ML17241A459

From kanterella
Revision as of 21:22, 29 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr
ML17241A459
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/31/1999
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-99-203, NUDOCS 9909210283
Download: ML17241A459 (13)


Text

CATEGORY REGULA RY INFORMATION DISTRIBUTIO SYSTEM (RIDS)

-y DOCKET ¹ FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 S0-389,St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power & Light Co.

STALL,J.A. Florida Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl o eratin repts for Aug 1999 for St Lucie,Units 1 &

With 990 13 DISTRIBUTION CQDE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per 'Tech Specs)

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL GLEAVES,W 1 1 INTERNAL: ACRS OC/DBA/PAD 1

1 1

1

+ZLE CENTER Ol RES7DAGDF/OERAB~

~ 1 1

1 1

RGN2 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC NRC PDR 1 1 D

)S U

'E NOTE TO ALL "RZDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE LISTS DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF, COPIES REQUIRED: LTTR 9 ENCL 9

i,il ~ ~> ~ r.

t V I~ lr e ~

4'~ l i i s

~,~ p~

Florida Power & Light Company, 6351 S. Ocean Drive; Jensen Beach, FL 34957 September,13, 1999 FPlL.,

L-99-203 10 CFR 50.36 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the August 1999 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St. Lucie Plant 99092i0283 99083k PDR ADOCK 05000335' PDR an FPL Group company

0 ~

J

'I

DOCKET NO 50-335 UNIT NAME ST. LUCIE UNIT 1 DATE Sept.5, 1999 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: AUGUST 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 673.5 5760.5 157730
4. Number of Hours Generator On Line 659.3 5746.3 156080
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 518790 4857767 126778305

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: Sept. 5, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MQIITH Unit 1 operated at essentially full power through August 22. On August 23, the unit was manually tripped due to loss of condenser vacuum resulting from failure of gland steam regulator on ¹2 low pressure turbine. On August 27, the unit was returned to service and power was increased to 73%. At 2055, on August 27, the unit commenced downpowering to'approximately 45% for repair of the 1B main feedwater pump recirculation valve. On August 29, the unit began increasing power. On August 30, the unit returned to full power.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE' ~ Sept. 5, 1999 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: AUGUST 1999

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 5663.6 120963.3
4. Number of Hours Generator On Line 744 5654.7 119305.4
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 632972 4721955 97727799

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: Sept. 5, 1999 COMPLETED BY: S.A.ROGERS TELEPHONE: (561) 467-7296 REPD 7 MONTH Unit 2 operated at essentially full power for the entire month of August.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

l C

C UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie 01 DATE: Sept. 5, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH A~ut 1999 Number Date Duration Reason Typel (Hours) Method of Cause & Corrective Shutting Action to Down Reactor Prevent Recurrence 3

8/23/99 Umt 1 manually tripped due to loss of condenser vacuum A resulting Gom failure of gland steam regulator on /I2 LP turbine.

8/27/99 Umt 1 doivnpowered to approximately 45% for repair of the 1B 0.0 main fecdwater pump recirc. valve.

1 2 3 F Forced Reason Method S Scheduled A - Equipment failure (explain) 1 - Manual B - Maintenance or Test 2 Manual Scram C - Refueling 3 Automatic Scram D - Regulatory restriction 4 - Continued E - Operator Training r License Examination 5 Load Reduction F - Ad&nistrative 9 Other (Explain)

G - Operational Error (Explain)

H - Other (Explain) 091MT F91

\

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie N2 DATE: Sept.5, 1999 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH Adust 1999 Number Date Duration Reason Method of Cause & Corrective Type (Hours) 1 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit 2 operated at essentially full pouzr for the entire month of August.

1 2 F Forced Reason Method A - Equipment 1 - Manual S Scheduled

- MaintenanceFailure (Explain) 2 - Manual Scram B

- Refueling or Test 3 - Automatic Scram C

B E

F G

H

-

- Regulatory Restriction OpeLator Training & License

- Administrative

- Operational Error (Explain)

- Other (Explain)

Examination 4

5 9

Continued

-

- Load Reduction Other (Explain) 0 091599 EPL

V ~ ~ ~