VIRGINIA ELECTRIC AND POWER COMP ANY SURRY POWER STATION MONTELY OPERATING REPORT REPORT NO. 80-01 JANUARY, 1980 APPROVED:

1\)~£~ MANAGER

-i-CONTENTS Section Operating Data Report - Unit #1 Operating Data Report - Unit #1 - Corrected Copy month of December la Opera:ting Data Report - Unit 112 2 Unit Shutdowns and Power Reductions - Unit Ill 3 Unit Shutdowns and Power Reductions - Unit #2 4 Load Reductions Due to Environmental Restrictions - Unit #1 5 Load Reductions Due. to Environmental Restrictions Unit #2 6 Average Daily Unit Power Level - Unit #1 7 Average Daily Unit Power Level - Unit #2 8 Summa~; of Operating Experience 9 ALlendments to Facility License or Technical Specifications l0 Facility Changes Requiring NRC Approval .. 11 Facility Changes That Did Not Require NRC App:coval 12 Tests and Experiments Requiring HRC Approval 14 Tests and Ei"Periment.s That Did .Not Require NRC Approval. 14 Other Changes, Tests and Experiments 15 Chemistry Report 16 Description of All Instances Where Thermal Discharge Limits 17 Were Exceeded Fuel Handling 18 Procedure Revisions That Changed the Operating Mode.Described In The FS.AR 21 Description of Periodic Tests Which Were Not Completed Within The Time Limits Specified In Technical Specifications 22 Inservice Inspection 23 Reportable Occurrences Pertaining to .Any Outage or Power Reductions 26

  • Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit ffl - Mechanical Maintenance 27 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit 112 - Mechanical Maintenance 30

. . -ii-Section Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Electrical Maintenance 33 Maintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #2 - Electrical Maintenance 35 Haintenance of Safety Related Systems During Outage or Reduced Power Periods - Unit #1 - Instrument Maintenance 37 iiaintenance of Safety Related Syst:J;?mS During Outage or Reduced Power Periods - Unit #2 - Instrument Maintenance 39 Health Physics Summary 41

?rocedure Deviations reviewed by Station Nuclear Safety and Operating Committee after Time Limits Specified in T.S.

42

O?ZRhTING DnT;, RZPOIIT DOCKr:T NO. 50~280 DATZ 05 FZB 80 ca~?LZTZD BY O.J. COSTELLO TZLZPHON2 804~357~3184 O?ZR!.'£ING ST.:.TUS

1. UNIT NAMZ SURRY UNIT 1
2. REPORTING PERIOD 10180 TO 13180
3. LIC?NSZD THZ."PJ*!liL- ?O;./?l! (M"1T) 2441 ,----~---------~---~-,
4. N;,MZ?L.:,TZ R..:.TING (GROSS MWZ) 847.5 INOTZS I
  • D25IGN ZL?CTRICi1.L RJ.TING (NET t.ft/2) 822 I I
6. MhXIMUM D'EPZNDnBLZ C/J'nCITY (GROSS MWZ) 811. I I
7. M!iXIMUM DZPZNDnBLZ C;.?J.CITY (NZT MW?) I l
8. IF CHJ.NGZS OCCUR IN CiiPJ.CITY RATINGS (ITZMS 3 .THROUGH 7) SINC2 Lli.ST RZ?ORT. GIVZ RE,1SONS
9. ?OW?R L?VZL TO WHICH RZSTRICT?D, IF ANY N/;,

(NZT lfw2)

10. RZJ,SONS FOR RESTRICTIONS, IF ANY N/;,

THIS MONTH YRwTOnD!iTF CUMULATIV?

11. HOURS IN RZi'ORTING ?lRIOD "744.0 744.0 62328. 0
12. NUMBZR OF HOURS RZACTOR WAS CRITICM 561. 4 561.4 39313.0
13. RZ.:.CTOR RESZRVE SHUTDOWN HOURS 182.6 182.6 3731. 5
14. HOURS GZN'ZRliTOR ON""LINZ 556.1 556.1 38461.1*
15. UNIT RZSERVF SHUTDOWN HOURS 187.9 187.9 3740.5
16. GROSS THERMAL* ENERGY GENERiiTED (MWH) 1337473.0 1331473.e 89052345.0
17. GROSS ZLZCTRICAL ZN'ZRGY GZNZRATED (MWH) 430185.0 430185.0 29110683.0 18
  • NZT 'ZLZCTRIC lJ, ENERGY GENERATZD (MWH) 409019.0 409019.0 29635918. 0
19. UNIT S?HVICE Fh.CTOR 74. 'l o/ o 74.1 oj o 61. g of o
20. UNIT tiV !.ILnBILITY FACTOR 100.0 a/ o 100.0 oJ o 67.7 o) o
21. UNIT C..:.P.:.CITY FACTOR (USING MDC NZT) 70.9 o/o 10.9 oj o 57.2 ojo
22. UNIT CAPACITY FACTOR (USING D?R NZT) 66.9 o/o 66.9 o}o 53.9 o/o 2 3. UNIT FORCZD OUT !JGZ Rr..T? 25.3 ojo 25.3 o/o 24.8 o/ o
24. SHUTDOWNS SCHZDl!Ll:D OVZR NEXT 6 MONTHS REFU"ELING JUNE 1980 6 W'?"ZKS (TYPZ,DATZ.AND DURATION OF Eli.CH)
25. IF SHUT DOWN /if END OF RE?OICI' PE:RIOD.

ZSTIM.:,TZ D//lZ OF ST ;,RTl!?

26. UNITS IN T'ZST STli.Tl.'S FORECAST ACHI'ZVZD (PRIOR TO COMM?RCIAL OPERATION)

INITIAL CRITICALITY INITIAL ZLECTP..ICITY COMMZRCIAL OPZR!iTION

OPERATING DATA RZPOJ?! CORRECTED COPY DOCKZT NO. 50 .. 280 D/JT2 05 FZB 80 COMPLZT2D BY O.J. COSTELLO TZLZ?HONZ 804~357~3184 O?ZR.:{fING ST ,ITUS

1. UNIT N).MZ SURRY UNIT 1
2. RZPOR'IING ?ZRIOD 120179 TO 123179
3. LICZNSZD THZRMAL POW-CR (MWT) 2441 1------------------------,
4. NANZ?LATZ RATING (GROSS !1'"12) 84~.5 !NOTES I
5. DZSIGN ZLZCTRIC AL RATING (NET Kw2) 822 I I
6. MAXIMUM DEPENDABLZ CAPACITY (GROSS M"rlZ) 811 I I
7. MAXIMUM D'ZPZNDABLZ CAPACITY (NET MWZ) 775 I I
8. IF CHANGZS OCCUR IN CAPACITY RATINGS NIA (ITEMS 3 THROUGH 7) SINC'Z LAST RZ?ORX, GIV2 RZASONS
9. POWZR LEVZL TO WHICH RZSTRICTZD, IF ANY N/A CNZT !>filZ)
10. RZJiSONS FOR RZSTRICTIONS, IF ANY N)A THIS MONTH YR-::TOnDATZ Cl/MULATIVZ
11. HOURS IN RZ?OR'IING PERIOD 7414.0 8760.0 61584.0
12. NUMBZR OF HOURS REACTOR WAS CRITICAL 446.0 3051.7 38751. 6
13. RZACTOR RZSZRVZ SHUTDOWN HOURS 48.0 3548.9 3548.9
14. HOURS GENGE.ATOR ON,,LINZ 446.0 3046.1 37905. 0
15. UNIT RESZRVZ SHUTDOWN HOURS 48.0 3552.6 3552.6
16. GROSS THZBJ.1AL ZNZRGY GENERATZD (MWH) 1088483.0 7358919.0 87714872. 0
17. GROSS ZLZCTRICAL ZNZRGY GZNZRATZD (MWH) 352695~0 2372915.e 28680498.0
18. NET ZLZCTRIC AL ZNZRGY GZNERATZD (MWH) 335501.D 2255180.0 2:]226899.0
19. UNIT SZFf!ICZ FACTOR 59.9 o/o 34.8 ojo 61.6 ojo
20. UNIT AVAILABILITY FACTOR 66.4 ojo 78.2 ojo 67.7 ojo
21. UNIT CAPACITY FACTOR (USING MDC NET) 58.2 o/o 33.2 o/o 57.0 o}o
22. UNIT CAPACITY FACTOR (USING DER NZT) 54.9 o/o 31.3 ojo 53.8 o}o
23. UNIT PORCZD OUTAGE RATZ 40.1 ojo 65.2 ojo 24.8 ojo
24. SHUTDOWNS SCHEDULZD OV'ER NEX.T 6 MONTHS REFUELING JUNE 1, 1980, 6 WZEKS (TYPE.DATZ.AND DURATION OF ZACH)
25. IF SHl!T DOWN AT ZND OF RZPORT ?ZRIOD, N/.4.

2STIM.-ITZ DAT? OF ST ARXU?

26. UNITS IN TZST ST ..fI'US FORECAST ACHI?VZD (PRIOR. TO COMMERC.:E OPER.4TION)

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

Oi'ZRATING DtiTA RZ?ORT DOCKZT NO. so .. 2s1 DtiTZ 05 F?B 80 COMPLZTZD BY 0 .J. COSTELLO TZLZ?HON? 804"357"3184 OPZRtiTING STA'IUS

1. UN IT NJ,N.E SURRY UNIT 2
2. RZ?ORTING ?"GRIOD 10180 TO 13180
v. LICENS"GD TEERMXL ?OWER (M't!T) 2441 ,--------~-------~-~---,
4. NJ,NZ?LAT2 R;.TING (GROSS MWZ) 847.5 INOTZS I

=. D2SIGN ZLZCTRICXL RATING (NZT M't!Z) 822 I I

6. MAXIMUM DZ?ZNDJ,BLZ C:.-?!.CITY (GROSS MWZ) 811 I I
1. MAXIMUM DE?ZNDJ,BLZ C!ti'ACITY (NZT MWZ) 775 I I
8. IF CEJ,NGZS OCCUR IN C/J'ACITY R.:.TINGS N/;,

(IT?MS 3 THROUGH 7) SINC-2 L:.ST RZ?ORT, GIVZ RZ/.SONS

9. i'Q-,./ZR I.ZV2L TO WHICH RZSTRICTZD, IF :.NY N/;,

(NZT g,,;z)

10. RZ.:.SONS FOR RESTRICTIONS. IF J,NY THIS MONTH YR~TO!!D/lfZ CU!*fULA'IIV?
11. HOURS IN RZ?QRTING
  • P?P.IOD '.744.0 744. 0 59208.0
12. NU!t5ZR OF HOURS R?J,.CTOR w;,s CRITIC/.L 0.0 0.0 34499.9
13. RZACTOR RZSZHVZ SHUTDOWN HOURS 0.0 o.o o.o
14. HOUF.E GZNZR/...TOR QN,.UNZ o.o o.o 33996. 2
15. l'NIT RESZHVZ SHUTDOWN HOURS 0.0 o.o o.o
16. GROSS THZRMXL ZNERGY GZNZRAT2D (MWH) o.o 0.0 19194083. e
17. GROSS ZLZCTRIC /,L ENERGY GZNZRATFD CWH) El. 0 o.o 25868844.e
18. NZT 'ZL?CTRICXL ZNZRGY GEN?RATZD (MWH) o.o o.o 24536605.0
19. UNIT S?HVICZ F/iCTOR o.o o.o 57.4 o/o
20. UNIT :.V/iILliBILITY FACTOR 0.0 'O. 0 57.4 ojo
21. l'NIT Ctii'..1.CITY F.:.CTOR (USING MDC NZT) o.o o.o 53.S o/o 2'1 UNIT CA?/iCITY F.:.CTOR ([!SING DZR NCI) o.o o.o 50.4 o/o
23. UNIT FORCED OUT/iG2 RATZ o.o o.o 21. 0 a/ o 21+. SHUTDOWNS SCHEDULZD OVZR NZXT 6 MONTHS (TYP?,D/iTZ,:.ND DURATION OF ?/iCH) 25' IF SHUT vo;.;v .:.I' ?ND OF RZ?ORI' ??FU.OD. 5/5/80
26. UNITS IN TZST ST/.':fUS FORZC.:.ST /i.CHIZVZD

(?RIOR TO COMMZRCI..1.L O?ZR/aION)

INITIAL CRITIC/iLITY IHITI..1.L ELECTRICITY COMMZRCI.:.L O?ER *.:.TION

"I I.

50-280 DOCKET NO.

UNIT SllUTPOWNS ANO 11 0\llEJl llEJlUt"llONS SURRY 1 UNITNAt.11!

l>AlE 2/1/80 CO~IPl.ETEll UY O. J. COSTELLO nEronr Motf111 JANUARY 1980 lEl.l'.l llONE (804)_ 35_7-3184

'"t E

.. =-- rl.

'-a ~I) H Uccnsco Hvu u"l Came & C1111cd Ive j l~

Nu. Oa1i:

~ . .:! l1

... :i 1 *:: l!vcnl ~*g Ai:1l1111 111

~ GJ. -5 !i ~ Ji*u lltp*.itt Ii l'fCllClll (lci:llflCllCC

~!

l-Cl..; u 80-1 l-'l-80 ,, F 183.6 .. D 4 Unit down for: replacement of RCJ.1 motor.

NRC requirement to successfully test RCP snubber prior to startup.

80-2 1-8-80 F 2.5 G 3 Reactor trip caused by lo-lo _level in "A' Steam Generator feeding S/G's in manual.

80-3 1-8-80 F 1.. 8 G 3 Reactor trip caused by high level i~ "A" S/G while feeding S/G's in manual.

F: F111atl ltciu1111: Mclht11I: U11hlhl1 0

  • lnu 1111:1 h1111 S: Sd1tJulcd A.f:1p1lpmcnl Failure ( l!xplaln) I *Manual for l'*l't*a1a1l1111 or f)a1:1 .

IJ-Mal11lcna11cc oi TcJI 2-Manilill Scram. l:i111y Shci:ls for l.kc1ucc C-ltcfucllng J-A11l11111allc Scram. l'.vc11l ltc1w1I (I.Ell) Fiie (NUllEG-

. l).llci;11la1111y ltca11lc:ll1111 *l*Olhct (L!x11li1l11) Ol(il' **

t: *Opcrn 111r Ti al11l11u & Llc:i:n SI.I Examhrnll.!111 F*J\1l111l11lu1a1l*1c . s E~hlhl1 I *Sam~ S111111.:.:

li-Opi:rall1111al b111r (Expfolul

('1/r/) II l)lhur ( 1:xpl;1la1)

UOCICET NO . . S0- 2-~----**--*--

UNIT SllU"IDOWNS AND POWErt IWflUCllONS UNir r:>~~:-:~ _~n7~~:~I*-~ ~~

Cot.IPLETl:ll HY .:..Jl~....__cJ).STELJi.0_

nnorrr ironm JANUARY 1980 ll!l.U llONE ____{_§.Q_~)-.--_]_-?_~:-}!~.~-

"t.

.t:..

r; - rl. 0 ~!* ti Ui:1:111ca ~~ "v fi .g Ci111u: & C1111 ti:l lvi:

.~ 1 .;;

'-111.

II p..

I-

-*,.'1 Ci*x 11

J 3

j -ti ti~ F

!i ~

[I

.i:

Even I ltcpoll II

"' 0 Ji*u

.... *CJ g*

  • 1u u

b At:1l1111 Ill l 1rcvc111 llci:1u1c111.:c

...: 8

~

80-1 1-1-80 s 7l14 c 1 Continuation of shutdown for r efueling

> and steam generator replacemen t. which began on 2/4/79.

1 J

Me1h111I: l!xhlldl Cl* !11111111:1111111

--~J r: r.q, *"

  • lt1:*1rn11:

l-~ta1111al fo1 1'1q*Jfitll1111 11f !>ala

.*:: ~~ ( I::.; !I!.: d A-Eq11lp111c11I bll111c (Explalu) 2-~lanual .Scrnm. E1111y ~heels fllf l.kr111rc ll-Mal111l:l1.i111:c l>i Tc.st J-A11111111allc Sc:r;i111. l'.vc11l llcp111f (l.l:ll) File (HllllUi*

C-1lc:f111;I i1 1 i

'I-Other (l.!xplal11) 0 I (i I)

. D*Hq;11L111111' llc)1il1:ll1111 E-(lpi:1a1111 T1:d11l11u & Lkc11so Exi1111l11;1ll1111 F-Ad 11il 11i~ 11ii11*11:

1;.1l1*1:1alln11:1I L.1111 (bpbl11)

('I/ 11) . 11 lllhc1 ( l'..-:pLtl11)

_J

LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO.l MONTH: JANUARY, 1980 DATE ITIME I HOURS I LOAD 2 MW I REDUCTIONS 2 MW I -MWH I REASON None d llring this reportir g period.

I I I I

II I

I I I I I

I I l II I i i i I I I I I I I  ! I Ii i

I !I I

I II i' I I!

I I

I I

i I I I MONTHLY TOTAL

LOAD REDUCTIONS DUE TO ENVIRONMENTAL RESTRICTIONS UNIT NO. 2 MONTH: JANUARY, 1980 DATE TIME HOURS LOAD 2 MW I REDUCTIONS 2 MW

-MWH REASON I

None durir ~ this reporting pariod.

I I

I I

I -

I I

i II I

II

!i I

I I

MONTHLY TOTAL

DOCKZT NO e

so .. 2ao UNIT SURRY I D/iIZ 2.. 1,,ao COMPLZTED BY 0 J COSTZLLO MONTH: JANUARY 80 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LFTIEL DAY CMWZ"NET) DAY (MWZ"NFT) 1 o.o 17 747.5 2 o.o 18 ~47.3 3 i'J. t) 19 748.3 4 o.o 20 748.6 5 o.o 21 748.9 6 o.o 22 751. 3 1 0.0 23 750.8 8 39.8 24 746.9 9 616. 2 25 747.9 10 726. 5 26 949.3 11 689.8 27 149.8 12 ¥47.5 28 1so.6 13 74:J.O 29 749.3 14 i45.7 30 747.4 15 74v.9 31 750.1 16 747.9 DAILY UNIT rowzR LEVEL FORM INSTRUCTIONS ON THIS FORM. LIST THZ ..lVZ:RAGE DAILY UNIT POW2R L?V2L IN l.fwE~NET FOR FACH DAY IN THE RZPOF.PING MONTH. THZS'E FIGURZS WILL B? U52D TO PLOT A GRAPH FOR ZACH RZPORII!'

ING MONTH. NOTZ THAT BY USING MAXIMUM DZPENDABLE CAPACITY FOR THE NET ELECTRICAL RATING OF Tli.2 UNIT. THERE MAY BZ occ.:..5IONS WH?N ':H? DAII./l .~??RAGE PO~llR ZXC?2DS THE 100 °/ 0 LINE (OR THZ: RZ5TRIC:'?[, ?o.~rcR LZ-VlL LT.7?). Ik 5: 1(;,7 CA2S, TH? .~V2'RAG?

DAILY UNIT POW?R OUTPUT SEZ?T Si::Ji.'LD 5? FO(!J',\i(X:?:. ~) ?XPLXiJ' -:'2? APPAR?l?:' A?i10N).LY.

  • DOCKET NO 50"281 UNIT SURRY II DATZ 2":"1u80 COMPLETED BY 0 J COSTELLO MONTH: J,WUARY 80 AVERAGE' DAILY POWER LZVEL AVERAGE DAILY POWER LZT/EL DAY (MWEr:NET) DAY (MWEwNZT) 1 o.o 17 o.o 2 o.o 18 o.o 3 o.o 19 o.e 4 o.o 20 a.a 5 o.o 21 0. (j 6 o.o 22 o.e 7 o.o 23 o.o 8 o.o 24 o.o 9 o.o 25 o.o 10 a.a 26 o.o 11 o.o 29 o.o 12 o.e 28 o.a 13 o.o 29 o.o 14 o.o 30 o.o 15 0. t1 31 O.Q 16 o.o DAILY UNIT POWER L'i:VZL FORM INSTRUCTIONS ON THIS FORN, LIST THZ AVERAGE DAILY UNIT POWER LEVEL IN MWEwN'ET FOR EACH DAY IN THE REPORTING MONTH. TBBSE FIGURZS WILL BE USED TO PLOT A GRAPH FOR EACH REPOI?b ING MONTH. NOTE THAT BY USING MAXIMUM D2ff:ND/i.BLZ CAPACITY FOR TH? NET ELECTRICAL R:CING OF TiiZ UNIT. THZRE MAY BE OCCASIONS ~rHEN THE DAILY AVERAG? POWER ZXC??DS TH? 100 °/ LINZ (OR THE RFSTRICT?f.POW?R L2V?L LIN?). IN SUCH CASFS, TH? AV?FtiG?

0

~*-~~Li" ['!;~IT POf-l?F.. Ql.'TPl'T SHF'E:T ~::-;.::-*~r:u Bl :aoTt.:o-:r?D TO 'EXPLAill THE APPAR2~1T AN011.-4L1~.

t!*n*y Su*~.l.tU\.

OF OPERATING EXPERIENCE e

.... JA.i.'ITJARY, 1980 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in sign-ificant non-load related incidents.

UNIT 1 January 1, This reporting period begins with the unit at Cold Shutdown awaiting results of RCP snubber testing.

January 7, Commenced reactor coolant system (RCS) heatup from 200°F to 350°F/

450 PSIG at 0835. RCS at 350°F/450 PSIG at 1915 and heat up continuing.

January 8, Commenced reactor startup at 1255. The reactor was critical at 1307. The generator was synchronized to the system at 1537 the reactor tripped from approximately 11% power due to "A" S/G Lo-Lo Level while feeding S/G's in manual. The reactor was critical at 1631. The generator was synchronized to the system at 1813. At 1840 the reactor tr.ipped from approximately 18% power due to "A" S/G .High Level. The reactor was critical at 1924. The generator was synchronized to the system at 2025. Power was increased to 50% and power increase stopped at 2200 until S/G chemistry improved.

January 9, A power increase from 50% to 75% began at'0215 and 75% power was achieved at 0415. At 0617 commenced power increase to 90%.

-Achieved 90% reactor*power at 0755. At 0924 commenced power increase--to 93%~eved*-~r5% power at 0945. At 2139*1n.ct"~asea-power to 97%. At 2202 reduced reactor power from 97% to 95% due to condenser. vacuum problem.

January 10, - At 0015 increased reactor power to 97%. At 2000 increased reactor power to 100%.

January 31, - This reporting period ends with the unit at 100% power.

UNIT 2 January 1, This reporting period begins with the unit at cold shutdown, all fuel removed from the reactor and steam generator replacement in progress.

January The primary side hydrostatic test 2A Steam Generator was completed.

This completes all primary and secondary side hydrostatic tests of the replacement steam generators.

January 31, - This reporting period ends with the unit at cold shutdown.

... e AMENDMENTS TO lrcrLITY LICENSE OR TECHNICAL SPECIFICATIOUS JANUARY, 1980 The Nuclear Regulatory Commission has issued an Order for Surry Power Station Unit No. 1. The Order is issued to require implementation of all "Category A" lessons learned requirements prior to plant operation after January 31, 1980. Of significance the.Order requires the following:

The Licensee by January 31, 1980, implement all 1"Category A" requirements (except the requirement of 2.1. 7 .a. of NUREG-0578) referred to in Part 11 of this Order, except those for which necessary equipment is previously shown, by appropriate documentary justification to the Director, Office of NRR, to be unavailable, or, in the alternative, place and maintain its facility in a cold shutdown or refueling mode of operation. "Category A" -requirements not implemented by January 31, 1980, owing to the unavailability of necessary equipment shall be implemented within 30 days of the date such equipment becomes available but no later than June 1, 1980.

e FAGILITY CHANGES REQUIRDiG NRC APPROVAL JANUARY, 1980 None during this reporting period.

FACILITY C".dANGES TH..-'U' DID NOT REQUIRE NRC APPROVAL JANUARY, 1980 Design Changes Unit

1. DC-79-847 Welding of Containment Dome Plug 2 The top of the containment dome at Surry has a 30" diameter penetration which was used during construction. This penetration is sealed by a bolted flange with "O" rings on the liner side, a bolted plate on the outer end and is filled with sandbags.

It is necessary to weld the liner.flange of this dome plug to insure no leakage during the ILRT and to eliminate future testing of the "O" ring seals.

Summary of Safety EValuation The containment integrity will not be affect;ed. There are no safety implications created by this design change.

2. DC-79-S53 Emergency Motive P,ower to PORV's Modif1cation 1 The pressurizer PORV's PCV-1455C and 1456 motive power is presently supplied by the nonsafety-grade containment instrument air system. In order to comply w.ith NUREG-0578, the connection to an existing safety-grade system is required.

The pressurizer PORV's will receive their additional safety-grade motive power from the existing reactor vessel over pressure protection supply system as follows:

A spring-loaded check valve which was installeC: ::c;;:

Design Change 77-08 to prevent back flow of the safety-grade air to the nonsafety portion of the containment instrument air system will be removed. A new spring-loaded check will be installed in the instrument air line upstream of the safety-grade air line tee connection and PORV solenoid valves. This allows safety-grade air.

to be available for operation of the PORV's if containment instrument air is lost while still preventing a back flow of safety-grade air to the nonsafety portions of the system.

The safety-related portions of the syste."!l are seisrr..ically supported.

FACILITY CHA..~GES THAT DID NOT REOUIRE NRC APPROVAL (CONTINUED)

Summary of Safety Evaluation The safety function of the portion of the containment instrument air system being modfied is to provide a back-up motive force to operate the pressurizer PORV's. This modification will make available an additional air supply in the event the normal air supply is disrupted; the basic operation of the system is unchanged. Since the work is equal to the original design requirements for containment instrument air, the modification will have no adverse effect on the operation of safety-related equipment.

3. DC-79-854 Direct Indication of Pressurizer Safety Valve 1 Position The proposed resolution is to moitor the flow in safety valves, SV1551A, B, and C, and SV2551A, B, and C, using an acoustic monitoring system.

Two acoustic sensors will also be secured to the surface of each power-operated relief valve, PCV1455C and 1456 and PCV2455C and 2456 to provide another means of indicating power-operated relief valve position besides the use of limit switches currently mounted on these valves.

Summary of Safety Evaluation Installation of the above-mentioned acoustical monitoring system for pressurizer safety/power-operated relief valves position in-dication and the pressurizer power-operated relif valve position alarming function do not create an "unreviewed safety question",

as defined in 10CFR50.59. This modification will increase the system reliability.

4. DC 79-SSS Auxiliary Feedwater System-Flow Indication 1 Modification The flow indication instrumentation to the auxiliary feedwater system is presently powered from a semivital bus. NUREG-0578 requires that this system meet all safety-grade requirements; including emergency-powered diversity. This will be accomplished by:

A. Detaching and tagging the existing wires terminating at the three-loop power supply rack MB-6.

B. Removing the existing three loop power supply from the semivital rack and installing it into process rack 6 powered from vital bus 1-I.

C. Installation of two three-loop power supplies into process rack 5 and 23 powered from vital bus 1-II and 1-III, respectively.

I

  • FACILITY CHANGES THAT DID NOT REQUIRE NRC APPROVAL (CONTINUED)

I D. Auxiliary feedwater flow instrument cables being rerouted and terminated in appropriate racks being electrically and physically isolated in accordance with NUS-357 and meeting all safety requirements including power diversity in accordance with ASBTP 10-1.

Summary of Safety Evaluation The auxiliary feedwater flow inidication modification does not effect station operation nor does it alter the operation of safety related equipment.

I _ 14 _

T

  • STS AND EXPERilfENTS REQUIRING e

NRC APPROVAL JANUARY, 1980 None during this repor~ing period.

TEST AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL JANUARY, 1980 Unit ST-35 1 Inside Recirculation Spray Pump Test was conducted on 01-09-80 on Unit No. 1. The intent of this .best is to provide data that will be used to update the acceptance criteria for the periodic test of the inside Recirculation Spray Pump. (PT-17.2)

- 15 OTHER CHANGES, TESTS .AND EXPERIMENTS*

JANUARY, 1980 None during this reporting period. *

~

e '

- SURRY POWER STATION e

CHEMIS.I'RY REPORT JANUARY 1930 T..S.6.6.A.ll PRIMARY COOLANT UNIT NO. l UNIT NO. 2 ANALYSIS MAXIMOM MINIMUM *AVERAGE MAXIMUM. MINIMUM AVERAGE Gross Radioact., µCi/ml*. 3.84E-l 4.83E-3 2.26E-l 2.46E-4 4. 21E-5. 8.38E-5 Suspended Solids, ppm 1 i. 3 o.o *0.2 0.1 0.1 0.1 I

Gross Tri.tium, uCi/ml l.13E-l I 4. 70E-2' 6.34E-2 - - -

Iodine-131, µCi/ml l.74E-2 3.07E-3 7.17E,-3 - - -

I-131/I-133 0.4717 0.2108 0.3250 - - - -

I Hydrogen, cc/kg j 55. 93 8.0 28.7 - - .;..

I Lithium, ppm 0.99 0.14 0.. 75- - -- - I

.BoroD.-10, ppm + 270.3 45.1 103.5 80.2 I 54. 9 73.3 Oxygen..-16, ppm L4 . 0.000 0.213 10.1 6.4 8.2 Chloride, -ppm Io.13 I

0.05 0.05 '0.05 0.05 0.05 pH @ 25°C 17 .14 5.14 6.52 5.90 5.30 5.41 I

+ .Boron-10 = Total Boron x 0 .196 NON-RADIOACTIVE CHEMICAL RELEASES; POUNDS T.S. 4.13.A ..8 Phosphate 0 Boron 287 Sulf:::t:e 1946 Chromate __ . 08 _____________

50% NaOH 2450 Chlorine __ 0_______________

Remarks: Uu.it 2 Shutdown - Letdown secured 01-13-80, no sampling possible after this date.

Unit 1 Startup 01-09-80.

DESCRIPTION OF ALL INSTANCES WHERE THERMAL DISCHARGE LiliITS WERE EXCEEDED J.Ai.'WARY, 1980 Due to impairment of the circulating water system on the following days the thermal discharge limits were exceeded as noted.

January 9, 1980

  • Exceeded 15°F 6T across station January 10, 1980
  • Exceeded 17 .5°F 6T across station January 11, 1980
  • Exceeded 15°F 6T across station January 12, 1980 ** Exceeded 17.5°F !iT across station January 15, 1980 Exc.eeded 17.S°F !iT across station January 16, 1980
  • Exceeded 17 .S°F 6T across station January 18, 1980
  • Exceeded 17. S°F 6T across station January 19, 1980
  • Exceeded 17.S°F 6T across station January 23, 1980
  • Exceeded 1S°F 6T across station January 24, 1980
  • Exceeded 1S°F 6T across station January 25, 1980
  • Exceeded 17.S°F 6T across station January 26, 1980
  • Exceeded 1S°F 6T across station
  • Indicates dates where station 6T was <1S.0°F across the station for some-time during th.e day.

The 6T excursions were allowable under Technical Specifications 4.14.B.2.

There were no reported instances of significant adverse environmental impact.

On January 8, 1980, the temperature change at the station discharge .

. exceeded 3°F per hour, during Unit 1 star.tup with restrictec,i flow through the condenser. This event was reported in accordance with Technical Specifications 4.14.

  • FUEL HAlIDLIHG JANUARY, 1980 Twelve new assemblies for Unit 1, Cycle 6 were received January 31, 1980.

.. .. *UNIT 1 FUEL HANDLING T t. 11TTT!. 1'V i nqn DATE I

NO OF* ANSI NO. NEw OR* SPENT FUEL SHIPPED/RECEIVED ASSD1:BLIES PER SHIPMENT INITIAL ENRICHMENT SHIPPING CASK ACTIVITY LEVEL Ol-31-80 12 LM08LV/3.2% 2.SmR/hr.

L.'M08LS/3. 2%. 2.SmR/hr ..

LM08LU/3*. 2% 2. SmR/hr.

LM08LT/3.2% 2.SmR/hr.

LM08M4/3.2% I 2. SmR/hr.

LM08LM/ 3 . 2% 2. SmR/hr.

LM08LL/3.2% 2.SmR/hr.

LM08LP/3.2% I 2.5m.R/hr.

I LM08LX/3.2% I. 2.SmR/hr.

LM08M0/3.2% 2. SmR/hr.

LM08LY/3 .2% 2.SmR/hr.

I LMOSLZ/3.2% 2. SmR/hr.

I I

I I

J

. I I

I I I I i I

_. ____].I_ ____...._,._

__ J_ I I

UNIT 2 FUEL KANDLING

.. JANUARY- 19~n DATE NO OF ANSI NO. NEW_ OB. SPENT FU.EL SHIPPED/RECEIVED ASSEMBLIES PER SHIPMENT INITIAL ENRICRMENT SHIPPING CASK ACTIVITY LEVE1 I

I None dur

  • rn: t h'is reporting perio . d .

I -

I I

I I

I l I i

I I I ------ -

I I

I I I

I I I I I

I I

I

___ __)

I -

f"UAUGED THE PROC

  • URE REVISIONS THAT ~.u.:u*

OPERATING MODE DESCRIBED IN THE FSAR e

JANUARY, 1980 None during this reporting period.

I '

  • - 22 DESCRIPTION OF PERIODIC TESTS WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS JANUARY, "1980 None during this reporting period.
  • INSERVICE INSPECTION .

January 1980 The. monthly visual inspection required by IE Bulletin 79-17 (Pipe cracks in Stagnant Borated Water Systems) was completed on Unit 1.

No reportable indications have been noted.

The ultrasonic inspection required by IE Bulletin 79-17 Revision I commenced on Units l and 2. No reportable indications have been noted at this time.

Liquid penetrant testing was comp I eted on the 411 PORV Pressurizer Safe end weld (Unit 2) per Westinghouse recommendation. The Unit 1 weld will be inspected during the refueling outage.

Visual inspections on the Unit I hangar modifications is in progress.

--*-*-~---

l*f:i'/'=NUI' lj E'i'.8 eo .. 2:09 I'M PAG? 5 l'NITh 2/011)00 (MJIIN:rE'N1INCE OF S1IFETY Rr:I.,ITi::V SYSTEllS DI/RING (Jl!TAG?: OR Ri'Wl'CFD I'OllF.r.' T'iRTODS)

Ui.7'SEliVV1' SYS COMP MMIKNO l{l</'F.RF /I NII 1'01'lUNTM 01/02/UO HD INSi'FCt i'RF.SS NOZZiE Pr S1ITI Sf'AC.TORY i lioio209si 5 O?i'r 1'0'1'.*lf; I)

N

.i:-

vin==NDl' 11 FF.8 00 " 2: 19 Hf l'ilGF 5 UNIT2" 2/011/80 (MAINTENANCE OF SAFETY RELATED SYSTEMS D/IRING OU.TAGi': OR RF.Df!CED T'OWi':R rt:RIODS)

RC.TScliVDI' SYS COMP M1IRKNO WKT'f.RF u MR TOTDWNW oi)iJ11J110 RC f>tI'iNa 2 odiil2i195il N

Vl

,...\

,_)

i l

~

~)

~

  • ~

REPORTABLE OCCURRENCES PERTAINING TO ANY OUTAGE OR POWER REDUCTIONS JANUARY, 1980 None during this reporting period.

... 27 -

Maintenance of Safety Related Systems During Outage or Reduced Power Periods

/,,.--*

UNIT tJl Mechanical Maintenance

/JEl"l.'=l*FOI IJ Ft:D 80

  • 2:09 l'M p,1cr: 1 l'NITh 'l)OIJ/80 (NMNl'i'.'iVANCE OF Stlf't:Tr RFLATW SYSTEMS D/IRING 01./T,IGE OR RF.V/ICF.D rowrn i'Fr/IODS) llETS?/,V /JI' SYS COMP M11RKNO SllMl11IRI WKT't:RE' /I MR TOT/JWNTM Oi/lii/llU !IS PIN NG TVnMSuiOlt? E'LANGF.: iE1lk m:rtAcE:D DAD tl"INGR WI7'11 Ni'ti ONE 1 910310700 2~1 01)01/.llO MS l'Il'ING TV ..MSn101tl FL1INGF. LF.1IK R?l'LACt:V 81ID Fl,1INGF Wl.TH Nt:W ONE 1 910310702 257 01/01/110 F'l' l'Il'ING 12 .. Fl' DC '19*53'1A INSTALL CONS7'RAINT CF2~11 INSTAL[, CONSTR11TNT 1 912171051 337 01)02/00 cc PIPING ti~CCn61/66 DC 79 .. S32,I INSTALL CONSTRAINT INSTALtF.D CONSTRAINT 1 911301321 6'19 01/02/UO (,'(,' PIPING 8*CCw11Jll DIC 79~S32A INST1lr.L CONSTRAINT INST1ILL CONSTR,UNT 1 912131111J1 125 01/.0:l/OO cc Pil'ING 1e.cc.*1 DC19nS32A INSTALL CONSTR11IN1' NSC61liw INSTAL[,ED CONS7'R,UNT 1 912191319 1116 01/03/0!) cc l'Il'ING t"cc .. 301 D)C ,!l~S32:1 INSTAl,L CONSTRAINT RFMOVED UwBOLT 1 001030929 2 01/03/AI' cc PIPING 8*CCn32 DIC ?9 ..S32A INSTALf. CONSTRAINT INSTALLFD CONSTRAINT 1 91120131J6 873 1 912171033  ?.12 e

01/0J/(Jil IX Pll'ING 19,cc~10111 DC 79"S32A INSTAf.L CONSTRAIN1' AZ16/JQ INSTALL CONSTRtlINT t11,1011/ou cc PIPING 10,cc.61 rx: 79~S32tl INST ;IL[, CONSTRAINT INST1ILf, CONSTRAINT 1 001021543 30 011011/00 1:c PIPING 2.cc~Gs V!C '19*S32A INST1ILr. CONSTRAINT REMOVED CONS1'RtlINT 1 001030927 30 01)011/eu cc l'IPING 12.cc~33 DIC '19.S32A INSTALL CONSTRAINT INST ALLFD CONSTR ,IJ N'!' 1 001030931 30 01,1011}00 li'C V..ILVF: ft'Vd4St> $r:.i7' iEAIUGi RF.WORKED VALVE i !ii 2011ioio isci Ul)O'l/llU IJS 01.'HF.R NO 1 CONT11lNMi:NT H1ITCH REl',IIRW VLV 1 912132315 12 I 1 912132316 12 01)011/uo BS OTllE/l NO 1 CONTAINMFNT HA1'CH GREASE BEARING 011011/1.10 I'll BASEI'LAT i1Gilv20 tilSTAit PLATE f.IASTJERS REi'LACE imoir. i1G11. 20 i 9i2i~1qoi IJS 011011/1.1<) r*n B.ISi:i'LtlT HGR-1'1 INSTALL PLATE W1IS/l6RS INSTALf. Pf,ATE WASHERS 1 91211J11J02 IJ5 N NF.II PLATE 1 91211J1qo3 50 co 01)0 11/110 i'TI 81ISEI'LAT HGRr15 HGRde INSTtlLL l'L1ITE f{ASHERS oi)u11J~u l'R iitistN,,iT iian~2.a.11 INST,iii i'LATE iiAsiJikS iNS'l'Aii i.i,isiiERS i 9i2iid405 53 01)011/30 l'R ST'RG //GR HGR,;49d5 TORQUE BOL2'S 1'0 PROPER VALVES TORO/IE BOLTS 1 9121111400 53 01/Ulf)llO i'fa' 81ISEl'LAT IJGRa15 HGR~15 REGROUT BASEPLATE NF.II GRO/IT 1ILREADI T'/IT IN 1 91211111115 50 01/.04/UIJ cc PIPING iilaCl'*61 DC 79.s32,t JNSTAtt CONSTRAtN'i' Nsc ~6 INSTAiL.CONSTRtiINT i 9!2200026 i69 01)011/UO cc PIPING hCC.100n151 PINE WTJOLE WELD LB11K RcSOLDt:RIW FL1INGE 1 9122915115 111 01/05/0IJ cu MOV MOV*CH~12151I P,ICY.ING LEtlK ST.'16 CLEAN*TIG//TlN PACK 1 912171520 19 Ct.EAN~*v + TIGllENF.V BONNETtP,ICX I . 91211152~ 19 uiJiJSJno Cl/ MOV Mov.c11"t26*1t1 l'tlCl<I'NG Lt11k st;~li Ul!OS}OO Cl/ MOV MOV*Cllr12'158 PACKING Li':AK ST.16 CLBANF.D i TIGHTFN 1'1ICK 1 912171528 19 01)05/00 (.'/{ MOV Mov~c11.1:nsc P,IC:KING LEtlK STa16 CLF.AN + TIG/JTEN PACK 1 912191532 19 OjJ05)00 Cl/ VALVE rev .cu.11115 PACKING LEAK sr;,1s CLEAN t TIG//TEN i'ACK 1 !1121715*12 19 01/0SIOO RC NOV Mov~11c.1'/oo P,ICKING LEAK Rcl',ICKED VALVE 1 9122301111 187 OllUS/.OO Cf,' PII~ING 1nC/lr57~152 l!NPLf!G LINE RBBllILT. Vt!LVF. 1 912281115 121 1 912302206 :JD 01/05~00 u: Dif.SEL 1*t:E*DG*3 RE/',IIR LEAK INSTALLED Nt:W ROSES DIESEL NO 1 ADD L/IBE OiL TO DIESEL PMP ADDED TWO DRllMS OF OIL 1 001061107 6 01,,ioGAoo EE t .. EE*VGr.:l Rcl'tlIRt:D 1 912302205 151!

01/.06/00 t:r. ftllSC NO 3 WG NOISY I 1 0010110800 12.

01/0'/)00 VS IYJNl' 1nVS*P* 1.' 'IP!'ACKP//Ml' INSTALL MECl/1INICAL SFAf, V1ILV6 1nCCr151 hCC*152 WILL NOT Se1IT I'ROI'F.RLf OI'r:NED VALVE FOi/ND VALVES Srt/CK OI'f.N 1 001050700 5 01)07/0U cc Vtlf,VF. hcc.5a c11zcK VtlLVF INSI'FCTF.D V1ILVE 1 00106121JO 23 01/07/011 cc 01/0'l/llO Ftl MOV Mov.m~1s11* M07'0R 110/ISING SIJATTERF.D REPT,ACED WIT// LIMTORQllF- FROM MOV 251 1 001061910 11 ADD OIL TO DIESEL ROOM ,JDVED OIL IN M,IIN Sl!Ml' 1 001070011 7 0110*11111!  ??.' DIESEL NO 3 PL1ICE WEIG/ITS ON CO/ll'f,IN HI VIB INST1ILr.lW WEIG/ITS 1'0 COl!l'LING AS DIR 1 001071230 2 01N1/1"e /IC T'llNP t~RC*i'"Li Ot)O'l/flli i'R 8,ISEI'/,AT HG/1"3 R?.Gli'Ol!T BASP:i'IulTf: NO CRO/!T NECESS,IRY 1 91211i1ti01 120 BASt:l'Lt11' l/GR*2~ l'l!/,f, 1'L1ITc E'L/ISH TIGHTEN BOLTS TO l'ROl'ER 1 9121 111412 121 01 /07 /fH) i'l/

HGRn1 RiSl'LACE MISSING BOT.T RF.l'L1ICE MISSING BOLT 1 9121q11113 121 01/07/llli l'H B11Si':PL1IT INSTAii PLATE WASHF.RS fNST Aiieb PLATE WASllERS i !ii21~11d9 125 Ul/O.,/no PR iJ..ISEPI11IT /IGR~o 01 INST ALf,EIJ CONSTRAINT 1 912200827 238 01/0'lf!Jll cc Pll'ING 1o~cc~s*1 DC 79~532,1 JNST1ILL CONSl'RtlINT NSC 76 INSTALLED CONSTR1UNT i 912210930 238 01,IO'//llU cc l'INNG e~cCo281 DC79nS32,J INSTA[,L CONSTRtUNT

  • 01/0*1/flO I'll SNIJBDER WFPD.11ss-111 llESERVOIR 01/:r m* OIL REPLACW i'Il't: NIPl'f.'i': 1JND 1'WO SEAL lltl 1 1

912291530 9120111011 139 2811 Ot/00/f!O /IC VALVZ It'Va11155C SEAT Lf.AKAGi REWORKED V1ILl'E ,,_)

)

r1r.*;~r=Nr*c11 I\

IJ FEB BB

  • 2109 m PAGE 2
I f!NITh 2/0'1/BO J

(MMN'l'i\N,INCE OF S11FETY Rr:l;,ITEIJ SYSl'F/>IS DI/RING !T11G6 OR RfVl'CED 1'0/IFR l'illTODS)

R?7'Sf.'/i'V I U' SYS COMP M1IRKNO SllNM1IRY WKl'ERF II NR TOTDWN7'M 01)011/nc i'/1 SI'RG HGR HGRrOOl ROD DENT STRMGHTF.N Df.'NT ON T'l 1Rl'OSE 7'0 FI7' INTO CF.JUNG 1 9121'11400 1*12 01/00/lltl i'/i D1ISf..'I'L:IT HGR 20i35 INSTALL l'f,,ITE WASl/i':RS INS1'ALUD l'LA7'f, WilSf/ERS 1 9121 1111106 1 1111 01/00/a*~ I'll DASi':l'T.tlT HGR"2 BASt:PL1ITE l'UT,UW FROM f.IALL 8AS1l'LAT6 POLI.ED 11G:IINST WALL 1 91211111109 11111 Ol /00/lll' i'fi D1iSt:i'L 1IT HGRn5 R?:GROilT iJ,jsr.'i'LITE Af.Rt:ADY RiG!IOl/Ti'D i 9i21*114it 1114 l.l l/00/IH~ i'll 81ISEl'L1IT l/GR*3 T'lff,L PL1ITE f'WSH TORQUED TO N1IX ,lf,f,Olv11DLi" 1 91211111116 111*1 l j 01/00/00 i'R SPRG I/GR llGRol Rt.'l'l.11CE MISSING BOLT MIST1IKEN /IOU? IN BASEl'T,,.ITf. 1 9121411117 1113 01/.ottAuo i'll iJ,isiri,ir HGRv8 ii*[,{, i>iATE Fiusii 1*11ir.iiJ riAi't.' E'T,1 1sii ,iGAINST i.i,itt i 9i2i11i42o ii13 01/.011/110 r.*c.* IWI' MTR hRC~P.1:1 RtNOVE AND REPLACE MOTOR COMPLETED 1 912200500 936 01/.09/llll cc PIPING 2/2ncc~104 INST,lf,L P11D INST,ILL CONSTR,lfNT 1 0010311!03 95 cc io~cc. i*1 DC 79~532,j INST,iii cdNsriUi:NT INSTALiED coi>JSTR1IINT i iiio2ii5o'i itii e

01/09/80 i*IT'lNG 01/09/Ull cc llX i.cc.E"LI CIJF.CK FOR Tl/DE LEAKS TARSET Cf,F.:INF.D ll11Tii,'R BOX 1 906130'100 q296 01M9/HO cc /IX 1 .. cc.r... 1,1 DEVELOPED LEAK WI/ILE 01/T OT SERVICE T'WGGFD T/IDE 1 911110800 13q4 Oi/09/0U J'i1' iiASt.'I'i,,IT HGJlvt2 REGliOiFi 8,isiiit,itt Rl°G il<iiit Eb l !ii2iilii1iJij iGli 'I 01)09/80 I'll SPRG HGR HGR"1 RH'LACE MISSING STUD REPLACED MISSING STl!D 1 91214111111 160 I 01/09/80 cc PIPING 10.cc .. 0110 INSTALL CONSTRAINT DC19,.S32A INST ALLF.V CONSTR,llNT 1 912161600 551 il1/09/60 cc. l'INNG

  • ta~cc.0110 bC 79wS32,1 1Ns'l'ALL Rt:STRAIN'J.' AZ16BJ 1NST1ILL CONST!IAIN1' i 9121Bi55i 315 01)09)00 1'll SNl!BDlR lnRC*HSS~16'.l RFMOVE 12 IN SNllBBF.R TORQUED CAPSCRf.llS 1 912231330 95 )

Oi}09)00 i'R SN/IBB8R hRCwll5S~163 RFMOVE 12 IN SN//BBi\R TORQUED CAl'SCRr:llS 1 912231331 95

- Fl!NCTION ,IL Tr.STF.lJ 11ss.;.R1PL'1CED. IT . !!1 ~;;31n~ ~~? N ili)09/li0 }'R SNl!/Wt:R hRC .. lJSS .. 166 REMOVE 12 IN SNlllJTJF.R \.D 01)09/00 i'R SN//BBER 1"RC-IJSS*161 RE/./OVE 12 IN SNl/BBF.R TOT/Ql!ED C1ll'SCREWS 1 912231333 95 01/09/110 I'R SN//BDER l*RC*IJSSn 1 *10 Rl/llOVF. 12 IN SNllBBER 2'0RQ/!lD CAT'SCRFJIS i 9122313311 95 01/09/00 l'll SNUBBEll i~RC .. iJSS* ~1 *11 Rh/OV6 12 tN SNIJIJBi\R TORQ/lf.iJ CAr.X litl.'S 1 !il223i:tiS 95 01/09) ltO er; l'IPING 0 .. cc .. 32 DC19~S32A INSTALL CONSTRAINT INST 1ILT.i"D CONSTRMNT 1 9122011106 216 01/09/1!1' cc l'II'ING 18nCCn236 IX"l9oS32A R?NOV6 U~BOLTS. INST1ILLFD CONS1'R,Uf."T 1 912261407 215 tflsrAtt coNsf8AiNT T iiiiiii3i32i jfi 01/il/Ul' cc PIPING i2wtc;.21 CdMPtF.TF.iJ 3

01/11/Atl !IT/ PIPING Ri':MOV6 BLIND FL1INGi': RtJ.IOVED 8£,INK FL1ING1 1 001111909 FLOW R1ITE LF.'SS TH1IN DESIRED RF.PLACED Tf/NI' 1 910290700 15 Olt11/HO

/Jt:TT 7'01'. 11:

(.'V l'llMP i.cv~l'~to

.... .,'0.,!'1"7.,

) '

.. J i

  • Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT #2
  • - Mechanical Maintenance

D?.'i'1'=ft:{:'(:/1 11 FFB 80

  • 2:19 l'H l'AG?.' 1 llNIT2~ 2/011/eo (N.1.1 :1i'r.'N1INCi'.' OF S1IFF7'Y R?'fdTF.IJ SYSTt:MS DI/RING Ot 1T,lr.1.' OR REV/ICFD nJivnl lFflIODS)

R?TS?lil' Iii' .';)';; COMP M1IRKNO Sl'MM1IRY WKi'?.'llf' /I MR TOT{)fmTM oi)u:1/nu liS i'llitP 2.RS*l'*H' l'l!NI' S;idk.? Wll?N kttilNINd 01/03/ftll r.s AIMl.IS1'iD /J?.'FU:C.TOil DISK 2 iiotini1rno 25 V1ILVE 2.cs.FL*U Flf.Ti!R BONNET Lf.AXING 01)03/!10 cs VALVE CH1INGlW GllSl<.F.T 2 9120511!01 2~csqE'1;.111 BONNBT OF E'lf.Ti':R f.EAKING 512 01/0:J/OO r*~

C/JANGFD GASKFT 2 9120511!02 PII'ING li.ns~1111nl53 512 01)03/0U RS"' PIPING E'hRS* 2 5 *1,1

/JOLTING CORRODt:D NO l'ROTJLFN 2 9120511116 513 80[,T f'LANGF. NO l'ROB/,EM 01/03/00 RS H!Ml' 2~ns.1'1211 2 912101170 513 DISCIIARGE Ff.ANGE BOLTING NO l'ROTJLr:f-1 01)05/Hll liC VAJ;Vt: 2*RCP11 JiEi'ACK VALVZ 2 912101122 51q RE:P1ICKF.D v tit.Vt: 2 01/0'l/flll i"f.' DIESEL 2 iliiioi1t1ii*i 6 ADD OIL TO DIFSEL Sl!MP 1IDDi':D OII. TO MAIN Sl'Ni' Ul/09/BO SI VAt,VF. nv.sr~201 2 001070810 1 )

DIAP//R,lftl IS RllfTURED RFi'1IIRFD 01/09)00 RS I'UMP 2*RS*P* 2ll 2 90'1052220 936 WRONG stiF. BOLT*s Rt:J'LACi':D S1';1DS 01)09/80 RS PIPING 1o~ns"1u2~1s3 OOLT MISSING ON Sl'RlNG HANGF.R

i 912osiq1*i isq 01/12/!JIJ Rf'l'f,11Ci"D MISSING BDT,T 2 912101121 1sq IA V1ILVZ 2-r,1.516 CtlP BLOWN OFF l'IPlNG uiJi11/oo RC so 2-kc.E~1c OPEN riWi,lni ~IAMiAis REPAIRED AIR LINE RFNOVF.D*RFINSTAu;tD ~: .. 1w Ar.§ 2 0011110112 2e 01/15)00 DG V1ILVE 2.Dc~*111 VALVE: LEtlKS T/18/J 8 TO B LEAK REi',IIRFD 2 !ii21oii2q ise Ul/18/!IV /);I VALVE TV~D,1~200 ..1 VALVE LEAKING fT 16.11 2 001021300 9 01/10/11') /1f.i'1lf8W VtlLVF. 2 001021303
ll iNSll 29118 SIG/IT ci,iss BROKEN 12 RBi'f, tlC?V 2 9ioOB11!i2 01/21/llll Sf l'Il'ING FE"29 113 ORlF1ICE LEAKS i637 01)21)110 REi'tlll/f.'D 2 900221513 61 SJ V1ILVE 2-sI~6 REP1ICK 1IDJ/!ST'?D PACKING 2 9120501q1 lll)'.21/ll!J Hf VAT.VE 2*81 ~liA REPACK - 61 Rri'1ICKiW 01}22/ll!) cc IW!i' i.cc~l'~1c Cl/ECK AXIAL T'LAY ON I'llNT' ADJ/!STED Tl/f((IST BZtlRih'G 2 iii2osi11i1q 61 01/2:!/RO SI VALVE 2.sI.11 RF.PACK 2 001210736 B Oi/:n)llu RF.i'ACKF.D VLV 2 9120507110 51 v,iiv,i: 2.TVt28H*1.~ kmick 90 VJ (1:1}:0/IH' SI REi'ACKF.D viv 2 !ii205o7116 iti1 VALVE 2*TVw20011c RET'ACK 01/23}00 REPACKF.D VLV 2 9120507117 11q IJG V1ILVE 2oDG*1 REPLACE DI Al'IJR A'lN REPLACED DI APHR/VJM+ORING Ol/23/llU Cti VAlVi 2.cii~iiji v,1tvt LF.Axs RZS1'0RED ViV TO GOOD CONDtTl(JN -*

2 902161001 3 01)211/fJU Sf l'UMl' 2*Sl *PnHJ l'IJLL l'/JMP 1IND CLEAN 2 9i2io2235 i21i (11)2~/0ll CL11INF.D Sf!C.TION CAN 2 001151010 118 fW MOV NOV *Ell* 2 51F Rf.MOVE STEN NllT FOR MEAS/JREf.JF.NT

() 1}211/00 COMT'U:1'f.D 2 0011e1q31 61 CH VALVE FCV.,2iil6 U:Ak AT V..ILVE BOi>l' TO BONNt:T COMT'U:1'f.D 2 901121111j7 9i 01;211/00 Sl YALVZ 2.sI.5 RET'1ICK 01/211/00 NO l'ACKING 2 9120507112 132 SI VALVE 2P8fu11 Rl:l',ICK RF.i',ICKt.'V VLV 2 9120507113 132 011211;00 SI V,ILl'E 2~sr.H5 Ri't*ACK /1Cl'ACJ<t:D l'lV 01)211/an Sf PIPING fh29311 2 9i2d51l711S i:l2 FT.ANGE LEAK e

RF:N(.'WZD FL1INGE GASK?T 2 912oso1qe 132 01/2*1/!!U Cl/ /.JOV MOVwCHh220'JC PACKING LEAKING oi)211/ao Rr.'l'1ICKF.IJ 2 912051*103 1*15 Sl l'ii'.tNG FEa29qo FiANGE iE,i}{ Ri.'[' AIRi':D 111)25}HO Git rt.IMP 2nC//nl'* 18 INB0,11/D SE1IL LE1IKS 2 9i2o5i422 110 GONl'f,t:U: l'Al'f.'R IVORK WST 2 020172090 0 01/25/00 Cl/ VALV8 2~cn.a111 RET'L1ICE DIAi'llRAGN RE"L1ICF.V BONNET 1ISSY 01)2s)oo t.M VALVE 2-n~1.a iEKS Tiiili1 ON Pi i6. ij OVERH,jf.ILF.D VAf,VC:

? 902161317 61 01/28/00 cc VALVE 2wCC~93 RE1'"1R PII'R CAT' Tl/READS ON y,JLVE REPAIRFD l'Il'E Tl/Ri"AIJS 2 912170020 360 01)28/0tl fl{ I'llMP 2*FW~l'*31I 2 001171305 101 OllW01IRIJ _I'f!NP P1ICKING Bl!8NiW Ill' REl'ACl<.ZD 01/29)HO CJ/ MOV Mov.c11~2210B 2 9po50725 2016 BONNET LE1IKING ON VALVE Ri.'NFWEV BONNET G,iSK?T 01/29/0IJ C(: VALVE 2 9120 51 llOll 7q Cll?CK VALVE LOOSE CLF.1INED CK VLV 01/n/oo 1;11 VALVE 2.c11.2011 2 001152355 120 RF.Pr./CE DI1IPHR1'fiM Rll'LACZD DI AP*G1ISKFT*ORING 01)29/00 SJ VAT.VE 2.si~2q 2 902161310 39 P1ICK.ING it:,iKING CONI'LETFD 01}30)00 DA l'IrING 2-Dt1~sa 2 9i2osiqoe 312 INSI'ALL TE:ST FLANGE FABRICATED FLANGE)Ri':MOV10 AFTF.R TE:ST 01/30)8!1 CTI VALVE 2*CHwllOO 2 00102130q 5111 THREADS t!T END OF PIPE GALLED CLE:1INED*DRESSED Tl/Rf.1WS 2 0012111q115 01)3<i)ilo TJS iii 12 6TilER l'r.i!G GAii~tJ iN Sl'ARE PENETRATION REf.IOV CD l'WG :i iJ<ii26073i L. 01J31/RO DS OTIIF.11 51 12 2 I'Li/GS GALLED IN Sl'ARE l'ENlTR1ITION HP:ftlOV F.IJ PWGS 2 001260730 23 .)

D?f'l'=/.;i'-.:1, IJ FF.B BO

  • 2: 19 /'M l',IGF. 2 l!NIT2~ 2/011100 (f.l.*lli.'i'i-'NANCF. OF SAFF.TY Ri':LATF.D SYS1',--.**.r; D/IRING O/!.TAG(; OR RFV/ICF.D l'OWF.R l'i"R[(IDS) li't:TSrliV/-!' SYS COMP Sl!M~J,IRY WKl'T-:RF /I MR T07'WNTM 02/01 /BO Gf{ PIPING U2JU1/flll r;11 or.ni ilou* lN Pin COHi'L8TFlJ l'Il'ING DRILE HOLE IN PIPE 2 rioi:d1s2s 196 COMl'EF'l'F:D vr.*1*r r11*r ;;. 2 001211526 196

'fRHllM .... I"'

w N

.. Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT /Fl Electrical Maintenance

v;:j*f-'FJ,?i.: 11 FEB 00

  • 2: 09 TN l't!Gi" 3 llNITh 2)0IJ/OO VW N'!'ifl ,INO: OF StlFF.TY ll'i:UTF.D SYSTEMS Dl'RING O/IT,t;'i: OR fl(,'D/ICFD l'OWFR I'f'RlODS) 1i*,~*1*sr:1. v1, r  ::y,r!* COMI' M1lllKNO Sf!MM1IR1 WKl'ERF II MR TOTDf/N7'M 01/0:J/fl\l ('Jl 1NStl .t~~*i113,I GtlE?N tIGliT W!l.L NO'l' ctt:An JN on:N JIEAV.JllS7'FD LIMIT Sit 1 91filii531 i1*1tj

!ll/0:1/1*0 Sf INS'l.'R fCn'156VX/l Rf.f,111 OrER1IT1S SLUGGISHLY RFLAY 1/EI'LACF.D AND Oi'FR..17'F. SAT 1 912311101 2'1 Ul/U'/}IJ!! ('!/ IJT lWL B~9 CHECK IIT ON LINE inCl/"351 CIRCl!ITS CllECKF.D OK 1 001021130 7 lll/O'//flll liC !WP MTR 1~11c"r.i,1 VISCONNEC'I.' MOTOR TZSTBD SAT 1 912191li30 ~56 IJi-.'i'I' '/'O'! ii. 1631 '

) .

l .. ' ._)

Maintenance of Safety Related Systems During Outage or Reduced Power Periods "UNIT l.'2 Electrical Maintenance

Dt:lT=FU'(.' ~I llNIT2n 2/0q/00 If FEB BIt

  • 2: 19 Fr.J I'11GF. 3 Ii (NtllNTENANCF. OF S1IFETY Ri':LA1'FD SYSTFMS DURING 01/T/OiE OR RW/ICED l'OWF.f/ l'F.RfODS)  !

Ri'2'S?FtV/i/' .'iYS COMI' NARKNO SI/MM ARY WKT'F.RF MR TOTDWN7'M Ol/06/BU t'l Ntsc 2.EinVGn'} kAbtAT<JR FAN lOIJliEil.<i TESTED SAT lll.l.1q/eo (;ii£ 8/!S 2J GRO/!ND INDIC1ITF.D ON 2J SWBD 2 9i2aonsii i~~

01/.lq/IJU i'.l'L BIJS TE.'iTED SA1' 2 907150130 qo16 211 GROllND INDl'CATi':D ON 211 SWBD CLF1IRED 01/i11/00 i'.'i'IJC lhl'l'T 2A2 ONE Ltlil/12' DIM ON GtlO/JND CU'ARi':D 2 901150135 qo16 01/16/AU cc VALVE TV ..CC"209 DISCONN8CT SOV FOR MECH 2 !ii2i3iio1 1i6 RECONNFCTF.D+CYCUD SAT 01)23/lllJ sr' NOV Mov~sw"2osc NOV l'NS I'ERFORNED AS l'ER ENT'wl'"Nov.q5 2 909121650 3768 \ I Oi/23/110 ,~*z BAT7' 282 liATTEllY C:llARGi'Jl SIJORTE:JJ 2 901251533 8256 u1n11/00 11S CH,IRGEJI CIJt.'CktV SA'l' 2  !!HI!io?6d 1560  !

FAN MTR 2*VSnf* l 1I E'AN MOTOR ms I 01/211/00 VS E'AN MTR FOl.'ND LOUVERS BLOCKt.'D Ol'F.N 2 901261004 8016 I 2"vs.F.10 FAN MOTOR I'MS 01)211/A\i vs .f*A},i liril FO/!ND WllVP:RS BLOCKED Oi'?N 2 901261005 2~vs~F-1c F,iN i.idi'dR I'ft!S 0016 011211/00 RC VALVE: if<jnk TO 88 COMT'iki*Fb ON S29Hli2iiii55 2 90i26iiiii6 8016 HCVwRC"255W CONNECT SOV 01)211/ao li'C VALVE CONl'LETt.:D AS I'F.R f'MI'rc,sov.ae 2 911201330 1032 llCV*fi'C.,255fill CONNECT SOV 6i)25/oo Ri' orilk Pili 2q3 REMOVE TEMFoRAiiY c,iiitir RENEWED AS I't.:R EMI'"sov~Ja ciJJ.ifitirtiJ coiiviiii' i:Nsr,1t;,F.v 911201332

.-.- ---- - ** iioeMii :i3i 1032 01)20/80 /'W I'l!MI' 2*E'W*I'*3B REI'f,11CE START SWITCI/ TESTED S,IT 36i 2 001160213 2qo iJ;::12* .w1*,11, ....... ""'"*"

w

°'

e I

i

) .

, I **"

Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT #1 Instrument Maintenance

4 FEB BO

  • 2:0!! ffl P,IGF 4 llNITb 2)04)00 (M,IIA1 1'i'."N,Jf~CE Of' SAFF.'TY RFf,,ITED SYS7'FMS DURING 01/V/;i\ OR REVllCf.'D ffJWFR l'iRJODS) ft'?*]'3ifi'\l/Ji' .s y,7 ca~11* ~l1INKNO Sl'f.fil/,lflY W/(l'i"RF II MR TOTDWN1'M *'  !

ll!/U'J/110 /!{: V Ar.VF. FCVv/o'C~1"'!!1l1 ov uli1 Au t c ;:nm kE:a VAViE k1111*1r.1* IYJSI.TIONFR i 9i2iq'i500 i2'i 01/ll;>/110 UC INSTR il:Vw1*'I55(.'/*156 IMl'f.t:Mt:JVT vc~*19uS53 COA/l'f,t:Ti'.'D AS Pi<:R PTWCFD/!RE 79~.5'53 1 912221000 269 01/0'l/U1 Till V,IJ,VF. FCV*1G05 VALVE DOES NO'l' GO Ftlf,f,f SH/IT 11DJllSTf/J 1/1' 1 912J01B25 52 01/02/1*u WI V.USE ilCV"1'15B C/IF.CK iJ,jgr:y l'OSiTiO#BR Av,J11su:n t/1' i 9i2:ii0032 52 01/0~i01J IJ/i i'//Nl' hliR*l'wli.I T1!NI' VOES NOT TRII' REMOVF.D Jl!MPER+7'C.'S1'ED ,'),IT 1 001012320 21 01/0'l/'IU /i/./ MON11'0P RM.m,.1ou Rt:ScT AL1IRM Ri':SET 1ILAllN 1INV ALARM i'OIN2'S 1 001060300 1.2 Ot)O'l/00 Ill MIX NR~1~4*1 iNVIC1iTiNG WITH iiinT siiil.TDOWN lliff'C.tiCF.D 8,it.Aricr. ~ioror. OlAR)ht,1fitiiG r orii oiui1:ia 96

  • J1/!J~J/A 1J t'T' HIS'.i'R CAL G,IGF. CHECKED 01.'T S1IT 1 0010*11305 96 U1}09/00 I'"

Iv INS'i'R Pis1"1J5<; 1'1*1~4 5q lNDICATING LOI{ CAiIBR,ITf.'lJ TR1INSMITTF.n 1 0010006*10 211 IJl/lJ!J/ll') Cl/ INSTR FCV.Cf/"1122 CONTROiit:R wri1; NOT nroVtATF. CON1'ROLS f/O/IM,jf, i iicii6ei 1i15 2 O!iltl/11!.I l!S I.V5T/I I.I ~RS*15Hl S/!Ml' LIWFL INDIC1ITION JS BRR11TIC SrtJRIOl!S ERR1ITIC INDIC1ITION 1 001081755 6 Ot)1l~Cill trs VAI,YB HCVoMS.10~ CIIF.'CK CON7'ROLU:R RESB.T t'/sP 01/TI'i!T 1 001090905 48 in)i 1/!iO Cl' lNS2'R i'i .. cv.,10L1 c.ii XMITTER TIGil2;~NED coiilii'°:CTION i iiiiiii9il9ii6 2i1 Ql}l1/i!O CV .rNS1R 1*r .cv.10111 C Af. XMIT'!FR OI'ERATWG NORMALLY 1 0010909'17 24 ilt/11/fl(! H.'1 MONl.TOR l/MnGWv10~~ CORfii':CT SETl'OINT 1IDJl!STFD Al.ARM SETWINT 1 061110451. 9 mrr '1'11'/'!I. 862

\.JJ (X> I

Maintenance of Safety Related Systems During Outage or Reduced Power Periods UNIT li2 Instrument Maintenance

DETT=INST 11 FEB 00

  • 2:19 l'/11 l'1IGF. 11

,J*.

l!NIT2* 2Jo11Jee (MAINTEN1INCE OF SAFf.TI RELATED SYSTEMS DURING 011vm: OR RF.DllCFD l'()WlR T'FRIOD.'i) m:rsr.:nv w* SYS COMP MARKNO S/IMMARI WKl'F:RF II MR TOTIJl{N1'/.I lii}o!i/eo Ei IfistR kieoniitn NcH' lililiktNG lit.ADING t,()i,I Ai:WISTED iFilO 2 iilii<i'li2i1i 211 1/C AC.1lmt SETIYJING Cl/F.CKED S1IT 2 001170230 01)17/.00 01/25/00 01/29)00 RM RM CH MONITOR MONITOR iNs'i'il RM~sv~211 RM*RMS"26i ir.iis CA SET l'OIN'l' NO RESIYJNSE TO CHECK SOURCE READING 6 rrn~tANk ts bilAtNtb Cf,E1INED Mf..Tf.R AiJj11S'J'r..iJ iNDICA7'0R 2

2 fl0121f0235 iiiii260132 20 2'1 01)29/00 02/01}00 DFiT WT 1lf.

Cfl HM INSTR INSTR PI"1H nn.200 READING 5 T'ER~TANK DET'RFSSURIZED BROKE 11DJl!STED INDCC1ITOR CON'1'1ICT :IR/11 DISCONNf.CTi':D+RECONNECTED 2

2 001260'/33 01113106116 20 211 132 )

I l

I i

e

HEALTH PHYSICS

" . JANUARY, 1980 There was no single release of radioactivity or radiation exposure specifically associated with an outage that accounted for more than 10%

of the allowable annual values in 10CFR20.

f-J. :- ** -,~... ~ --- *-***-


*-- 42 -

PROCEDURE DEVIATIONS REVIEWED BY STATION NUCLEAR SAFETY AND OPERATING COMMITTEE AFTER TIME Lil1.ITS SPECIFIED IN TECHNICAL SPECIFICATIONS JANUARY, 1980 None during this reporting period.