Category:Letter
MONTHYEARML24023A0342024-02-0505 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0038 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML23341A2102024-01-22022 January 2024 LTR-23-0216-1 - Closure Letter - 2.206 Petition for License Renewal Plant Reactor Pressure Vessel Embrittlement ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-007, Inservice Inspection Program Owner'S Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report2023-12-0606 December 2023 Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report ML23340A0332023-12-0101 December 2023 FPL to Fws, Comments Submitted by Florida Power and Light on the Species Status Assessment Accompanying the September 20, 2023 Proposed Threatened Species Status with Section 4(d) Rule for the Miami Cave Crayfish L-2023-172, Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule2023-11-29029 November 2023 Supplement to Exemption Request Regarding Enhanced Weapons. Firearms Background Checks. and Security Event Notifications Final Rule L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23333A0152023-11-27027 November 2023 Attachment G - Arcadis Memo Re FPL Year 4 Raasr Final (June 2, 2023, Appended to Derm letter)-1 ML23333A0102023-11-27027 November 2023 Attachment B - 11/07/2022 - Waterkeeper Scoping Comments-1 L-2023-146, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule L-2023-078, License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles2023-11-15015 November 2023 License Amendment Request 278, Incorporate Advanced Fuel Products, Extend Surveillance Intervals and 10 CFR 50.46 Exemption Request to Facilitate Transition to 24-Month Fuel Cycles IR 05000250/20230032023-11-0909 November 2023 Integrated Inspection Report 05000250/2023003 and 05000251/2023003 ML23310A1342023-11-0404 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 Petition Amendment; Turkey Point Subsequent Renewal with Petitioner 11/04/2023 ML24016A2622023-10-25025 October 2023 Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected Project L-2023-077, License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis2023-10-11011 October 2023 License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published IR 05000250/20230102023-09-29029 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000250/2023010 and 05000251/2023010 ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23265A5492023-09-22022 September 2023 Transmittal of WCAP-18830-P/NP Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles to Support a License Amendment Request from FPL - License Amendment Request 277 Updated Spent Fuel Pool Criticality Analysis ML23243A9522023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9542023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9532023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML23243A9552023-09-0808 September 2023 Notice of Availability of the Draft Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application - Tribe- Section 106 Letters ML23199A2352023-09-0505 September 2023 Letter to EPA-Turkey Point Nuclear Generating Station, Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal ML23199A2482023-09-0505 September 2023 Ltr to Florida Power and Light Co - Turkey Point Nuclear Generating Units 3 and 4 - Notice of Availability of Draft Site-Specific Environmental Impact Statement for Subsequent License Renewal L-2023-110, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-08-25025 August 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project IR 05000250/20230052023-08-21021 August 2023 Updated Inspection Plan for Turkey Point, Units 3 & 4 (Report 05000250/2023005 and 05000251/2023005) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update IR 05000250/20230022023-08-14014 August 2023 Integrated Inspection Report 05000250/2023002 and 05000251/2023002 L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 ML23242A0922023-08-0606 August 2023 Request for Withholding Information from Public Disclosure for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23198A2702023-08-0303 August 2023 Issuance of the Site-Specific Environmental Impact Statement Scoping Process Summary Report Associated with the Turkey Point Nuclear Generating Unit Numbers 3 and 4, Subsequent License Renewal Application, Environmental Report Supplement 2 L-2023-094, Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project2023-07-27027 July 2023 Response to Requests for Additional Information Regarding License Amendment Request No. 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23178A1872023-07-25025 July 2023 Review of the Spring 2022 Steam Generator Tube Inspections During Refueling Outage No. 33 ML23188A1242023-07-20020 July 2023 Acknowledgment of Temporary Suspension Request for License Request for License Amendment Request Reactor Protection System, Engineered Safety Features System, and Nuclear Instrumentation System ML23200A0672023-07-18018 July 2023 Tp 2023 RQ Inspection Notification Letter ML23173A0812023-07-17017 July 2023 Supplement to Regulatory Audit Plan in Support of Review of License Amendment Request Supporting Digital Instrumentation & Control Modernization Project (EPID L-2022-LLA-0105) - Non-Proprietary L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) 2024-02-05
[Table view] Category:Operating Report
MONTHYEARL-2022-039, and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2022-04-14014 April 2022 and Point Beach, Units 1 & 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2021-097, and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report2021-05-13013 May 2021 and Independent Spent Fuel Storage Installation - 10 CFR 72.48(d)(2) Summary Report L-2021-096, 10 CFR 50.59(d)(2) Summary Report2021-05-11011 May 2021 10 CFR 50.59(d)(2) Summary Report L-2021-018, 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report2021-02-16016 February 2021 10 CFR 50.46 Emergency Core Cooling System LBLOCA 30-Day Report L-2020-065, Submission of Periodic Reports2020-04-0909 April 2020 Submission of Periodic Reports ML18227A9832018-08-15015 August 2018 Submit First Year Operation Report. L-2008-245, Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/082008-11-10010 November 2008 Transmittal of 10 CFR 50.59 Summary Report of Changes, Tests and Experiments Made Without Prior Commission Approval for Period 12/09/06 - 05/11/08 L-2007-053, Annual Radiological Environmental Operating Report2007-05-0404 May 2007 Annual Radiological Environmental Operating Report L-2004-097, Annual Radiological Environmental Operating Report2004-05-11011 May 2004 Annual Radiological Environmental Operating Report ML18227B0771978-03-17017 March 1978 03/17/1978 Letter Operating Summary Reports of February 1978 ML18227A4231978-03-0404 March 1978 Attached February, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0631978-03-0404 March 1978 03/04/1978 Letter Operating Status Reports of February 1978 ML18227A4221978-02-14014 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0641978-02-14014 February 1978 02/14/1978 Letter Operating Status Reports of January 1978 ML18227A4211978-02-0404 February 1978 Attached January, 1978 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0651978-02-0404 February 1978 02/04/1978 Letter Operating Status Reports of January 1978 ML18227A4201978-01-0707 January 1978 Attached December, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0671978-01-0707 January 1978 01/07/1978 Letter Operating Status Reports of December 1977 ML18227A4191977-12-0303 December 1977 Attached November, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0681977-12-0303 December 1977 12/03/1977 Letter Operating Status Reports of November 1977 ML18227A4171977-11-0505 November 1977 Attached October, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0691977-11-0505 November 1977 11/05/1977 Letter Operating Status Reports of October 1977 ML18227B0701977-10-0505 October 1977 10/05/1977 Letter Operating Status Reports of September 1977 ML18227B0711977-09-0303 September 1977 09/03/1977 Letter Operating Status Reports of August 1977 ML18227A4151977-09-0303 September 1977 Attached August, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0731977-08-0505 August 1977 08/05/1977 Letter Operating Status Reports of July 1977 ML18227A4141977-08-0505 August 1977 Attached July, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0741977-07-0707 July 1977 07/07/1977 Letter Operating Status Reports of June 1977, and a Revised Operating Data Report for May 1997 for Turkey Point Unit 3 ML18227A4131977-07-0707 July 1977 Attached June, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. May, 1977 for Unit 3 Incorrectly Reported for Some Values. Attached Revised May, 1977 Operating Data Report for Unit 3 ML18227B0751977-06-0606 June 1977 06/06/1977 Letter Operating Status Reports of May 1977 ML18227A4121977-06-0606 June 1977 Attached May, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0761977-05-0505 May 1977 05/05/1977 Letter Operating Status Reports of April 1977 ML18227A4111977-05-0505 May 1977 Attached April, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4101977-04-0404 April 1977 Attached March, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. Maximum Dependable Capacity (MWe-Net) for St. Lucie No. 1 Was Revised from 802 MWe-Net to 777 MWe-Net (Estimated) ML18227B0781977-04-0404 April 1977 04/04/1977 Letter Operating Status Reports of March 1977 ML18227B0791977-03-0707 March 1977 03/07/1977 Letter Operating Status Reports of February 1977 ML18227A4091977-03-0707 March 1977 Attached February, 1977 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0801977-02-0707 February 1977 02/07/1977 Letter Operating Status Reports of January 1977 ML18227B0811977-01-0707 January 1977 01/07/1977 Letter Operating Status Reports of December 1976 ML18227A4081977-01-0707 January 1977 Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0821976-12-0606 December 1976 12/06/1976 Letter Operating Status Reports of November 1976 ML18227B0831976-11-15015 November 1976 11/15/1976 Letter Corrected Copies of Operating Data Reports for October 1976 ML18227B0841976-11-0808 November 1976 11/08/1976 Letter Operating Status Reports of October 1976 ML18227A4061976-11-0808 November 1976 Attached October, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227A4071976-11-0505 November 1976 Attached Corrected Copies of October, 1976 Operating Data Reports for Turkey Point Unit Nos. 3 and 4 ML18227A4051976-10-0808 October 1976 Attached September, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0861976-09-0707 September 1976 09/07/1976 Letter Operating Status Reports of August 1976 ML18227A4031976-09-0707 September 1976 Attached August, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1 ML18227B0871976-08-0505 August 1976 08/05/1976 Letter Operating Status Reports of July 1976 ML18227A4021976-08-0505 August 1976 Attached July, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1. St. Lucie Unit No. 1 Was Previously Reported to Be in Commercial Operation, in Error. Attached Corrected June 1976 for St. Lucie No. 1 2022-04-14
[Table view] |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DISTRIBUTION FOR INCOMING MATERIAL 50-2 /251 335
<<EC ORG: SCMMIDT A D DQCDATE: 02/04/78 NRC FL PWR 5 LIGHT 'DATE RCVD: 02/13/78 l 3OCTYPE: OTHER NOTARIZED: NO COPIES RECEIVED
SUBJECT:
LTR 1 ENCL 1
=ORWARDING MONTHLY OPERATING REPT FOR SUBJECT FACILITY"S 3 8c 4 AND SUB JECT FACILITY UNIT 1.
-LANT NAME: TURKEY POINT UNIT 3 REVIEWER INITIAL: X JM TURKEY POINT UNIT 4 DISTRIBUTER INITIAL:
ST. LUC I E UNIT 1 DISTRIBUTION OF THIS MATERIAL IS AS FOLLOWS
-""MONTHLY:OPERATING 'REPORTFOR,. GRAY BOOK .PREPARATION.
( DISTRIBUTION CODE A003)
FOR ACTION: BRANCH 83@F LEAR44W/2 ENCL INTERNAL: EG FILE++W/ENCL NRC PDR44W/ENCL OR ++W/2 ENCL EXTERNAL: LPDR S MIAMI, FL~~W/ENCL TIC++W/ENCL NS I C~~W/ENCL BNL(NATLAB>++W/ENCL ACRS CAT 8++W/0 ENCL DISTRIBUTION: LTR 10 ENCL 10 CONTROL N 780440061 SIZE: 1 P+3P+8P THF FND %%4%4 4%%%%%4%%%%%%%%%%%4%
l
I, 5 ~ FLORIDA POWER 8 LIGHT COMPANY February 4, 1978 Ply PlQ5L) lcd.gcwy CCmIS;.'cw hQI ~:ic~
~
Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington,,D. C. 20555 Gentlemen:
Attached are the January, 1978, Operating Status Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. 1.
Very truly yours, D. Schmo.
Vice President t
Power Resources VTC/DDC CC: Mx. James P. O'Reilly Robert Lowenstein, Esquire 780440061 PEOPLE... SERVING PEOPLE
AVERAGE DAILY le IT POWER LEVEL DOCKET i'. 50 250 Turkey Poinh UNIT U DATE F . 4 78 COMPLETED SY V. T. C et)
MONTH JANUARY 1978 DAY AVERAGE DAILY POWER .LEVEL DAY AVEBAGE DAILY POWER LEVEL (Mt'-Net) (Kfe-if 18 3 1.9 20 22 23 24 25 10 26.
27 12 28 13 29 14 30 31
OPERATING DATA REPORT DOCKET iVO.,
DATE Feb.A 197B COMPLETED BY ~~iLLLeoe TELEPHONE C~~-3824 OPERATING STATUS Turke Point Unit No. 3 Notes - Unit No. 3'.scheduled I. Unit Name: refueling, maintenance, and
~. Reporting period: Januar 1978 2200 inspections continued.
- 3. Licensed Thermal Power (MWt):
- 4. Namephte Rating (Gross elf We): 760
- 5. Design Electricai Rating (Net LifWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net iaaf We):
- 8. If Changes Occur in Capacity Ratings (Items iVumber 3 Through 7) Since Last Report, Give Reasons:
h
- 9. Power Level To which Restricted, IfAny (iVet MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr:to-Date Cumuh tive Il. Hours In Reporting Period 744.0 744.0 45'225.6
- 12. Number Of Hours Reactor Was Critical 35 225.
'3. Reactor Reserve Shutdown Hours 1
- 14. Hours Generator On-Line 4 .4
- 15. Unit Reserve Shutdown Hours 85.0
- 16. Gross Thermal Energy Generated (MWH) <<0- 66 774
- 17. Gross Electrical Energy Generated'(MWH) . 21 284 345
- 18. Net Electrical Energy Generated (MWH) 2 240
- 19. Unit Service Factor 7 .4
- 20. Unit Availability Factor.
75.6 ZI. Unit Capacity Factor (Using MDC i et) ' 66.9
- 22. Unit Capacity Fahctor (Using DER i let)
- 23. Unit Forced Outage Rate 2. 8'
- 24. Shutdowns Scheduled Over Next 6 Months ( Type, Date, and Duration of Eachl:
Feb. 1'2 1978
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status {Prior to Commercial Operation): Forecast Achieved INITlAL CRITICA'L'ITY INITIALELECTRICITY COMMERCIAL OPERATlON (u/77 )
DOCKET NO.
UNIT SIIUTDOWNS AND POiUER REDUCTIONS REPORT MONTII JANUARY 1978
) I a Licensee
)) Vl Cause & Corrective o 0
)
t) Action to NI). Date m ~Cd Event CJ Eo 0 Prevent Rccurrcnce
~ C/) Rcport rF 28 77-11-23 S 744.0 N/A N/A N/A Unit No. 3 was removed from service for scheduled refueling, maintenance, and inspections. (Continued from previous month) (Nuclear and non-nuclear systems)
I 3 F: I'ofccil Reason: ' Metliod: Exhibit G - Instructions S: Scheduled A-Equipmcnt Failure (Explain) -Manual for Preparation of Data II Maintenance or Test 2.Manual Scrain. Entry Shccts for Licensee C-Rcfucling 3-Automatic Scraiii. Event Report (LER) File (NUREG-D-Regulatory Restriction 4.Other (Explain) OI6)
E-Opcralor Training & Liccnsc Fxamination F-Administrative 5 G.Operational Eiror (Explain) Exhibit I - S~in). Sour<<
I I.Olhcr (Explain)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 251 Turkey Point UNIT Unit No. 4 DATE Feb. 4 1978 CO>PLETED BY V. T. Chilson TELEPHONE 305 552-3824 HOhTH JANUARY 1978 DAY AVERAGE DAILY POWER, LEVEL DAY AVERAGE DAILY POWER L VEL
.(Kfe-Net) (Mle-Net) 671 675 666 18 664 667 19 659 673 20 65'9 5 672 21. 667 662 22 674 670 23 668 8 668 24 660
'6'49 '28 9 25 10 678- 646 683 27 669 12 682 28 674 13 675 29 677 14 675 30 678 15 676 31 675 677 NOTE: Average daily aower greater than 666 MWe due to cooler condenser cooling water.
OPERATING DATA REPORT DOCKET NO. ~0-2 DATE Feb.4 1978 COAIPLETED BY ~~II',eon ZK~~2-3824 TELEPHOiVE OPERATliVG STATUS Turke Point Unit No. 4 Notes Unit No. 4 operated
- l. Unit 4Vame:
at approximately 100/ R p
~. Reporti'ng period: January, 1978 except for outage of Jan. 25,
- 3. Licensed Thermal Power (iiIWt):
1978.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net 4%IWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. 4Maximum Dependable Capacity (Net iBIWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To 1Vhich Restricted, IfAny (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative 744.
- 12. Number Of Hours Reactor Was Critical 734.4 734. 4 ~2
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 732.9
- 15. Unit Reserve Shutdown Hours 16.
A Gross Thermal Energy Generated (i%I WH) 1 601 257
~ ~ '" e"") 489 98.5
- 19. Unit Service Factor
- 20. Unit Avaihbility Factor 98.5 98.5
- 21. Unit Capacity Factor (Using MDC Net) 98.7
~". Unit Capacity Factor (Using DER Net) 94.9
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 I~Ionths (Type, Date, and Duration of Each):
Steam Generator Ins ectio Feb.
1
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved li llTIALCRITICALITY INITIAL ELECTRICITY
251 DOCKET NO. 50 UNIT Sl[UTDOWNS AND POWER REDUCTIONS it .No. 4 REPORT MON fn JANUARY 1978 552- 824 P> Q Cause &, Corrective 0
Licenscc tI(I4 p pC El p
N(>. Date ~ II Event ~ Aclion lo J
Report ((f u) o Eo p Prevent Rccurrcnce
~ (I>
Q o
Cl 78-01-25 11.1 B 1 N/A N/A N/A Unit No. 4 was removed from service
'to perform integrated safeguards surveillance test. (Nuclear system) 4 F: Forced Reason: Method: Exhibit G - Instruclions S: Scheduled A-E(luipment Failure (Explain) I-Manual for Preparation ol Data B.Maintenance or Test 2.Manual Scram. Fnlry Sheets for Licensee C-Retueling 3-Aulon>atic Scram. Evcnl Report (LER) File INUREG.
D-Regulatory Restriction 4.Other (Explain) 0 I6 I )
E.Operalor Training &, Liccnsc Examination F-Administrative G.Opcralional Error (Explain) Exhibit I - Sa>nc Source
((I/77) I I-Olhcr (Explain)
AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.
St. Lucie UNIT Unit No. 1 DATE Feb. 4, 1978 COa~PLETED BY V. T. Chilson TELEPHONE (305) 552-3824 MONTH JANUARY, 1978 DAY AVERAGE DAILY POWER,LEVEL DAY AVERAGE DAILY POWER LEVEL
(%Le-Net) (M!le-Net) 800 761 801 18 760 783 19 790 771 20 791 727 21 791 "6 661 22 707 752 23 799 24 798 25 84 10 799 26 756 793 27 762 12 801 28 667 13 618 29 172 788 30 494 698 31 471
,16 685 NOTE: Average daily power greater than 777 EÃe due to cooler condenser cooling water.
OPERATING DATA REPORT DOCKET NO.. 50-335 DATE Zeh.~~978 CD'liPLETED BY ~Y.. Chi son TELEPHONE ~0 ~2-3824 OPERATliVG STATUS St. Lucie Unit No. 1 Unit No. 1 operated January 1978 at approximately 100X R.P.
- g. Reporti'ng period: for 2560 except outages of Jan;13
- 3. Licensed Thermal Power (MWt):
850 23, 28, 29- and 31, 1978.
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
802
- 6. Maximum Dependable Capacity (Gross MWe): 822
- 7. Maximum Dependable Capacity (Net L~IWe): 777
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any.(Net MWe): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr:to-Date Cumulative
- 11. Hours In Reporting Period 744.0 667.
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 653.4 8
- 15. Unit Reserve Shutdown pours
'6. Gross Thermal Energy Generated (MWH) 1 569 897
.
- 17. Gross Electrical Energy Generated (MWH) '513 ~70
- 18. Net Electrical Energy Generated (MWH) 483 157
- 19. Unit Service Factor 87.8
- 20. Unit Availability Factor Sss .
- 21. Unit Capacity Factor (Using MDC Net) 83 6
- 22. Unit Capacity Factor (Using-DER Net) 81.0.
- 23. Unit Forced Outage Rate 4.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Each):
Refuelin maintenance and. ins I
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COLilMERCIALOPERATION
DOCKET NO.
UNIT SIIUTDOWNS AND POWER REDUCTIONS DATF Feb. 4 1978 COMPLETED BY REPORT MONTII JANUARY 1978 Pa e 1 of 3 fP~
C er c '> Liccnsec
~w P Cause Er. Corrective
~I 5 Q p 0D Dale 0 j Event Q Action lo
)a I- Cl
¹ E~ Prevent Recurrence
~M Report 0 CJ
~
78-01-13 .3. 7 A 3 N/A RB CRDRVE Unit was tripped by reactor protectio system caused by rapid insertion of a CEA. Corrective actions included im-provements to CEA power supply system.
(Nuclear system) 78-01-23 S 57.3 N/A CB VESSEL Unit was removed from service to re-place failed gasket on pressurizer manway closure. (Nuclear system) 78-01-28 9.0 N/A INSTRU Unit 'was tripped by actuation 'of loss (c) of field relay caused by intermittent.
-loss of power supply to generator voltage regulator. (Non-nuclear
.system) 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A.Equipmcnt Failure (Explain) '.Manual for Preparation ol'ata B.hlaintcnance or Test 2.hIaoual Scram. Entry Sheets for Ltceoscc C.Refueling 3-Autotoatic Sera>o. Event Report (LER) File (NURLG-D.Rcgul at ory Rest riel ion 4.Other (Explain) OI6l )
I'. Operator Training h License Exatoinalion F-Administrative G Operational Error (Explaitt) Exhibit I - Satnc Source
('t/77) I I-Other (Explain)
DOCKET NO.
UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAME St. I.ticie Unit No. 1 DATE Feb. 4 1978 COMPLETED IIY V. T. Chilson REPORT MON fII JANUARY, 1978 TELEPlIONE Page 2 of 3 ftj P i a Q Licenscc EI Cause &, Currcclivc o'-" u 0 Nii. Date Event Action to Rcport ¹ Eo 0 Prcvcnt Rccurrcnce
~ch g V 4 78-01-29 0.3 N/A zzz Unit was tripped by steam generator level protection system due to a tran ient condition while increasing load after the unit was returned to servic (Non-nuclear system) 78-01-29 7. 2 N/A HA INSTRU Unit was tripped by actuation of loss (c) of field relay caused by intermittent loss of power supply to generator voltage regulator. (Non-nuclear system) 78-01-29 7.7 A 3 N/A INSTRU Unit was tripped by actuation of loss (c) of field relay caused by intermittent loss of power supply to generator voltage regulator (Non-nuclear system)
I .3 F: Forced Reason: ' Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) -Manual for Preparation oi'Data II-Maintenance or Test 2-Manual Scram. Entry Sl>ccts for Licensee C-Refueling 3-Auloioatic Scratn. Event Rcport (LER) File (NUREG-D Regulatory Rcstrtclion 4.Other (Explain) Ol 6 I )
E.Operator Training &. Liccosc Exatoioatlon 'I F-Administrative 5 G.Operational Error (Explain) Exhibit I - Sante Source I')/77) II Otltcr (Explain)
~ ~
4 DOCKET NO.
UNIT SIIUTDOWNS AND POSER REDUCTIONS UNIT NAME St ~ Lucie Unit No, 1 COMI'LETED DY. V. T Chilson REPORT MONTII JANUARY 1978 Page 3 of 3 r4 A J Licensee
~J Cause 84 Corrcctivc O O 0 4J Q O Action to No. Date ~ A m os Event
¹ Eu
~Q ~
Q Prevent Rccurrcnce U) Rcport O Q
78-01-31 5.4 A N/A INSTRU Unit was tripped by actuation of loss (c) of field relay caused by intermittent loss of power supply to generator voltage regulator. Corrective actions included locating and repair-ing intermittent high resistence connections in voltage regula'tor power supply system. (Non-nuclear system) 3 F: Forced Reason: Method: Exhibit G - Instructions S: Schcllulcd A.E4luipmcnt Failure (Explain) I -hlanual for Prcparatton of Data II.Maintenance or Test 2.Manual Scram. Entry Shccts lor Liccnsec C Rci uclhlg 3-Autolnatic Scratn. Event Report (LER) File (NURI!G-D-Regulatory Restriction 4-Other (Explaul) 016I )
E-Operator Training h. Liecnsc Exatnination I'-Administrative 5 G.Operational Error (Explain) Exhibit I - Salne Source
('t/77) I I Other (Explahl)
h C