MONTHYEARML24036A3382024-02-0505 February 2024 Environmental Scoping Meeting for the Diablo Canyon License Renewal Application - February 8 Meeting Slides ML24030A4672024-01-30030 January 2024 Environmental Scoping Meeting for the Diablo Canyon License Renewal Application - February 1 Meeting Slides ML23255A0012023-09-13013 September 2023 PG&E Slides for 9/13 Public Meeting Related to Diablo Canyon License Renewal ML23249A1592023-09-13013 September 2023 License Renewal Application Pre-Application Meeting: September 13, 2023 ML23174A0562023-06-26026 June 2023 Slides for TSTF-505 Pre-Submittal Public Teleconference 6-26-2023 ML23143A0882023-05-24024 May 2023 May 24, 2023, Public Meeting Slides Related to Diablo Canyon License Renewal ML23118A0902023-05-0303 May 2023 May 3, 2023, Diablo Public Meeting Slides ML23143A0952023-05-0303 May 2023 May 3, 2023, Diablo Public Meeting Slides for PG&E Presentation ML23079A0452023-03-16016 March 2023 RIC 2023 Slides - Maureen Zawalick TH19 ML22339A1022022-12-0505 December 2022 Pg_E Presentation for NRC Public Meeting ML22236A5472022-08-24024 August 2022 NRC Slides for Decommissioning Engagement Panel 8-24-2022 Meeting ML22200A0712022-07-21021 July 2022 Post-Shutdown Decommissioning Activities Report Public Meeting Slides - July 21, 2022 ML22200A0722022-07-21021 July 2022 PG&E Slides for Post-Shutdown Decommissioning Activities Report Public Meeting, Site-Specific Decommissioning Cost Estimate, and Irradiated Fuel Management Plan - July 21, 2022 ML21223A0842021-08-11011 August 2021 Slides for Post Shutdown EP pre-submittal Public Teleconference 8-30-2021 ML20310A2792020-11-0505 November 2020 Slides for Defueled TS Pre-Submittal Public Teleconference November 24, 2020 (L-2020-LRM-0101) ML21060B1872020-01-26026 January 2020 Enclosure 3 - 1-26-21 Diablo Canyon Renewal pre-app Meeting Slides ML19233A0722019-08-27027 August 2019 NEIMA Meeting Slides Public ML18295A0732018-10-24024 October 2018 Final Diablo Canyon Decommissioning Engagement Panel Meeting Oct 24 2018 ML17296A2222017-08-29029 August 2017 Presentation on Reactor Decommissioning for the August 29, 2017 at Congressman Salud Carbajal'S Public Meeting at San Luis Obispo Near Diablo Canyon ML16335A4392016-11-30030 November 2016 PG&E Reg Conference Presentation - NRC-11152016 ML15232A0102015-08-0404 August 2015 Diablo Canyon Power Plant - Risk-Informed Technical Specification Completion Times (TSTF-505) License Amendment Request: August 4, 2015 ML15216A4112015-08-0404 August 2015 TSTF-505: August 4, 2015 Public Meeting ML15216A4082015-08-0404 August 2015 Diablo Canyon Power Plant - Risk-Informed Technical Specification Completion Times (TSTF-505) License Amendment Request: August 4, 2015 ML15209A9442015-07-28028 July 2015 June 24, 2015, Summary of Annual Assessment Meeting with Pacific Gas and Electric and Public Open House Regarding Diablo Canyon Power Plant 2014 Performance ML15202A0982015-07-21021 July 2015 Slides for the August 5, 2015 Diablo Canyon Power Plant License Renewal Application Public Scoping Meeting ML15117A2262015-04-28028 April 2015 Nuclear Regulatory Commission April 28, 2015, Public Meeting Slides for Diablo Canyon Seismic Hazard Reevaluation ML15117A0692015-04-28028 April 2015 Pacific Gas and Electric Co. April 28, 2015, Public Meeting Slides for Diablo Canyon Seismic Hazard Reevaluation ML15035A0062015-02-0404 February 2015 Meeting Presentation, Diablo Canyon Power Plant Process Protection System Replacement Lessons Learned Using ISG 6 NRC Meeting on Digital I&C. ML15029A0942015-02-0303 February 2015 Alternate Source Term Pre- Submittal Meeting on February 3, 2015 (TAC Nos. MF5596 and MF5597). AST LAR NRC Meeting Presentation ML15014A2232015-01-14014 January 2015 Slides Regulatory Conference - January 14, 2015 ML14195A3742014-07-10010 July 2014 Update of Industry Actions Related to Diablo Canyon OE ML14188A9702014-07-0808 July 2014 14-07-08 ISG-06 Experience Presentation July 8 2014 Digital IC Meeting ML14155A3742014-06-0404 June 2014 May 22, 2014, Summary of Annual Assessment Meeting with Pacific Gas and Electric Regarding Diablo Canyon Power Plant 2013 Performance ML14077A2872014-03-18018 March 2014 Transcript of the 612th ACRS Meeting, March 6, 2014 (Open) Pages 1-317 ML13150A1712013-11-19019 November 2013 1978 - Rhrp Cavitation ML13150A1812013-11-19019 November 2013 Trade-Off Between Tank Vortexing Margin and ECCS Function ML13274A5142013-10-0202 October 2013 License Slides, 10/2/13 Pre-Application Meeting with Pacific Gas and Electric Company to Discuss Upcoming Structural Weld Overlay Relief Request to Use an Alternative to Disposition Detected Laminar Indications at Diablo Canyon, Unit 2 (TAC ML13269A0052013-09-26026 September 2013 Licensee Slides for 9/26/13 Meeting to Discuss Amendment Request to Adopt Technical Specifications Task Force TSTF-505, Provide Risk-Informed Extended Completion Times, RITSTF Initiative 4B ML13268A0022013-09-25025 September 2013 Slide Presentation for 9/25/13 Preapplication Meeting - Use of Leak-before-break for Fuel Structural Analyses and Coolable Geometry ML13268A0052013-09-24024 September 2013 Slide Presentation for 9/24/13 Pre-application Meeting, Diesel Generator License Amendment Request ML13159A0092013-06-0404 June 2013 Notable Failures in Nondustructive Testing - June 4, 2013 Public Meeting ML13066A7402013-03-0707 March 2013 Licensee Slides from 3/7/13 Pre-Application Meeting with Pacific Gas and Electric Company(Tac MF0687 & MF0688) ML13044A7352013-02-12012 February 2013 Licensee Slides from 2/12/13 Public Meeting to Discuss License Amendment Requests for Degraded Voltage Protection and Control Room Dose Analysis of Record at Diablo Canyon, Units 1 and 2 ML13024A4052013-01-24024 January 2013 Licensee Slides from 1/24/13 Meeting to Discuss Offsite Power ML13018A1342013-01-15015 January 2013 Pacific Gas and Electric Handouts from January 15, 2013 Meeting Regarding Pending License Amendment Request Related to Diesel Generator Technical Specifications ML12355A1612012-12-18018 December 2012 PG&E Handouts from the December 18, 2012, Meeting with the NRC Related to Emergency Core Cooling System Evaluations (TAC Nos. MF0313 and MF0315) ML12311A0492012-09-18018 September 2012 Part 26 Public Meeting NEI Presentation Slides ML12226A2552012-08-0707 August 2012 License Slides from 8/7/12 Meeting with Pacific Gas and Electric Regarding Future License Amendment Associated with Diesel Generator Technical Specifications ML12193A1412012-07-25025 July 2012 6/28/2012 Summary of Meeting with Pacific Gas and Electric to Discuss Digital Replacement of Process Protection System at Diablo Canyon, Units 1 and 2 and Presubmittal of TSTF-493 Option B License Amendment Request (TAC ME7522-ME7523, ME851 ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a 2024-02-05
[Table view] |
Text
Agenda NRC Category III Public Meeting to obtain comments to identify best practices for establishment and operation of local community advisory boards (CABs) for decommissioning nuclear power reactors, including lessons learned Meeting Safety Procedures
Introductions
NRC Presentation on Decommissioning Experience, Process and Citizens Advisory Boards Ground Rules Public Comments Close the meeting at 9 p.m.
2
Decommissioning Experience Current decommissioning regulations are performance-based and risk-informed Extensive decommissioning experience A total of 10 power reactor sites have completed decommissioning and had the reactor licenses terminated for unrestricted use Cumulative Completion of Decommissioning Sites 1998-2018 80 70 60 50 40 30 20 10 0
Materials Sites Research Reactors Power Reactors 3
California Decommissioning Experience Rancho Seco 4
California Decommissioning Experience Humboldt Bay August 2019 5
Nuclear Energy Innovation and Modernization Act (NEIMA) Section 108 January 14, 2019 - legislation issued. Section 108 requires a report to Congress by July 14, 2020 identifying best practices for establishment and operation of local community advisory boards (CABs) for decommissioning nuclear power reactors, including lessons learned from such organizations.
Assigned to the Reactor Decommissioning Branch in NMSS Federal Register Notice soliciting requests for public meetings to discuss CAB best practices issued on March 18, 2019 Public meeting locations were determined in June 2019 OMB clearance for a questionnaire associated with CAB best practices and lessons learned obtained in August 2019 Nationwide Webinar held August 8, 2019 6
Best Practices for Community Advisory Boards An organized group of citizens interested in safe decommissioning practices and spent fuel management at a decommissioning facility Sponsor is usually the local licensee or mandated by the State legislature Composition typically includes local community leaders and elected officials, State representatives, and members of licensee staff Most CABs have a governing charter to establish roles and responsibilities 7
Typical CAB Responsibilities Reviews licensee decommissioning plans Feedback mechanism to the licensee Provides insight into the licensees planned activities potential impact on the local community Forum for public education on decommissioning Makes recommendations to State officials Provides input on site restoration decisions Considers plans for future reuse of the site Considers economic development concerns 8
CAB History Maine Yankee - licensee sponsored CAB Connecticut Yankee - licensee sponsored CAB Yankee Rowe - State sponsored No CABs, but other outreach activities during decommissioning:
Big Rock Point Fort St. Vrain Pathfinder Rancho Seco Shoreham Saxton Trojan 9
Decommissioning Outreach State Mandated CAB Pilgrim Vermont Yankee Licensee Sponsored CAB Diablo Canyon Humboldt Bay San Onofre Zion La Crosse Yankee Rowe Other Licensee Outreach Programs Fort Calhoun Crystal River Kewaunee Oyster Creek 10
NEIMA 108 Report to Congress (A) [what are] the topics that could be brought before a local community advisory board (B) how such a boards input could be used to inform the decision making processes of stakeholders for various decommissioning activities (C) what interactions such a board could have with the Commission and other Federal regulatory bodies to support the board members overall understanding of the decommissioning process and promote dialogue between the affected stakeholders and the licensee involved in decommissioning activities (D) how such a board could offer opportunities for public engagement throughout all phases of the decommissioning process 11
Questions for the Public to Inform the Report to Congress Why was the local CAB established?
How and when was the local CAB established?
Is there a charter for the CAB?
What is the historical and current frequency of CAB meetings?
What is the historical and current composition of the local CAB?
What is the selection process for board members?
What are the terms of board members?
Are there any specific rules or protocols followed by the CAB?
Are there any specific logistics required to support the boards meetings and other routine activities?
How is the boards input used to inform the decision-making processes of stakeholders for decommissioning activities?
12
Questions for the Public to Inform the Report to Congress Who sponsors (funds) the CAB expenses? What kinds of activities are included in the CAB budget (e.g., transcription service, audio/visual support, meeting venues, meals and per diem for CAB members)?
What topics have been (or could be) brought before a CAB?
What other topics could be useful to stakeholders understanding of the decommissioning process?
What interactions does the local CAB have with the NRC and other Federal regulatory bodies?
How does the CAB offer opportunities for public engagement throughout all phases of the decommissioning process?
In general, what are the advantages of having a local CAB?
In general, what are the disadvantages of having a local CAB?
13
Questions for the Public to Inform the Report to Congress Please share any additional best practices or other lessons learned related to having a local CAB For decommissioning plants without an established CAB:
Has the licensee or State ever considered the establishment of a local CAB? When was it considered?
What are the reasons for not establishing a local CAB?
How does the licensee or State provide opportunities for public engagement throughout the decommissioning process?
In general, what are the advantages of not having a local CAB?
In general, what are the disadvantages of not having a local CAB?
14
Methods to Submit Comments Fill out the NEIMA questionnaire online here:
https://www.nrc.gov/waste/decommissioning/neima-local-comm-advisory-board-questionnaire.html Scan completed questionnaires and send to:
NEIMA108.Resource@nrc.gov Mail completed questionnaires to:
Kim Conway, U.S. NRC 11545 Rockville Pike, Mail Stop T-5 A10 Rockville, MD 20852 Additional information located on the web site:
https://www.nrc.gov/waste/decommissioning/neima-section-108.html 15
Questions David McIntyre, Office of Public Affairs Phone: 301-415-8206 Email: NEIMA108.Resource@nrc.gov 16