ML17229B096

From kanterella
Revision as of 21:44, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr
ML17229B096
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/31/1999
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-99-088, L-99-88, NUDOCS 9904160174
Download: ML17229B096 (8)


Text

CATEGORY 1 .

REGULA~ Y INFORMATION D1STRIBUTI .SYSTEM (RIDS)

ACCESSI'ON NBR:9904160174 DOC.DATE: 99/03/31 NOTARIZED: NO DOCKET I FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-,389'St. Lucie Plant, Unit 2, Florida Power S Light Co. 05000389 AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power Ec Light Co.

STALL,J.A. Florida Power Ec Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Mar 1999 for St Lucie,Units 1 8c 2.With 990408 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR' ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 GLEAVES,W 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 01 1 OC/DBA/PAD 1 1 1

EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Florida Powers Light Company,6351 S. Ocean Drive, Jensen Beach, FL 34957 Aped.l 8, 1999 L-99-088 10 CFR 50.36 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2

'ocket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the March 1999 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant 9904160174 97033i PDR ADOCK 05000335 PDR an FPL Group company

DOCKET NO 50 - 335 UNIT NAME ST. LUCIE UNIT 1 DATE 04/05/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: MARCH 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 2160 154129.5
4. Number of Hours Generator On Line 744 2160 152493.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 636717 1848192 123768730

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie 81 DATE: Apr. 5, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH March 1999 Unit 1 operated at essentially full power for the entire month of March.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie N1 DATE: Apr. 5, 1999 COMPLETED J.A.ROGERS BY'ELEPHONE:

(561) 467-7296 REPORT MONTH March 1999 Number Date TYPe Duration Reason Method of Cause & Corrective 1 (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit l operated at essentially full poorer for the entire month of March.

3 F Forced Reason Method

- 1 - Manual S Scheduled A

- MaintenanceFailure Equipment tExplain) 2 - Manual Scram B

C - Refueling or Test 3 - Automatic Scram D - Regulatory Restriction - Continued E - Operator Training a License Examination 4

5 - Load Reduction F - Administrative 9 - Other <Explain)

G - Operational Error (Explain)

H - Other (Explain) 091587 IPL

DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE 04/05/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: MARCH 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 2160 117459.7
4. Number of Hours Generator On Line 744 2160 115810.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 637047 1844583 94850427

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: Apr. 5, 1999 COMPLETED BY: S.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH March 1999 Unit 2 operated at essentially full power for the entire month of March.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucia N2 DATE: Apr. 5, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE (561) 467-7296 REPORT MONTH March 1999 Number Date Type Reason Method of Cause tx Corrective 1 Duration 2 Shutting Action to (Hours) Down Prevent Recurrence Reactor3 Unit 2 operated at essentially full poem for the entire month of March.

1 2 F Forced Reason Method

- 1 - Manual S Scheduled A

- MaintenanceFailure Equipment tExplain) 2 - Manual Scram B

C - Refueling or Test 3 - Automatic Scram D - Regulatory Restriction - Continued E - Operator Training r License Examination 4

5 - Load Reduction F - Administrative 9 Other (Explain)

G - Operational Error tExplain)

H - Other tExplain) 091581 EFL