MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
~ ~
' I ~
~
'
5 ~ ~
~ ~ ~ \ ~
I ~ ~ ~ I ' ~ ~
'
~ ~
I ~
~
~ ~ ~ ~ ~ ~ '
~ ~ ~ I ~
Q g+~ a R
~ ~
g +~<
r)
3 3
Attached are corrected copies of October 1976 Operating Data~Reports for Turkey Point Unit Nos. 3 and 4. The corx'ections are."
Add revised refue1ing dates for Turkey Point Unit No. 3, Line 19.
Add estimated startup date for Turkey Point Unit No. 4, Line 20.
Ne x'egret any inconvenience caused by these omissions.
V- T- Chilson (3 -.
'"-'3
(;!3-3' 3;.'
A>
I } 3>
I I I
.) ~
3>>
A ff >
A f
>3
,>>V I l Af
~):
f
4 0 APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 250 UNIT Turkey Point Unit No. 3 REPORT MONTH October, 1976 DATE Nov, 5>> 1976 COMPLETED BY V T. Chilson TELEPHONE (30S) 552-3830 OPERATING STATUS
- 1. REPORTING PERIOD: 0001>>16>>10 01 CROSS HOURS Lf REPORTLNG PERZOD: 745.0*
THROUGH 2400
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200 MAX DEPEND. CAPACITY (MWe-Net): . 666 DESIGN ELECTRICAL RATING (MWe-Net): 93
- 3. POWER LEVEL TO WHICH RESTRICTED (IP ANY) (MWe-Net): ifONE
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE CUiiATIVE 745.0* 446.1 Si HOURS' CRITICAL....,
NUMBERS OF HOURS REACTOR 'ffAS 6 27 726.2
- 6. REACTOR RESERVE SHUTDOWN HOURS.. ~ . ~ ~ .. ~... 0.0 64.2 67.4
- l. HOURS GENERATOR Oif LINE. ....... . . . . 745.0* 6 355.6 26 72S.6 Si UNIT RESERVE SHUTDOWN .i,........., 0.0 0.0 85.0 9~ GROSS Tf{ERMAL ENERGY GENERATED (MWH) 1 614 694 13 733 282 51 045 542 10.'ROSS ELECTRICAL ENERCY GENERATED (MWH)... 505 740 4 340 645 16 355 881 11 ~ NET ELECTRICAL ENERGY GENERATED (MWH) i i i i ~ 480 673 4 119 351 15 47~+
- 12. REACTOR SERVICE FACTOR. 100.0 88. 1 80.9
- 13. REACTOR AVAILABILITYFACTOR.. ~........,... 100 0 88.9 81.1
- 14. UNIT SERVICE FACTOR. ~ 100.0 86.8 78.0
- 15. UNIT AVAILABILITYFACTOR..............,... 100.0 86.8 78.2
- 16. UNIT CAPACITY FACTOR (Using (MDC)......... 96 ' 84.5 68.8
- 17. UNIT CAPACITY FACTOR (Using Design i>>We). ~ . 93 ~ 1 81. 2 65.2 lgi UNIT FORCED OUTAGE RATE ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
0.0 0.1 3.0
- 19. SHUTDOWNS SCHED~ OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, maintenance, and inspections November 13 through December 27, 1976
- 20. IF SHUTDOWN AT END OF REPORT PERZOD>> ESTDfATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY CO'0{ERCIAL OPERATION
'hanged from DST to EST on October 31, 1916
APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 - 250 UNIT Turkey Point'nit No, 3 REPORT MONTH October> 1976 DATE Nov. 5, 1976 CO:DELETED BY V ~ T. Chilsoa TELEPHONE (305) 552-3830 OPERATING STATUS
- 1. REPORTING PERIOD: 0001.76 10 01 CROSS HOURS IN REPORTZNG PERIOD: 74 .0*
2~ CURRENTLY AUTHORIZED POWER LEVEL (MWt):
NAE DE.PEND. CAPACETE (NG -NSA): ~66 DESIGN ELECTRICAL RATING (MWe-Net): 93
- 3. POWER LEVEL TO WHICH RESTRZCTED (IP ANY) (MWe-Net): NONE
- 4. REASONS FOR RESTRICTION (IP ANY):
THIS MONTH YEAR TO DATE CUMULATIVE
- 5. NUMBERS OF HOURS REACTOR WAS CRZTZCAL... ~ . 745.0* 6 446.1 27 726.2
- 6. REACTOR RESERVE SHUTDOWN HOURS...,,...,... 0.0 64.2 , 67.4
- 7. HOURS GENERATOR ON LliK...,.............,, 745.0* 6 355 ' 26 725.6
- 8. UNIT RESERVE SHUTDOWN HOURS.....,.....,... 0.0 0.0 85.0
- 9. GROSS TNRRNAR ENERGY GENERATED (NNE)...... 1 614 694 13 333 262 3~1645 42
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) ~ ~ . 505 740 4 340 645 16 355 881 NET ELECTRICAL ENERGY GENERATED (MWH)..... 480 673 4 119 351 1~547 6)~
- 12. REACTOR SERVICE FACTOR....;............... 100. 0 88. 1 80.9
- 13. REACTOR AVAILABILITYFACTOR. ~ ~ ~ ~ ~ ~ ~ .. ~ . ~ ~ ~ 100.0 88.9 81.1
- 14. UNIT SERVICE FACTOR .. 100.0 86.8 78.0
- 15. UNIT AVAILABILITYPACTOR. ~ ~.......... ~..., 100.0 86.8 78.2
- 16. UNIT CAPACITY PACZOR (Using (RAmC)......... 96.9 84.5 68.8
- 17. UNIT CAPACITY PACTOR (Using Design MWe)... 93 ' 81. 2 65. 2
- 18. UNIT FORCED OUTAGE RATES ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
0.0 O.l 3.0
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, maintenance, and insPections - November 13 through December 27, 1976
- 20. IP SHUTDOWN AT END OF RR'ORT PERIOD, ESTIMATED DATE OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COEKRCIAL OPERATION): PORECAST ACHIEVED INITIAL CRZTICALZTY INITIAL ELECTRICITY COKKRCIAL OPERATION NOTE:
- Changed from DST to EST oa October 31, 1976
o APPENDIX C OPERATING DATA REPORT DOCZET NO. 50 - 250 UNIT Turkey Point Unit No. 3 REPORT MONTH October. 1976 DATE Nov. 5, 1976 BY V T4 ChQ.soa TELEPHONE (305) 552-3830 OPERATING STATUS
- 1. REPORTING PERIOD: 0001,76410 01 GROSS HOURS ZN REPORTING PERIOD: 745.0+
THROUGH 2400 7
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):
MAY(-DEPEND. CAPACITY (MWe-Net): . 666 DESIGN ELECTRICAL RATING (MWe-Net): 693
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (LMWe-Net): NONE 4~ REASONS FOR RESTRICTION (ZF ANY):
THIS MONTH YEAR TO DATE CUMULATIVE
- 5. NUMBERS OF HOURS REACTOR 'WAS CRITICAL..... 745.0* 6 446 ~ 1 27 726.2
- 6. REACTOR RESERVE SHUTDOWN HOURS.... ~....... 0.0 64. 2. 67.4
- 7. HOURS GENERATOR ON LINE..........,...,.... 745.0+ 6 355.6 26 725.6
- 8. UNIT RESERVE SHUTDOWN HOURS....,....,..... 0.0 0.0 ~ 85.0
- 9. GROSS THERMAL ENERGY GENERATED (MWH).. ~ ... 1 614 694 13 733 282 51 045 542
- 10. GROSS ELECTRICAL tDlERGY GEKRATED (MWH). ~ . 505 740 4 340 645 16 355 881
- 11. EEY ELECYRYCIL ENERGY GLYEIIRYEC (IGIEI..... 466 673 4 115 351. 4~547
- 12. REACTOR SERVICE FACTOR ~ ~ . ~ ~ ~ ~ ~........ 100.0 88 ~ 1 80.9
- 13. REACTOR AVAILABILITYFACTOR...,.....,...., 100.0 88.9 81.1
- 14. UNIT SERVICE FACTOR. ~ ~ 100.0 86.8 78.0
- 15. UNIT AVAILABILITYFACTOR....... ~........,. 100.0 86.8 78 '
- 16. tDtZT CAPACITY FACTOR (Using (MDC),......, 96.9 84.5 68.8
- 17. UNIT CAPACITY FACTOR (Using Design MWe)... 93.1 81.2 65.2
- 18. UNIT FORCED OUTAGE RATE. 0.0 0.1 3.0
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MOIIHS (TYPE, DATE, AND DURATION OF EACH):
Refueling, neiateneace, and inspections Noveaber 13 through Decenber 27, 1976
- 20. IF SHUTDOWN AT RID OF REPORT PERIOD, ESTDGETED DATE-OF STARTUP:
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION NOTE:
- Changed from DST to EST on October 31, 1976
~ R APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 251 UNZTTurke Point Unit No. 4 REPORT MONTH October 1976 DATENov. 5, 1976 COMPLETED BY V ~ T. ChiIson TELEPHONE (305) 552-3830 OPERATING STATUS
- 1. REPORTING PERIOD: 0001676.10 01 GROSS HOURS IN REPORTING PERZOD:
THROUGH 240
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):
MAX.DEPEND. CAPACITY (MUe-Net):
- 3. POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Net): NO
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE CUMULATIVE
- 5. HCHSERS 07 HOIIRS REACTOR EAS CRZTZClii..... 536.2 5 357.6 2~ZOO
- 6. REACTOR RESERVE SHUTDOWif HOURS........., ~ . 0.0 0.0 117.1
- 7. HOURS GENERATOR ON LINE.....,...,.......,. 527.7 5 159,3 20 434 0 )
8~ UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
0.0 0.0 0.0
- 9. GROSS THERMAL ENERGY GENERATED (MWH)....., 1 134 444 10 957 697 41 606 333
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH)...
~
365 550 3 4~g~
NET ELECTRICAL ENERGY GENERATED (MWH)
'1.
~.... 346 662 3 317 972 12 77~g
- 12. REACTOR SERVICE FACTOR..... ~ ............ , 72.0 777
- 13. REACTOR AVAILABILITYFACTOR.... ~ .. ~ ~ ~ ~.... 73.2 75.5
- 14. UNIT SERVICE FACTOR............., . 70.8 70.5 73.0 15 UNIT AVAILABILZTYFACTORS* ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 70.5, 73.0 I
16 lRGT CAPA'CITY FACIOR (Using (MDC)......... 69 ~ 9 68.1 69.3
- 17. UNIT CAPACITY FACZOR (Using Design MWe)... 67-1 65.4
- 18. UNIT FORCED OUTAGE RATE.. ~... ~.... ~....... 4.1 3.6 19 ~ SHUTDOWNS SCHEDULED OVER iKKT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
206 IP SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: Nov.
- 21. UNITS IN TEST STATUS (PRIOR TO CORERCZAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COlOKRCIAL OP ERATION NOTE: " Changed DST to EST on October 31, 1976 (1) Corrected-to-date
~
Rl
~ 9 APPENDIX C OPERATING DATA REPORT DOCKET NO. 50 251 UNZTTurke Point Unit No.
'EPORT 4
MONTH October 1976 DATENov. 5, 1976 COMPLETED BY V T. Chi1son TELEPHONE (305) 552-3830 OPERATING STATUS
- 1. REPORTING PERIOD: 0001.76 10 01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 240 2 CURRENTLY AUTHORIZED POWER LEVEL (MWc): 2200 MAX.DEPEND. CAPACITY (MWe-Net):
- 3. POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (MWe-Nec): NO
- 4. REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE CUMULATIVE
- 5. NCIISERS 07 HOIIIIS REACTOR IIAS CRETTCAR... 536.2 5 357.6 2~10P 6~ REACTOR RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0.0 ~117.
7 ~ HOURS GENERATOR ON LINE ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ , 527 ' 5 159 ' 20 434.0 8~ UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
0.0 0.0 0.0
- 9. GROSS THERMAL ENERGY GENERATED (MWH) ~..... 1 134 444 10 957 697 41 606 333 10.
11.
12.
GROSS EEECTRTCAS ENERGY GNVEEATEO NET ELECTRICAL ENERGY GENERATED (MWH) ~
..........
(NNI7...
~...
365 550 346 662 72.0 349063 3 317 972 '21;~B3 77~/)
REACTOR SERVICE VACTORFACTORS' 777
- 13. REACTOR AVAILABILITYFACTOR.. ~ ~ ~ ~ * ~ ~ ~ ~ 73.2 75.5
- 14. UNIT SERVICE FACTOR..... ~ . ~.... . ~ 70.8 70.5 73.0
- 15. UNIT AVAILABZLZTY ...... 9.... ...
~ ~ 70.5 73.0
- 16. UHIT CAPACITY FACTOR (Using (MDC)....... .. ~ 68.1 69.3
- 17. UNIT CAPACITY PAC10R (Using Design MWe)... 67.1 65.4 189 UNZT FORCED OUTAGE RATEV ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 1.0 4.1 3.6
- 19. SHUTDOWNS SCHEDULED OVER iKKT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. IF SHUTDOWN AT END OF REPORT PER10D, ESTIMATED DATE OF STARTUP: Nov.
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY CO)D(ERCZAL OPERATION NOTE:
- Changed DST to EST on October 31, 1976 (1) Corrected-co-dace
~ 3 5
APPENDIX C OPERATLlG DATA REPORT DOCKET NO. 50 251 UNZTTurke Point Unit No. 4 REPORT MONTH October 1976 DATENov. 5, 1976 COMPLETED BY V T Chilson TELEPHONE(305) 552-3830 OPERATING STATUS
- 1. REPORTING PERIOD: 0001,76 10 01 GROSS HOURS IN REPORTING PERIOD:
THROUGH 240
- 2. CURRENTLY AUTHORIZED POWER L~c, (MWt): 2200 MAX.DEPEND. CAPACITY (MWe-Net):
- 3. POWER LEVEL TO WHICH RESTRICTED (ZF ANY) (AAWe-Net): NONE 4~ REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YEAR TO DATE CUAAATIVE
- 5. IIIMIEltS OF HOURS ItEACIOR OAS CRIIICAL.. 536.2 5 357.6 2~200
- 6. REACTOR RESERVE SHUTDOWNi HOURS............ 0 0 ~117.
- l. HOURS GENERATOR ON LI;lE.........,......,., 527.7 5 159,3 20 434 0(
86 UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ *~ ~
0.0 0.0 0.0
- 9. GROSS TllElQQL ENERGY GENERATED (MWH)....., 1 134 444 10 957 697 41 606 333
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) ~ .. 365 550 3 4<iVV'~
- 11. REI ELECIRICAL ENEROF OEtESAIEO {EURl..... 366 662 3 317 572 1~2776
- 12. RFACIOR SERVICE FACIOR ................... 72.0 ~7
- 13. REACTOR AVAILABILITYFACTOR. 73.2 75.5
- 14. UNIT SERVICE FACTOR. 70.8 70.5 73.0 15 UNIT AVAILABILITYFACTOR..., ., ~
70.8 70.5 73.0
\
- 16. UNIT CAPACITY FACTOR (Ueing (MDC)......... 69 ~ 9 68.1 69. 3 17 ~ UNIT CAPACITY FACTOR (Using Design MWe)... 67.1 65.4 1S, UNIT FORCED OUTAGE RATE...... ~ .......... 1.0 4.1 3.6
- 19. SHUTDOWNS SCHEDULED OVER iKkT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: Nov.
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED ZAIZTZAL CRITICALITY INITIAL ELECTRICITY COlOKRCZAL OP ERATZON NOTE:
- Changed DST to EST on October 31, 1976 (1) Corrected-to-date
0 e