ML17334A605

From kanterella
Revision as of 11:49, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 2
ML17334A605
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1997
From: Minor J
INDIANA MICHIGAN POWER CO.
To:
Shared Package
ML17334A604 List:
References
NUDOCS 9801140266
Download: ML17334A605 (3)


Text

N.R.C. OPERATING DATA REPOR DOCKET NO. 50 - 316 DATE January 6, 1998 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 2
2. Reporting Period Dec-97
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 744.0 8760.0 175320.0
12. No. of Hrs. Reactor Was Critical 0.0 5759.1 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 5705.8 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 0.0 18829383.4 366007650.4
17. Gross Electrical Energy Gen. (MWH) 0.0 6080250.0 118584640.0
18. Net Electrical Energy Gen. (MWH) 0.0 5875213.0 114257779.0
19. Unit Service Factor 0.0 65.1 68.3
20. Unit Availability Factor 0.0 65.1 68.3
21. Unit Capacity Factor (MDC Net) 0.0 63.3 62.2
22. Unit Capacity Factor (DER Net) 0.0 61.5 60.6
23. Unit Forced Outage Rate N/A 16.7 14.3
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION W80<XOOmz 1%0)03 PDR ADQCK 00$ i6 R

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE January 6, 1998 COMPLETED BY JW Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

December 1997 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 12/1/97 0 12/17/97 0 12/2/97 0 12/18/97 0 12/3/97 0 12/19/97 0 12/4/97 0 12/20/97 0 12/5/97 0 12/21/97 0 12/6/97 0 12/22/97 0 12/7/97 0 12/23/97 0 12/8/97 ,,0 12/24/97 0 12/9/97 0 12/25/97 0 12/10/97 0 12/26/97 0 12/11/97 0 12/27/97 0 12/12/97 0 12/28/97 0 12/13/97 0 12/29/97 0 12/14/97 0 12/30/97 0 12/15/97 0 12/31/97 0 12/16/97 0

t'a,

~+I'I 'el:-lg iver" ',

t le8'