Submits Addl Responses to IE Bulletin 79-06B.Addl Necessary Actions Required to Ensure Timely Initiation of Auxiliary Feedwater Operator Have Been Completed
ML19246A724
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/29/1979
From: Counsil W
NORTHEAST UTILITIES
To: Reid R
Office of Nuclear Reactor Regulation
References
IEB-79-06B, IEB-79-6B, TAC-30199, NUDOCS 7907060282
Download: ML19246A724 (2)


Text

,

-

li10Irl'HI!JtfiT UTEI.lTil!!i P o BOX 270

) HARTF ORD CONNECTICUT 06101 (203) U6C.911 L L lJ June 29,1979 Docket No . 50-336 Director of Nuclear Reactor Regulation Attn: Mr. R. Reid, Chief Operating Reactors Branch #4 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

References:

(1) R. Reid letter to W. G. Counsil dated .Iune 7,1979.

(2) W. G. Counsil letter to R. Reid dated April 24, 1979.

(3) W. G. Counsil letter to R. Reid dated bhy 24, 1979.

(4) W. G. Counsil letter to R. Reid dated bby 31, 1979.

Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Auxiliary Feedwater Operator In Reference (1), the NRC Staf f documented its evaluation of the responses to the concerns of I&E Bulletin 79-06B provided by Northeast Nuclear Energy Company (NNECO) by References (2), (3), and (4 ) . Reference (4), in particular, summarized NNECO's proposal with respect to ensuring timely initiation of auxiliary feedwater as required.

This proposal was amended by the evaluation documented in Item (4) of Ref erence (1), wherein it was stated that :

"NNECO further committed to document that the operator assigned to this function will at the time of a transient requiring such action take immediate control of the main and auxiliary feedwatet systems, with no other concurrent responsibilities, until the steam generator levels return to a stable condition."

In fulfillment of that commitment , please be advised that the existing applicable emergency procedures specify that the above-quoted actions be taken. NNECO continues to believe that all necessary actions required to ensure timely initia-tion of f eedwater have been completed.

300 086 7 907 0 6 0;1t;>

o g .'

We trust yott find that the above information fulfills the Reference (1) commit-ment.

Very truly yours, NORT!! EAST NUCLEAR ENERGY. COMPANY

  • l

.. i

'

/h,/ . .h (f')lv c

'

W. G. Counsil Vice President

,

300 007 V /