ML17241A363

From kanterella
Revision as of 21:23, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr
ML17241A363
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 05/31/1999
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, GL-99-2, L-99-133, NUDOCS 9906160259
Download: ML17241A363 (9)


Text

ATEGORY 1 REGULATU Y INFORMATION DISTRIBUTIOh SYSTEM (RIDS)

DOCKET FACIL:40-335 St. Lucie Plant, Unit 1, Florida Power &. Light Co. 05000335 50-.389 St. Lucie Plant, Unit 2, Florida Power &. Light Co. 05000389 AUTH. NAME AUTHOR Florida Power & Light Co.

AFFILIATION'OGERS,J.A.

STALL,J'.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION SUBECT: Monthl o crating repts for May 1999 for St Lucie Unit 1 S

.With 99061 tr.

DISTRIBUTION CODE: IE24D COPXES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD2-2 PD 1 1 GLEAVES,W 1 1 INTERNAL: CRS 1 1 AEOD/SPD/RRAB 1 1 ILE CENTER 01 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC NRC PDR 1 1 D

U

'E i N

NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Florida Powers Light Company,6351 S. Ocean Drive, Jensen Beach, FL34957 June 10, 1999

'IPIL, L-99-133 10 CFR 50.36 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the May 1999 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

I Please contact us should there be any questions regarding this information.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments l

cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant 9906i60259 99053i PDR ADOCK 05000335 R

PDR'n FPL Group company

DOCKET UNIT NAME NO'0 - 335 ST. LUCIE UNIT 1 DATE 06/03/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTlNG PERIOD: MAY 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 3623 155592.5
4. Number of Hours Generator On Line 744 3623 153956.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 633845 3095731 125016269

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie 81 DATE: June 3, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH ~Ma 1999 Unit 1 operated at essentially full power for the entire month of May In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:

UNIT: St. Lucie Nl DATE June 3, 1999 TELEPHONE'0-335 COMPLETED BY: J.A.ROGERS (561) 467-7296 REPORT MONTH Mav 1999 Number Date Type Duration Reason Method of Cause E Corrective 1 (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit I operated at essentially full poorer for the entire month of May.

F Forced Reason Method

- 1 - Manual S Scheduled A

- MaintenanceFailure Equipment (Explain) 2 - Manual Scram B

C - Refueling or Test 3 - Automatic Scram D Regulatory Restriction - Continued E - Operator Training a License Examination 4

5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain)

H Other (Explain) 091587 EPL

DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE ~ 06/03/99 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: MAY 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 3623 118922.7
4. Number of Hours Generator On Line 744 3623 117273.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 633513 3038344 96044188

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: June 3, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH ~Ma 1999 Unit 2 operated at essentially full power for the entire month of May.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie N2 DATE: June 3, 1999 COMPLETED BY J.A.ROGERS TELEPHONE: (561) 467-7o96 REPORT MONTH Mav 1999 Number Date Type Reason Method of Cause & Corrective 1 Duration 2 Shutting Action to (Hours) Down Prevent Recurrence Reactor3 Unit 2 operated at essentially full popover for the entire month of May.

1 3 F Forced Reason Method

- 1 - Manual S Scheduled A

- MaintenanceFailure Equipment (Explain) 2 - Manual Scram B

C - Refueling or Test 3 - Automatic Scram D - Regulatory Restriction 4 Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

- Error (Explain)

G H - Operational Other (Explain) 091989 Epr

~

0 y f'a