From: | Correa C MARSH & MCLENNAN, INC. |
To: | Saltzman J Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8001290347 | |
Download: ML19257C530 (2) | |
Similar Documents at Davis Besse, 05000541 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P2061999-10-26026 October 1999
[Table view]Forwards for First Energy Nuclear Operating Co Insp Rept 50-346/99-17 on 990928-1001.Insp Was Exam of Activities Conducted Under License Re Implementation of Physical Security Program.No Violations Identified ML20217N3851999-10-20020 October 1999 Forwards RAI Re Licensee 990521 Request for License Amend to Allow Irradiated Fuel to Be Stored in Cask Pit at Davis-Besse,Unit 1.Response Requested within 60 Days from Receipt of Ltr ML20217N2321999-10-15015 October 1999 Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program ML20217G9201999-10-14014 October 1999 Discusses Utils Request for Approval of Quality Assurance Program Changes PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20217F8371999-10-0808 October 1999 Forwards Insp Rept 50-346/99-10 on 990802-0913.One Violation Occurred Being Treated as NCV ML20212L0691999-09-30030 September 1999 Forwards,For Review & Comment,Copy of Preliminary ASP Analysis of Operational Condition Discovered at Unit 1 on 981014,as Reported in LER 346/98-011 ML20217A5641999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Davis-Besse on 990901.Informs That NRC Plans to Conduct Addl Insps to Address Questions Raised by Issues Re Operator Errors & Failure to Commit to JOG Topical Rept on MOV Verification ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls ML20212D3501999-09-21021 September 1999 Forward Copy of Final Accident Sequence Precursor Analysis of Operational Event at Plant,Unit 1 on 980624,reported in LER 346/98-006 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211P3001999-09-0707 September 1999 Forwards FEMA Transmitting FEMA Evaluation Rept for 990504 Emergency Preparedness Exercise at Davis-Besse Nuclear Power Plant.No Deficiencies Identified.One Area Requiring C/A & Two Planning Issues Identified ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211K0951999-08-30030 August 1999 Forwards Request for Addl Info Re Fire & Seismic Analyses of IPEEE for Davis-Besse Nuclear Power Station,Unit 1. Response Requested within 60 Days ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates ML20211D1171999-08-20020 August 1999 Forwards Insp Rept 50-346/99-09 on 990623-0802.Violations Identified & Being Treated as Noncited Violations PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20211B0161999-08-13013 August 1999 Forwards SE Accepting Evaluation of Second 10-year Interval Inservice Insp Program Request for Relief Numbers RR-A16, RR-A17 & RR-B9 for Plant,Unit 1 ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps ML20210P8051999-08-0909 August 1999 Forwards Insp Rept 50-346/99-15 on 990712-16.No Violations Noted.However,Several Deficiencies Were Identified with Implementation of Remp,Which Collectively Indicated Need for Improved Oversight of Program 05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl1999-08-0606 August 1999 Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl IR 05000346/19980211999-08-0606 August 1999 Refers to NRC Insp Rept 50-346/98-21 Conducted on 980901- 990513 & Forwards Nov.Two Violations Identified Involving Failure to Maintain Design of Valve & Inadequate C/A for Degraded Condition Cited in Encl NOV ML20210H6101999-07-30030 July 1999 Informs That Region III Received Rev 21 to Various Portions of Davis-Besse Nuclear Power Station Emergency Plan.Revision Was Submitted Under Provisions of 10CFR50.54(q) in Apr 1999 ML20210H0491999-07-28028 July 1999 Forwards Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, to Allow Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G5521999-07-28028 July 1999 Provides Addl Response to 980923 OL Licensing Exam Rept 50-346/98-301 Re OL Exam Administered in Aug 1998.Results of Root Cause Investigation & Corrective Actions,Discussed ML20210G3831999-07-27027 July 1999 Forwards Application for Amend to NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20211P3071999-07-26026 July 1999 Forwards Final Rept for 990504 Biennial Radiological Emergency Preparedness Exercise for David-Besse Power Station.No Deficiencies Identified for Any Jurisdiction During Exercise ML20210G3211999-07-26026 July 1999 Forwards Written OL Exam & Supporting Matl for Exam to Be Administered at DBNPS During Week of 990913.Listed Encls Withheld from Public Disclosure Until After Exam Complete ML20210G7151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrument - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G4391999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumentation, & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20210C4381999-07-20020 July 1999 Forwards Insp Rept 50-346/99-08 on 990513-0622.Unidentified RCS Leak Approached TS Limit of 1 Gallon Per Minute Prior to Recently Completed Maint Outage.Three Violations of NRC Requirements Identified & Being Treated as NCVs ML20209G3681999-07-15015 July 1999 Advises That Info Submitted in & 990519 Affidavit Re Design & Licensing Rept,Davis-Besse,Unit 1 Cask Pit Rack Installation Project,Holtec Intl, HI-981933,marked Proprietary,Will Be Withheld from Public Disclosure ML20207H6401999-07-0909 July 1999 Discusses Closure of TAC MA0540 Re Util Responses to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Staff Has Revised Info in Rvid & Releasing It as Rvid Version 2 ML20209D1341999-07-0808 July 1999 Forwards Notice of Withdrawal of Application for Amend to Operating License.Proposed Change Would Have Modified Facility TSs Pertaining to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves 05000346/LER-1998-012, Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached1999-07-0707 July 1999 Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached ML20209C3981999-07-0101 July 1999 Responds to NRC Re Violations Noted in Insp Rept 50-346/98-21.Corrective Actions:Developed Rev to Boric Acid Control Program & Work Process Guideline on Plant Leakage ML20209B5821999-06-24024 June 1999 Provides Justification for Rev to Completion Date for One of Insp follow-up Items Cited in Insp Rept 50-346/98-03, Designated as Inspector follow-up Item 50-346/97-201-10 ML20196G1251999-06-23023 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196E5321999-06-17017 June 1999 Forwards Addl Info Re Relief Request RR-A16 to Support NRC Approval of Relief Request ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 ML20195K2751999-06-16016 June 1999 Forwards Safety Evaluation Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20195F9071999-06-10010 June 1999 Forwards Application for Amend to NPF-3,changing Tech Specs 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20195F8851999-06-0707 June 1999 Withdraws 950929 License Amend Application,Proposing Mod to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20207G0751999-06-0707 June 1999 Forwards Insp Rept 50-346/99-04 on 990323-0513.Violations Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARML20217N2321999-10-15015 October 1999
[Table view]Requests NRC Approval to Use Alternative to Requirements of 10CFR50.55a(f)(4)(ii).Licensee Requests Extension to Specified Schedule for Implementing Updates to IST Program PY-CEI-NRR-2438, Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl1999-10-14014 October 1999 Informs That DBNPS & Pnpp Staffs Have Modified or Withdrawn Several of Positions Proposed within Re Request for Approval of Qap.Revised Positions Encl ML20216J6701999-09-24024 September 1999 Forwards Post Examination Documentation for Written Operator Initial License Examination Administered at Davis-Besse Nuclear Power Station on 990920.Without Encls 05000346/LER-1998-001, Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached1999-09-0909 September 1999 Forwards Rev 1 for LER 1998-001,which Updates Corrective Actions & Revises Completion Date Re Implementation of Changes to Plant Emergency Operating Procedure.List of Commitments Attached ML20216E5961999-09-0707 September 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1,safety Features Actuation Sys Instrumentation & Associated Bases 3/4.3.1 & 3/4.3.2,reactor Protection Sys & Safety Sys Instrumentation ML20211K6611999-08-30030 August 1999 Forwards Copies of Operator License Renewal Applications for Individuals Listed.Operators Have Successfully Completed Appropriate Operator Requalification Training Program at Dbnps.Without Encls ML20211K6681999-08-30030 August 1999 Forwards Copies of Certified Personal Qualification Statement - Licensee (NRC Form 398) for Operator Candidates Listed Below.Without Encls ML20211H0201999-08-25025 August 1999 Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d) ML20211G3911999-08-20020 August 1999 Forwards Update to Estimated Info for Licensing Action Requests Through 010930,re Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates PY-CEI-NRR-2411, Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl1999-08-19019 August 1999 Informs That Firstenergy Nuclear Operating Co Has Developed Corporate QA Program Manual for Davis-Besse Nuclear Power Station & Perry Nuclear Power Plant,As Discussed on 990318 Between Util & Nrc.Revised USAR Pages,Encl ML20211J9201999-08-13013 August 1999 Urges NRC to Find Funds for Stockpiling Radiation Pills for Residents Living Near Plant ML20210T1061999-08-12012 August 1999 Forwards Preliminary NRC Forms 398 & 396 for Listed Candidates,Per Operator License Exam Scheduled for Week of 990913.Encl Withheld ML20210S6071999-08-11011 August 1999 Provides Final Response to NRC RAI Re GL 98-01, Y2K Readiness of Computer Systems at Npps 05000346/LER-1998-009, Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl1999-08-0606 August 1999 Forwards LER 98-009-01,IAW 10CFR50.73(a)(2)(ii)(B). Commitments Made by Util Are Encl ML20210G5521999-07-28028 July 1999 Provides Addl Response to 980923 OL Licensing Exam Rept 50-346/98-301 Re OL Exam Administered in Aug 1998.Results of Root Cause Investigation & Corrective Actions,Discussed ML20210H0491999-07-28028 July 1999 Forwards Application for Amend to License NPF-3,revising TS 3/4.7.5.1, Ultimate Heat Sink, to Allow Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G3831999-07-27027 July 1999 Forwards Application for Amend to NPF-3,changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G3211999-07-26026 July 1999 Forwards Written OL Exam & Supporting Matl for Exam to Be Administered at DBNPS During Week of 990913.Listed Encls Withheld from Public Disclosure Until After Exam Complete ML20210G4391999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs 3/4.3.2.1, Safety Features Actuation Sys Instrumentation, & Associated Bases 3/4.3.1 & 3/4.3.2, Reactor Protection Sys & Safety Sys Instrumentation ML20210G5151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising Tech Specs for Implementation of 10CFR50,App J,Option B for Type B & C Containment Leakage Rate Testing ML20210G7151999-07-26026 July 1999 Forwards Application for Amend to License NPF-3,revising TSs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrument - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20211P3071999-07-26026 July 1999 Forwards Final Rept for 990504 Biennial Radiological Emergency Preparedness Exercise for David-Besse Power Station.No Deficiencies Identified for Any Jurisdiction During Exercise 05000346/LER-1998-012, Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached1999-07-0707 July 1999 Forwards LER 98-012-01,which Is Being Submitted to Provide Addl Info Re 981018 Occurrence.Commitment List Attached ML20209C3981999-07-0101 July 1999 Responds to NRC Re Violations Noted in Insp Rept 50-346/98-21.Corrective Actions:Developed Rev to Boric Acid Control Program & Work Process Guideline on Plant Leakage ML20209B5821999-06-24024 June 1999 Provides Justification for Rev to Completion Date for One of Insp follow-up Items Cited in Insp Rept 50-346/98-03, Designated as Inspector follow-up Item 50-346/97-201-10 ML20196G1251999-06-23023 June 1999 Responds to NRC RAI Re GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196E5321999-06-17017 June 1999 Forwards Addl Info Re Relief Request RR-A16 to Support NRC Approval of Relief Request ML20196A6601999-06-16016 June 1999 Forwards Master Decommissioning Trust Agreements Revised After 1990 for Ohio Edison Co,Cleveland Electric Illuminating Co,Toledo Edison Co & Pennsylvania Power Co Re Bvnps,Units 1 & 2,DBNPS,Unit 1 & Perry Unit 1 ML20195F9071999-06-10010 June 1999 Forwards Application for Amend to NPF-3,changing Tech Specs 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.7.6.1, Crevs ML20195F8851999-06-0707 June 1999 Withdraws 950929 License Amend Application,Proposing Mod to Allowable as-found Pressure Lift Setting Tolerance of Two Pressurizer Code Safety Valves ML20207F4231999-06-0202 June 1999 Forwards Rev 1 to DBNPS Emergency Preparedness Evaluated Exercise Manual 990504, IAW 10CFR50.4.NRC Evaluated Exercise Has Been Rescheduled for 991208,since NRC Did Not Evaluate 990504 Exercise ML20207E9561999-05-28028 May 1999 Forwards Update to NRC AL 98-03,re Estimated Info for Licensing Activities Through Sept 30,2000 ML20207E2521999-05-28028 May 1999 Forwards Rev 18,App A,Change 1 to Davis-Besse Nuclear Power Station,Unit 1,industrial Security Plan IAW Provisions of 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20207E7801999-05-21021 May 1999 Forwards Application for Amend to License NPF-3,allowing Use of Expanded Spent Fuel Storage Capacity.Proprietary & non- Proprietary Version of Rev 2 to HI-981933 Re Cask Pit Rack Installation Project,Encl.Proprietary Info Withheld ML20206N0231999-05-0606 May 1999 Forwards License Renewal Applications for Davis-Besse Nuclear Power Station,Unit 1 for ML Klein,Cn Steenbergen & CS Strumsky.Without Encls ML20206D2421999-04-28028 April 1999 Forwards Combined Annual Radiological Environ Operating Rept & Radiological Effluent Release Rept for 1998. Rev 11, Change 1 to ODCM & 1998 Radiological Environ Monitoring Program Sample Analysis Results Also Encl PY-CEI-NRR-2382, Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl1999-04-21021 April 1999 Forwards 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for FY98 Also Encl ML20206B8831999-04-17017 April 1999 Forwards 1634 Repts Re Results of Monitoring Provided to Individuals at Davis-Besse Nuclear Power Station During 1998,per 10CFR20.2206.Without Repts ML20205K5641999-04-0707 April 1999 Forwards Response to NRC 980415 RAI Re GL 96-06, Assurance of Equipment Operability & Ci During Design-Basis Accident Conditions. Rept FAI/98-126, Waterhammer Phenomena in Containment Air Cooler Swss, Encl ML20205K3871999-04-0707 April 1999 Forwards Copy of Application of Ceic,Oec,Ppc & Teco to FERC, Proposing to Transfer Jurisdictional Transmission Facilities of Firstenergy Operating Companies to American Transmission Sys,Inc.With One Oversize Drawing ML20205J1171999-03-29029 March 1999 Forwards Rev 1 to BAW-2325, Response to RAI Re RPV Integrity, Per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rev Includes Corrected Values in Calculations PY-CEI-NRR-2377, Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1)1999-03-29029 March 1999 Submits Decommissioning Repts for Bvps,Units 1 & 2,Davis- Besse Nuclear Power Station,Unit 1 & Perry Nuclear Power Plant,Unit 1,per 10CFR50.75(f)(1) ML20205F5961999-03-27027 March 1999 Forwards Comments on Preliminary Accident Sequence Percursor (ASP) Analysis of 980624 Operational Event at Dbnps,Unit 1, as Transmitted by NRC Ltr ML20205L2031999-03-26026 March 1999 Submits Correction to Dose History of Tj Chambers.Dose Records During 1980-1997 Were Incorrectly Recorded Using Wrong Social Security Number.Nrc Form 5 Not Encl ML20205D4791999-03-26026 March 1999 Forwards Rept Submitting Results of SG Tube ISI Conducted in Apr 1998.Rept Includes Description of Number & Extent of Tubes Inspected,Location & Percent wall-thickness Penetration for Each Indication of Imperfection ML20205C7371999-03-25025 March 1999 Certifies That Dbnps,Unit 1,plant-referenced Simulator Continues to Meet Requirements of 10CFR55.45(b) for Simulator Facility Consisting Solely of plant-referenced Simulator.Acceptance Test Program & Test Schedule,Encl ML20205E3551999-03-19019 March 1999 Requests That Proposed Changes to TS 6.8.4.d.2 & TS 6.8.4.d.7 Be Withdrawn from LAR Previously Submitted to NRC ML20204J6361999-03-17017 March 1999 Forwards Firstenergy Corp Annual Rept for 1998 & 1999 Internal Cash Flow Projection as Evidence of Util Guarantee of Retrospective Premiums Which May Be Served Against Facilities PY-CEI-NRR-2375, Forwards List That Details Util Insurers,Policy Numbers & Coverage Limits for Two Power Plants,Per Requirements of 10CFR50.54(w)(3) Re Reporting of Property Insurance Coverage1999-03-15015 March 1999 Forwards List That Details Util Insurers,Policy Numbers & Coverage Limits for Two Power Plants,Per Requirements of 10CFR50.54(w)(3) Re Reporting of Property Insurance Coverage ML20204E6821999-03-12012 March 1999 Requests That Listed Changes Be Made to NRC Document Svc List for Davis-Besse Nuclear Power Station,Unit 1 1999-09-09 Category:LEGAL/LAW FIRM TO NRC MONTHYEARML17309A4441990-05-29029 May 1990
[Table view]Forwards Endorsements 142-151 to Nelia Policy NF-170, Endorsements 125-134 to Maelu Policy MF-47,Endorsements 13-14 to Certificates N-14/M-14,Endorsements 74-81 to Nelia Policy NF-236 & Endorsements 61-68 to Maelu Policy MF-92 ML20245D3421989-03-20020 March 1989 Forwards Listed Endorsements,Including Endorsements 14,163, 144,94,75,39 & 31 to Nelia Policies NF-295,NF-100,MAELU Policy MF-29,NELIA Policy NF-182,MAELU Policy MF-61,NELIA Policy NF-281 & Maelu Policy MF-112,respectively ML20206H5581988-10-0404 October 1988 FOIA Request for Documents Re V Gilinsky Concerns About 831005 Plant Site Visit ML20151D8121988-07-15015 July 1988 Forwards Opposition of City of Clyde,Oh to Util Application to Suspend Antitrust Conditions at Facilities,Per 880616 53FR22589 & 53FR22590 ML20148K1111988-03-22022 March 1988 Forwards Listed Endorsements to Listed Policies,Including Endorsement 102 to Maelu Policy MF-26,Endorsement 123 to Nelia Policy NF-76,Endorsement 71 to Maelu Policy MF-56 & Endorsement 89 to Nelia Policy NF-189 ML20236A0041987-10-13013 October 1987 Forwards Usc Comment on Proposed Rule 10CFR50 Re Proposed Rev of Backfitting Process for Power Reactors ML20215F5731987-06-11011 June 1987 Forwards Endorsements 61 & 48 to Nelia & Maelu Policies NF-236 & MF-92,respectively ML20206D5351987-03-31031 March 1987 Forwards Endorsement 60 to Nelia Policy NF-236 & Endorsement 47 to Maelu Policy MF-92 ML20207T2701987-03-0909 March 1987 Forwards Endorsement 59 to Nelia Policy NF-236 ML20210F5891987-01-19019 January 1987 Forwards Endorsement 58 to Nelia Policy NF-236,Endorsement 46 to Maelu Policy MF-92 & Endorsement 7 to Nelia & Maelu Certificates N-61 & M-61 ML20214R1811986-09-19019 September 1986 Forwards Preliminary Project Plan Conceptual Design Disposal of Very Low Level Radwaste at Davis-Besse Site, Per Request.Plan Cannot Be Finalized Until State of Oh EPA Issues Permit to Install.W/Svc List.Related Correspondence ML20206S2701986-09-17017 September 1986 Notifies of Address Change Effective on 860927.Requests Address on Encl List of Dockets Be Changed ML20214L4731986-09-0808 September 1986 Informs That Licensee Filing Motion for Transcript Corrections,Including Incorporating Resumes of Witness Into Record.W/O Encl Resumes.W/Svc List.Related Correspondence ML20214M7281986-09-0808 September 1986 Forwards Ibm Formatted Floppy Disk Re Licensee Proposed Findings of Fact & Conclusions of Law in Form of 860908 Initial Decision.W/O Encl.Svc List Encl.Related Correspondence ML20207F6041986-07-19019 July 1986 Forwards Licensee Testimony on Burial of Very Low Level Waste at Davis-Besse.W/Certificate of Svc.Related Correspondence ML20211D7101986-06-11011 June 1986 Requests That Current Schedule for Submission of Testimony & Evidentiary Hearings Be Suspended Until Intl Brotherhood of Electrical Workers Strike Resolution.Util Will Not Conduct Onsite Waste Burial Prior to Decision.W/Svc List ML20211B9111986-06-0404 June 1986 Forwards Endorsement 44 to Maelu Policy MF-92 ML20211C7501986-05-19019 May 1986 Forwards Endorsements 56 & 57 to Nelia Policy NF-236 & Endorsement 45 to Maelu Policy MF-92 ML20203P9011986-05-0505 May 1986 Informs of Author Employment from June 1982 to Oct 1983 as Law Clerk W/Aslb,Per 10CFR0.735-27.Employment Unrelated to Facility Waste Disposal.Author Participation in Proceeding Complies W/Listed Codes.W/Svc List.Related Correspondence ML20203Q2991986-05-0505 May 1986 Advises That Per Encl Sec 860429 Order,Cleveland Electric Illuminating Co & Toledo Edison Co Now Subsidiaries of Centerior Energy Corp.Utils Will Continue as Electric Companies & as NRC Licensees & CP Holders ML20203N1721986-04-30030 April 1986 Responds to Ohio Radioactive Matl Users Group (Ormug) Request for Participation in Low Level Waste Disposal Proceeding.Licensee Has No Objection to Ormug Making Limited Appearance Statement ML20210N4601986-04-29029 April 1986 Advises That Municipalities Ltrs to NRC Forwarding Resolutions Re Burial of Low Level Radwaste at Facility Should Be Treated as Limited Appearance Statements,Not Requests to Intervene ML20210N7201986-04-29029 April 1986 Notifies That Util Has No Objections to Treating Hl Waldorf as Limited Appearance Statement Only.Ltr Does Not Meet Requirements for Participation as Party to Proceeding ML20210N7751986-04-29029 April 1986 Informs of Receipt of League of Women Voters of Rocky River 860410 Statement.No Objection Raised to Treatment.Submittal as Limited Appearance Statement.Opposes Treatment as Petition to Intervene ML20203N1201986-04-29029 April 1986 Advises That Undated Resolution from Greater Cleveland Boating Assoc Re Burial of Low Level Radwaste at Facility Should Be Treated as Limited Appearance Statement,Not Leave to Intervene ML20210K7421986-04-25025 April 1986 Requests That Councilman Kay 860210 Intervening Statement Be Treated as Limited Appearance Statement.Requirements to Become Intervening Party Not Met.Mayfield Heights,Oh,Too Far to Confer Standing.Related Correspondence ML20210L3651986-04-25025 April 1986 Requests That Congressman Feighan 860414 Petition to Participate in Proceeding Be Treated as Limited Appearance Statement & Not as Petition to Intervene Per 10CFR2.714(d). Related Correspondence ML20210L3791986-04-25025 April 1986 Requests That Councilwoman J Klein Intervening Statement Re Resolution 86-10 Be Treated as Limited Appearance Statement. J Klein Has Not Met Requirements to Become Intervening Party.Resolution Deficient in Citations & Supporting Data ML20141J2931986-04-23023 April 1986 Requests That Lj Lucas Re Burial of Very Low Level Radwaste Be Treated as Limited Appearance Statement ML20141J2961986-04-23023 April 1986 Requests That League of Ohio Sportsmen Forwarding Resolution Addressing Burial of Very Low Level Radwaste Be Treated as Limited Appearance Statement ML20141J3521986-04-23023 April 1986 Advises That Encl TC Brown W/Resolution Passed by City of Lakewood,Oh on 860106 Should Be Treated as Limited Appearance Statement & Not as Official Notice of TC Brown Intent to Become Party to Hearing.W/O Encl ML20203D7401986-04-18018 April 1986 Raises No Objection to Treating RM Bimber Presenting Views on Burial of Very Low Level Radwaste,As Limited Appearance Statement.Bimber Fails Requirements to Be Party to Proceeding ML20210L2911986-03-18018 March 1986 Forwards Endorsement 55 to Nelia Policy NF-236 & Endorsement 43 to Maelu Policy MF-92 ML20138A8631986-03-17017 March 1986 Forwards Listed Documents in Response to 860310 Memorandum & Order (Notice of Informal Hearing & Opportunity to Become Party) Re Util Request to Dispose of Low Level Radioactively Contaminated Matls at Plant Site.W/O Encls ML20137U6861986-02-13013 February 1986 Forwards Amend 5 to Form U-1,recently Filed W/Securities & Exchange Commission,Providing Addl Info Re Proposed Affiliation Between Utils.W/Certificate of Svc ML20137N9701986-01-31031 January 1986 Forwards Amends 3 & 4 to Form U-1,recently Filed W/ Securities & Exchange Commission,To Provide Addl Info Re Proposed Affiliation Between Utils ML20136J0891986-01-0808 January 1986 Forwards Amend 2 to Sec Form U-1,providing Addl Info Re Proposed Affiliation Between Cleveland Electric Illuminating Co & Toledo Edison Co ML20136D0441985-12-23023 December 1985 Forwards Endorsements 6 & 54 to Nelia Policies N-61 & NF-236 & Endorsements 6 & 42 to Maelu Policies M-61 & MF-92, Respectively ML20205H2241985-11-13013 November 1985 Forwards Amend 1 to Form U-1 Recently Filed W/Securities & Exchange Commission to Provide Addl Info & Exhibits Re Proposed Affiliation Between Utils ML20134D2601985-08-14014 August 1985 Forwards 850805 Application & 850808 Registration Statement Filed W/Securities & Exchange Commission Re Proposed Affiliation Between Cleveland Electric Illuminating Co & Toledo Edison Co.Utils Will Be Subsidiaries of Holding Firm ML20117N2971985-05-10010 May 1985 Forwards Endorsements 53 & 41 to Nelia Policy NF-236 & Maelu Policy MF-92,respectively ML20113D1551985-04-0505 April 1985 Forwards Endorsement 51 to Nelia Policy NF-236 ML20100M0451985-04-0303 April 1985 Forwards Endorsement 40 to Maelu Policy MF-92 & Endorsement 52 to Nelia Policy NF-236 ML20101F9451984-12-21021 December 1984 Forwards Endorsement 50 to Nelia Policy NF-236,Endorsement 39 to Maelu Policy M-92 & Endorsement 5 to Nelia Certificate N-01 & Maelu Certificate M-61 ML20084K3971984-05-0707 May 1984 Forwards Endorsement 49 to Nelia Policy NF-236 & Endorsement 38 to Maelu Policy MF-92 ML20079R1631984-01-26026 January 1984 Forwards Endorsements 37 & 47 to Maelu Policy ME-92 & Nelia Policy NF-236,respectively ML20083G4681983-12-23023 December 1983 Forwards Endorsements 45-46 & 35-36 to Nelia & Maelu Policies NF-236 & MF-92,respectively.Also Forwards Endorsement 4 to Nelia Certificate N-61 & Maelu Certificate M-61 ML20074A8151983-05-0202 May 1983 Forwards Endorsement 44 to Nelia Policy NF-236 & Endorsement 34 to Maelu Policy MF-92 ML20073H0171983-04-0707 April 1983 Forwards Endorsement 43 to Nelia Policy NF-236 ML20064G0361983-01-0303 January 1983 Forwards Endorsement 42 to Nelia Policy NF-236 & Endorsement 33 to Maelu Policy MF-33 1990-05-29 |
Text
.
1221 Avenue of the Amencas
- Telephone 212 997-5774 January 23, 1980 Mr. Jerom Saltznnn Chief Office of Antitrust & Indamity Nuclear Ibactor Regulation Nuclear Regulatory Camission Washington, D.C. 20555
'
. ~ . :M&M Nuclear Consultants .
'-
. .l .
-
c . - .
.
J, Toledo Edison Cmpany ANI Pol. No. E-236 1980 Advance Premium
Dear Mr. Saltzman:
On behalf of 'lbledo Edison Capany, enclosed are eight certified copies of endorssent no. 30 to the above captioned policy.
Sincerely yours, Constance Correa CC cc: R. M: Lane R. Lloyd R. Ertle 1829147
\h*s\,\
-
80012 0 0 y
]
A technical service of Marsh & McLennan, incorporated
.
Nuclear Energy Liability Insurance NUCLEAR ENERGY LIABILITY INSURANCE ASSOCIATION ADVANCE PREMIUM AND STANDARD PREMIUM CALENDAR YEAR 1980 ENCORSEMENT
- 1. ADVANCE PREMIUM: It is agreed that the Advance Premium due the companies for the period designated above is:
$ 307,461.88 ,
- 2. STANDARD PREMIUM AND RESERVE PREMIUM: In the absence of a change in the Advance Premium indicated above, it is agreed that, subject to the provisions of the Industry Credit Rating Plan, the Stancard Premium is said Advance Premium and the Reserve Premium is:
$ 231,346.03 .
This is to Jertify :h inic 10 a . ; cup / of the original rndorsement having the endorsement number and being mada part of the Nuclear Energy Liability Policy (Facility Form) aa des-ignated hereon. No Insurance is afforded hereunder.
_
M a
-
'
_
s
-
1
\ ,,l J
182f148 Charles R. Bardes, Vice President-Liability Underwriting American Nuclear Insurers iN's*$*2erN'm'en't January 1, 1980 7 ,,,, , , ,,, c , p,,,cy g, W%
12.01 A.M. Standard Time issued to The Toledo Edison Comoany Date of Issue December 20, 1979 For the su scribing co panies By A
/#~ General Manager
-