|
---|
Category:Environmental Monitoring Report
MONTHYEARDCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report A000375, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) - 1st Quarter Report 20242024-04-20020 April 2024 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) - 1st Quarter Report 2024 DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring ML24003A7212023-11-27027 November 2023 Independent Safety Committee; Diablo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety July 1, 2022-June 30, 2023 DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 ML23137A1352023-04-18018 April 2023 NPDES Receiving Water Monitoring Program 2022 Annual Report L-23-001, Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report for 20222023-02-18018 February 2023 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report for 2022 DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-032, 2021 Annual Nonradiological Environmental Operating Report2022-04-27027 April 2022 2021 Annual Nonradiological Environmental Operating Report DCL-22-033, Annual Report of Occupational Radiation Exposure for 20212022-04-26026 April 2022 Annual Report of Occupational Radiation Exposure for 2021 DCL-22-025, 2021 Annual Radiological Environmental Operating Report2022-04-21021 April 2022 2021 Annual Radiological Environmental Operating Report DCL-22-017, Submittal of 2021 Annual Radioactive Effluent Release Report2022-04-21021 April 2022 Submittal of 2021 Annual Radioactive Effluent Release Report DCL-21-037, Annual Nonradiological Environmental Operating Report2021-04-28028 April 2021 Annual Nonradiological Environmental Operating Report DCL-2021-514, NPDES Receiving Water Monitoring Program: 2020 Annual Report2021-04-27027 April 2021 NPDES Receiving Water Monitoring Program: 2020 Annual Report DCL-21-022, 2020 Annual Radiological Environmental Operating Report2021-04-0101 April 2021 2020 Annual Radiological Environmental Operating Report L-21-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20202021-03-0101 March 2021 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2020 DCL-20-036, 2019 Annual Non-Radiological Environment Operating Report2020-04-29029 April 2020 2019 Annual Non-Radiological Environment Operating Report DCL-20-010, 2019 Annual Radiological Environmental Operating Report2020-04-16016 April 2020 2019 Annual Radiological Environmental Operating Report L-20-003, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 20192020-03-0202 March 2020 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report for 2019 DCL-2020-509, 2019 Annual Report on Discharge Self-Monitoring2020-02-27027 February 2020 2019 Annual Report on Discharge Self-Monitoring DCL-19-026, Annual Radioactive Effluent Release Report2019-04-23023 April 2019 Annual Radioactive Effluent Release Report DCL-18-028, Submittal of 2017 Annual Radioactive Effluent Release Report2018-04-24024 April 2018 Submittal of 2017 Annual Radioactive Effluent Release Report DCL-17-034, 2016 Annual Non-Radiological Environmental Operating Report2017-04-27027 April 2017 2016 Annual Non-Radiological Environmental Operating Report DCL-17-031, Transmittal of 2016 Annual Radioactive Effluent Release Report2017-04-26026 April 2017 Transmittal of 2016 Annual Radioactive Effluent Release Report ML17128A0242017-04-26026 April 2017 Submittal of 2016 Annual Radiological Environmental Operating Report DCL-17-030, Diablo Canyon Units 1 and 2, Submittal of 2016 Annual Radiological Environmental Operating Report2017-04-26026 April 2017 Diablo Canyon Units 1 and 2, Submittal of 2016 Annual Radiological Environmental Operating Report ML17096A7662017-04-0606 April 2017 Submittal of Mitigating Strategies Assessment for Flooding Report DCL-17-030, 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP)2017-03-29029 March 2017 2016 Annual Quality Assurance Report for the Radiological Environmental Monitoring Program (REMP) DCL-2017-511, Submittal of 2016 Annual Discharge Self-Monitoring Report2017-02-28028 February 2017 Submittal of 2016 Annual Discharge Self-Monitoring Report DCL-2017-501, Diablo Power Plant - 2016 Annual Sea Turtle Report2017-01-27027 January 2017 Diablo Power Plant - 2016 Annual Sea Turtle Report DCL-2017-500, Discharge Monitoring Report for Fourth Quarter 20162017-01-20020 January 2017 Discharge Monitoring Report for Fourth Quarter 2016 DCL-16-113, Corrections to the 2014 and 2015 Annual Radioactive Effluent Release Reports2016-11-0101 November 2016 Corrections to the 2014 and 2015 Annual Radioactive Effluent Release Reports DCL-16-055, Transmittal of 2015 Annual Non-Radiological Environmental Operating Report2016-04-28028 April 2016 Transmittal of 2015 Annual Non-Radiological Environmental Operating Report ML16154A1652016-04-27027 April 2016 Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report L-2016-518, Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report2016-04-27027 April 2016 Diablo Canyon Power Plant, Submittal of Copies of Receiving Water Monitoring Program 2015 Annual Report DCL-16-054, Annual Radioactive Effluent Release Report for 20152016-04-27027 April 2016 Annual Radioactive Effluent Release Report for 2015 DCL-2016-518, NPDES Receiving Water Monitoring Program: 2015 Annual Report2016-04-25025 April 2016 NPDES Receiving Water Monitoring Program: 2015 Annual Report DCL-16-045, Submittal of 2015 Annual Radiological Environmental Operating Report2016-04-21021 April 2016 Submittal of 2015 Annual Radiological Environmental Operating Report DCL-2016-516, Transmittal of 1st Quarter 2016 Report on Discharge Self-Monitoring2016-04-20020 April 2016 Transmittal of 1st Quarter 2016 Report on Discharge Self-Monitoring DCL-15-137, Corrections to the 2014 Annual Radioactive Effluent Release Report2015-12-31031 December 2015 Corrections to the 2014 Annual Radioactive Effluent Release Report 2024-08-28
[Table view] Category:Letter type:DCL
MONTHYEARDCL-24-095, CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20232024-11-0606 November 2024 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2023 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability DCL-24-018, License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR)2024-02-28028 February 2024 License Amendment Request 24-01 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-2024-507, 2023 Annual Report on Discharge Self-Monitoring2024-02-27027 February 2024 2023 Annual Report on Discharge Self-Monitoring DCL-24-020, Nuclear Material Transaction Report for New Fuel2024-02-21021 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-014, Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage2024-02-12012 February 2024 Owners Activity Report for Unit 1 Twenty-Fourth Refueling Outage DCL-24-013, Nuclear Material Transaction Report for New Fuel2024-02-0707 February 2024 Nuclear Material Transaction Report for New Fuel DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-2024-502, 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP)2024-01-25025 January 2024 2023 Annual Sea Turtle Report for Diablo Canyon Power Plant (DCPP) DCL-2024-501, Sea Turtle Stranding Report (Green Sea Turtle)2024-01-24024 January 2024 Sea Turtle Stranding Report (Green Sea Turtle) DCL-2024-500, Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring2024-01-18018 January 2024 Transmittal of the 4th Quarter of 2023 Report on Discharge Self-Monitoring DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) 2024-09-09
[Table view] |
Text
~
Pacific Gas and Electric Company~*
Diablo Canyon Power Plant P. 0. Box 56 Avila Beach, CA 93424 PG&E Letter DCL-2024-527 July 2, 2024 Justin Viezbicke California Stranding Network Coordinator NOAA Fisheries 501 West Ocean Blvd., Suite 4200 Long Beach, California 90802-4213 Electronic Submission E-Mail PDF Formatted File
_justin.viezbicke@noaa.gov Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant Enclosed is NOAA Fisheries West Coast Sea Turtle Stranding Report (Copy) for a sea turtle discovered in the Diablo Canyon Power Plant (DCPP) intake structure. This report was previously provided to NOAA Fisheries by the Local NOAA Stranding Network Organization, The Marine Mammal Center (TMMC) Morro Bay, which managed the specimen following recovery from the power plant intake structure.
On the morning of June 17, 2024, a live sea turtle was discovered by intake operations within the power plaht intake structure 1-4 forebay. The turtle was subsequently identified as a loggerhead sea turtle (Caretta caretta).
As authorized in DCPP's incidental take statement issued September 18, 2006, facility staff removed the turtle from the intake structure forebay later that morning (June 17th) and transferred the turtle to the management and care of TMMC staff at the direction of NMFS. The turtle was removed using a welded metal platform, then transported from the intake structure in a TMMC climate-controlled van. Photographs taken of the recovered turtle are enclosed.
TMMC transferred the turtle to the Aquarium of the Pacific in Long Beach, CA on the evening of June 17th for further examination, assessment, and eventual release. Prior to transfer, TMMC measured the turtle's weight at 23.0 kilograms and shell length (notch-tip) at 62.0 centimeters, and noted the animal appeared to be in average health based on visual observation. There were no apparent abrasions or indication of any injury due to the stranding event. Superficial lesions and inflammatory tissue likely due to barnacle adhesion were noted, and the animal showed evidence of cold stunning ( core body temperature approaching 1 O degrees C). The turtle was transferred to TMMC staff for initial transport to the Morro Bay Care facility and later to the Aquarium of the Pacific. Discovery and disposition of the turtle was reported by TMMC to NOAA Fisheries on June 17, 2024, within the required 48-hour facility reporting period.
Live loggerhead sea turtles have not been discovered at DCPP's intake structure prior to this event. Loggerhead sea turtles are not typically observed in the coastal waters in the vicinity of the power plant.
'l-. t;_f 7
- VI~
PG&E Letter DCL-2024-527 Justin Viezbicke, NOAA Fisheries July 2, 2024 If you have any questions or concerns regarding the enclosed report, or require additional information, please contact Steve Pengilley at (805) 545-3236.
Sincerely, Trevor Rebel Manager, Environmental Protection - Diab/a Canyon Power Plant 2024527/nrh Enclosures (2)
PG&E Letter DCL-2024-527 Justin Viezbicke, NOAA Fisheries July 2, 2024 cc w/enclosures:
Samson Lee NRR Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mahdi Hayes NRC Senior Resident Inspector U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Regional Administrator Licensing Assistant, Operations Branch U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard., Suite 400 Arlington, TX 76011 -4511 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 Marine Region California Department of Fish and Wildlife 20 Lower Ragsdale Dr. Suite 100 Monterey, CA 93940 Robin LeRoux National Marine Fisheries Service
- Southwest Fisheries Science Center 8901 La Jolla Shores Drive La Jolla, CA 92037 James Morris DCPP Manager, Nuclear Regulatory Services
PG&E Letter DCL-2024-501 July 2, 2024 Copy NMFS Stranding Report Loggerhead Sea Turtle (Caretta caretta)
Diablo Canyon Power Plant (DCPP) - June 17, 2024 Report Generated by The Marine Mammal Center (TMMC) Morro Bay
Revised 3/2020 U.S. WEST COAST SEA TURTLE STRANDING REPORT FIELD # TMMC-ST-84 ("Liftoff")
NMFS REGIONAL#
Other#
DATE INITIALLY OBSERVED: 06_ _ 1L 20~_
DATE EXAMINED: _Q6_ j_] _
20~_ RESTRANDER?
Month Day Year Month Day Year IN IT ALLY OBSERVED BY: Ninah Hartley, PGE Diablo Canyon EXAMINED BY: Dr. Heather Harris/Shayla Zink Phone (
)~
_ 545-3326 Email ninah.hartley@pge.com Phone ( )~ _517-5514 Email HarrisH@tmmc.org/ZinkS@tmmc.org D Private citizen Ii] Beach official D Stranding network member Affiliation The Marine Mammal Center SPECIES: D Unidentified LOCATION: Check one option.
D Beached Ii] Floating in water Loggernead sea turtle City Avila Beach County San Luis Obispo State_cA _ _
Common name Locality details (be specific): Diablo Canyon Power Plant Intake Structure Carella caretta Genus Species Digital photos taken: Ii] Yes D No Latitude 35 2110 o N Longitude _-..!,?Q_. ~563 __
0 w Record in decimal degrees.
Verified by: Heather Harris How determined (check one): D GPS Map [j] Internet/software google Maps AGE: (NMFS Use Only)
D Hatchling Ii] Immature SEX: Male D Female Iii Unknown MEASUREMENTS: Whole carcass Partial/ scavenged Adult D Unknown Does tail extend beyond carapace?
Body weight Ii] Actual D Estimate 23.0 kg Yes Ii] No CARAPACE:
CONDITION:
How was sex determined?
Curved Carapace Length (nuchal notch to tip) 62 cm
[j] 1 = Alive 0 Tail length 0 Penis D Necropsy Curved Carapace Width (at widest point) 59.5 cm D 2 = Fresh dead Straight Carapace Length Ii] Calipers D Tape ss.5 cm D 3 = Moderate decomposition BODY CONDITION:
Straight Carapace Width Ii] Calipers D Tape 48.75 cm D 4 = Advanced decomposition D 1 = Poor D 4 = Good TAIL:
D 5 = Dried mummified/ skeleton D 2 = Fair D 5 = Excellent End of plastron to tail tip (ventral side) cm D 6 = Unknown condition Iii 3 = Average D 6 = Unknown Cloaca to tail tip (ventral side) cm TAGS: Contact NMFS before disposing of any tagged animal!! HUMAN INTERACTION: Ii] Yes No D Cannot Be Determined FLIPPER: Existing metal tags present?
Yes Ii] No If yes, choose one or more. Describe and draw on diagram on back of page.
Tag#
Left/ Right Front/ Rear D 1 = Boat collision Tag#
Left/ Right Front/ Rear 2 = Shot Return address:
D 3 = Fishery interaction D Hook D Monofilament D Braided line D Netting Evidence of old tag holes/ rips in flippers Yes No 4 = Oiled If yes, draw on diagram on back of page.
Ii] 5 ='Power plant entrainment Diablo Canyon Power Plant PIT: Existing PIT tags present?
Yes No D 6 = Other Scanner type: AVID D Universal tag reader How determined? Ii] External exam Internal exam D Necropsy PIT tag #did not scan Evidence collected? D Yes Iii No Describe Location:
Left/ Right Front/ Rear Storage location PIT tag#
Digital photos sent to NMFS coordinator? D Yes Iii No Location:
Left/ Right Front/ Rear APPLIED NEWT AGS (live turtle):
Yes No OTHER FINDINGS: Iii Yes No D Cannot Be Determined Tag#
Left/ Right Front/ Rear If yes, choose one or more. Describe and draw on diagram on back of page.
Tag#
Left/ Right Front/ Rear D 1 = Disease PIT tag#
D 2 = Trauma Location:
Left/ Right Front/ Rear Ii] 3 = Cold stunning: Body temp (live only) ~°C/°F method cloacal probe PIT tag#
D 4 = Other Location:
Left/ Right Front/ Rear How determined? Iii External exam D Internal exam D Necropsy FINAL DISPOSITION: Check all that apply.
D 1 = Alive, released D At site D Relocated If fishery interaction, disentangled prior to release? D Yes D No Iii 2 = Alive, transferred to rehabilitation Date6111124 F aci lily Aquarium of the Pacific D 3 = Euthanized at site By Carcass disposition D 4 = Dead, left at site Marked? D Yes No How?
D 5 = Dead, buried: D On beach D Off beach Where?
D 6 = Dead, salvaged: D Whole carcass D Part(s) D Frozen for later exam Please note all specimens collected and disposition on back.
D 7 = Necropsied: D Field D Laboratory Date By D 8 = Left floating, not recovered Why?
D 9 = Disposition unknown Explain:
CARAPACE (DORSAL VIEW)
ADDITIONAL COMMENTS ASTRON (VENTRAL VIEW)
Revised 3/2020 LEFT LEFT
~?p;y 0-S i sterior~
Marginal TIP Please mark wounds/ abnormalities on diagrams above and describe them below. Be sure to measure all wounds/ lesions and document with digital photos. Note tar or oil, gear or debris entanglements, epibiota, masses, papillomas, emaciation, etc.
Please note if no wounds or abnormalities are found.
Digital photos taken? [i] Yes D No Quiet, alert, and responsive. Can lift head above plane of body, strong spontaneous movmement of head and all flippers, moving around carrier, flaps flippers when lifted.
Eyes open and aware of surroundings, clear OU. No nasal discharge, no oral lesions observed, no foreign material in oral or cloaca.
Heart rate 9 beats/min, respiratory rate 4 breaths/min, core body temp (cloacal probe) 11.5 C (52,7 F), weight 23 kg.
Brown algal growth diffusely across 80% of carapace, with some patchy algae on plastron. 6 large round barnacles (2-4 cm diameter) on carapace, with several round raised ulcerative lesions on dorsal and ventral front flippers (likely previous barnacle attachment sites). Gooseneck barnacle trailing off claw of right hind flipper.
Crusty pink inflammatory tissue on ventral side of tail base. No evidence of trauma or fisheries interactions.
Additional Attachments (e.g. Level A, Pathology): _____ _________ ______ _ _ _____ _
SPECIMEN DISPOSITION:
Check all that apply.
[i] Scientific collection Education Other _________ _
List all samples/ parts collected (note tissue and storage medium): Storage location. _______________ __ _
Plasma (lithium heparin)- 3 vial* x 1.8 ml each, frozen at TMMC for cold-stun health assessment NMFS Sample Requests:
Skin (All species):
Scleral ossicles (Leatherbacks only):
Humerus bone (CM, CC and El only):
DMSO D Left eye Left D Saturated salt D Right eye Right Other Samples: _______________________ _
SHIP TO: Erin LaCasella SWFSC-NMFS-NOAA 8901 La Jolla Shores Drive La Jolla, CA 92037 858-546-5696 Erin.LaCasella@noaa.gov SWFSC Animal ID: _ _
Other ID: ________ _ ____ _
PLEASE MAIL ORIGINAL FORMS TO REGIONAL STRANDING COORDINATOR:
In CA: Justin Viezbicke, NOAA-West Coast Region, Long Beach Office; 501 W. Ocean Blvd., Suite 4200, Long Beach, CA 90802 Office: (562) 980-3230, Hotline Cell: (562) 506-4315, Fax: (562) 980-4027, Justin.Viezbicke@noaa.gov In OR/WA: Kristin Wilkinson, NOAA - West Coast Region, Seattle Office; 7600 Sand Point Way Northeast, Seattle, WA 98115 Office: (206) 526-4747, Cell: (206) 550-6208, Kristin.Wilkinson@noaa.gov
PG&E Letter DCL-2024-527 July 2, 2024 Specimen Photographs - Loggerhead Sea Turtle (Caretta caretta)
Diablo Canyon Power Plant (DCPP) - June 17, 2024