ML14155A374

From kanterella
Revision as of 11:48, 21 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
May 22, 2014, Summary of Annual Assessment Meeting with Pacific Gas and Electric Regarding Diablo Canyon Power Plant 2013 Performance
ML14155A374
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/04/2014
From: Webb Patricia Walker
NRC/RGN-IV/DRP/RPB-A
To: Halpin E
Pacific Gas & Electric Co
Walker W
References
Download: ML14155A374 (19)


Text

June 4, 2014 Mr. Edward D. Halpin Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424

SUBJECT:

SUMMARY

OF ANNUAL ASSESSMENT MEETING WITH PACIFIC GAS AND ELECTRIC REGARDING DIABLO CANYON POWER PLANT 2013 PERFORMANCE

Dear Mr. Halpin:

This refers to the public Annual Assessment meeting conducted at the Embassy Suites, San Luis Obispo, California on May 22, 2014, between the NRC and your staff. Approximately 130 members of the public attended and participated in this meeting. During the meeting, Pacific Gas and performance during 2013 at Diablo Canyon Power Plant. Specifically, the NRC staff provided an overview of our inspection activities, findings, and overall performance assessment for the station. Additionally, we provided a status as to the significant actions taken by the NRC to enhance the safety of reactors in the United States based on lessons learned from the 2011 Fukashima accident. During the meeting, you and your staff discussed station performance during 2013, and performance during the Unit 1 outage in the spring 2014. Additionally, your staff discussed training initiatives underway to improve human performance at Diablo Canyon, as well as management of spent fuel and expansion of the onsite dry cask storage facility. Finally during the public comment/question and answer portion of the meeting, over 40 individuals provided their perspectives and asked questions of the NRC and PG&E staffs. While there were a wide range of specific comments and questions posed, several individuals focused on the following topics: Diablo Canyon effluent releases and potential health risks; The use, storage, and dispositioning of high burnup fuel; Spent fuel storage and a national spent fuel repository; Diablo Canyon seismic design basis and compliance with NRC requirements; and Personal accounts regarding the safety culture at Diablo Canyon, and the contributions to the community provided by PG&E employees. UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 The NRC video recorded the meeting, and following processing/close-captioning the recording will be available for public viewing on the NRC web site (http://video.nrc.gov). Copies of the NRC and PG&E presentations from the meeting are included as Enclosures 1 and 2, respectively. and its enclosures will be available electronically for public inspection in the NRC Public document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this matter, we will be pleased to discuss them with you. Sincerely, /RA/ Wayne C. Walker, Branch Chief Project Branch A Division of Reactor Projects Docket Nos.: 05000275, 05000323 License Nos.: DPR-80, DPR-82

Enclosures:

As stated The NRC video recorded the meeting, and following processing/close-captioning the recording will be available for public viewing on the NRC web site (http://video.nrc.gov). Copies of the NRC and PG&E presentations from the meeting are included as Enclosures 1 and 2, respectively. and its enclosures will be available electronically for public inspection in the NRC Public document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this matter, we will be pleased to discuss them with you. Sincerely, /RA/ Wayne C. Walker, Branch Chief Project Branch A Division of Reactor Projects Docket Nos.: 05000275, 05000323 License Nos.: DPR-80, DPR-82

Enclosures:

As stated DISTRIBUTION:See next page DOCUMENT NAME: R:\_Reactors\DC\2014\DC Meeting Summary 05222014.pdf ADAMS ACCESSION NUMBER: SUNSI Review By: WWalker Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RIV/DRP RIV/DRP RIV/DRP NAME RAlexander WWalker KKennedy SIGNATURE /RA/ /RA/ /RA/ DATE 6/4/14 6/4/14 6/4/14 Official Record Copy DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) DRP Deputy Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Thomas.Hipschman@nrc.gov) Resident Inspector (John.Reynoso@nrc.gov) Administrative Assistant (Madeleine.Arel-Davis@nrc.gov) Branch Chief, DRP/A (Wayne.Walker@nrc.gov) Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer, DRP/A (Brian.Cummings@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Peter.Bamford@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV/ETA: OEDO (Joseph.Nick@nrc.gov) ROPreports 1 1Diablo Canyon Power Plant Annual Assessment MeetingNuclear Regulatory Commission -Region IV San Luis Obispo, CAMay 22, 2014 2 Purpose of Today's Meeting*A public forum for discussion of PG&E's performance in 2013*NRC's Plant Performance Assessment*PG&E Response and Remarks 2 3 Agenda*Introduction *Discussion of Plant Performance Results*Licensee Response and Remarks

  • NRC Closing Remarks "Ground Rules"*Speak into a microphone*One person talks at a time
  • Please state your name
  • Minimize background noise-Limit side conversations

-Please silence phones 4

3 5 NRC Representatives*Kriss Kennedy-Director, Division Reactor Projects *Tom Hipschman-Senior Resident Inspector*John Reynoso-Resident Inspector*Christie Hale-Reactor Inspector, Division of Reactor Safety 6 PG&E Introductions Ed Halpin Senior Vice President &

Chief Nuclear Officer PG&E Diablo Canyon Power Plant 4 7 NRC Performance Goals*Safety: Ensure adequate protection of public health and safety and the environment.*Security: Ensure adequate protection in the secure use and management of

radioactive materials.

8 Diablo Canyon Inspection ActivitiesJanuary 1 -December 31, 2013*Completed approximately 7,800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> of inspection, oversight, and

assessment activities*Resident Inspectors onsite daily*Regional Team Inspections-In-depth engineering review-Comprehensive security exercise

6 11*Mitigating Strategies Order-Requires strategies to cope with a long term loss of safety systems*Spent Fuel Pool Instrumentation Order-Requires plants to be able to tell if water is at or above certain levels Diablo Canyon Fukushima Recommendations Status 12*Flooding and Seismic Walkdowns-Verify that the site can meet its current requirements for hazard protection*Flooding and Seismic Hazard Reevaluations-Reevaluate Hazards using present-Day information Diablo Canyon Fukushima Recommendations Status 7 13Licensee Response and Remarks Ed Halpin Senior Vice President &

Chief Nuclear Officer PG&E Diablo Canyon Power Plant 14 NRC Closing Remarks Kriss Kennedy Director, Division of Reactor ProjectsNRC Region IV, Arlington, TX 1 Diablo Canyon Power Plant Ed HalpinSenior Vice PresidentChief Nuclear OfficerMay 22, 2014Purpose -Desired Outcome

  • Share plant performance information that demonstrates the safe operation of DCPP
  • Communicate important initiatives occurring at Diablo Canyon Power Plant
  • Ensure continued transparency and clarity about plant

operations

3DCPP StationPerformance

  • 2013 NRC Inspection Overview
  • Over 7,500 Hours of Inspection
  • Component design basis inspection
  • Force-on-Force
  • Dry cask storage
  • No greater than green findings
  • Excellent Performance In:
  • Safety -No lost time injuries
  • Human performance Unit 1 Outage Performance 2014
  • Actions and Accomplishments:*12,000 outage-related activities *More than 135,000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> of work
  • No lost time injuries
  • End result -safely and reliably executed the refueling of Unit 1 4 Nuclear Safety CultureLynn WalterDirector Station SupportUsing Training to Improve Human PerformanceTraining workers on skills and knowledge alone doesn't always result in error free performanceWe changed our training philosophy to: *Be student centered*Place an emphasis on proficiency
  • Dynamic Learning Activities for practice, practice, practiceSignificantly improved results for human performance 5 Training Enhancements Examples: *Created new course for outage workers*Learn by doing -hands on laboratories with instructors
  • Incorporate practice of human performance error prevention tools *Reinforce workplace expectations and cultural valuesBetter Focus on Employees = Better Employee Results Accredited Training ProgramRequired by NRC to have an accredited training program by Institute of Nuclear Power Operations Accreditation Process
*Rigorous review by independent experts (Operations in 2013)
  • Similar to hospital and university accreditation programs
  • Includes onsite reviews of training material, programs, procedures*Formal independent accreditation review boardDCPP received renewed accreditation for operations training programs early this year