con-i struction inactivity, we do not anticipate forwarding a second update report to you until 1 year after construction is resumed and annually thereafter. Settlement monitoring of the SWPH will continue during this period and other Category I structures will be monitored as monitoring points are installed during construction.

The data obtained will be included in the secon,d update report.

,/ 1 you ,, ,

(' /f rowd, Sa ; C. QI&v> dr! '"

'

Senior Vice President Power Station Engineering and Construction l

\ t

,

800402015 7