ML19253C998

From kanterella
Revision as of 21:27, 18 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Final Deficiency Rept on Discrepancy in Drawings Re Design Calculation Concrete Reinforcement Requirements for Control & Diesel Generator Bldgs
ML19253C998
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 12/06/1979
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19253C999 List:
References
SBN-107, NUDOCS 7912120486
Download: ML19253C998 (1)


Text

e D U PUBLIC SERVICE Companyof NewHampshir e SEABROOK STATION Engineering Offico:

20 Turnpiko Road Westborough, MA 01581 December 6, 1979 SBN-107 T.F. Q 2.2.2 U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement

Reference:

1. Docket No. 50-443 and 50-444
2. Telecon of 11/ 6/79 between J. Mattia NRC and John DeVincentis YAEC

Subject:

10 CFR 50.55 (e) Report on Discrepancy in Drawings with Respect to Design Calculation Concrete Reinforcement Requirements for the Control and Diesel Generator Buildings

Dear Sir:

The enclosed report is submitted in accordance with the requirements of 10 CFR 50.55 (e). This deficiency was reported to the Region I Inspection and Enforcement office, by telephone, on 11/ 6/79.

Very truly yours,

. .

,, 4 AwJv(2 John DeVincentis Project Manager JDV:tla Enclosure cc: Director of Inspection & Enforcement .

U.S. NRC, Washington, D.C.

41 09A 80/9 SE 7912120k[b3 ///