ML18138A030

From kanterella
Revision as of 03:50, 21 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Jan 1980
ML18138A030
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/15/1980
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Haller N
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML18138A031 List:
References
120, NUDOCS 8002190757
Download: ML18138A030 (1)


Text

VXRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGIN.IA 23261 February 15, 1980 Mr. N. M. Haller, Director Serial No. 120 Office of Management and PO/RMT:baw Program Analysis Docket Nos. 50-280 U. S. Nuclear Regulatory Commission 50-281 Washington, D. C. 20555 License Nos: DPR-32 DPR-37

Dear Mr. Haller:

Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos.

1 and 2 for the month of January, 1980.

Very truly yours,

z;;, >>1. vJ%u*~r--
__.r C. M. Stallings Vice President-Power Supply and Production Operations Enclosure (3 copies) cc: Mr. Victor Stello, Director (10 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy)

Office of Inspection and Enforcement - Region II