IR 05000275/2024014
ML24192A224 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 07/11/2024 |
From: | Vincent Gaddy NRC/RGN-IV/DORS/EB1 |
To: | Gerfen P Pacific Gas & Electric Co |
Reinert D | |
References | |
IR 2024014 | |
Preceding documents: |
|
Download: ML24192A224 (9) | |
Text
July 11, 2024
SUBJECT:
DIABLO CANYON NUCLEAR POWER PLANT - AGE-RELATED DEGRADATION INSPECTION REPORT 05000275/2024014 AND 05000323/2024014
Dear Paula A. Gerfen:
On June 27, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Nuclear Power Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket Nos. 05000275, 05000323 License Nos. DPR-80, DPR-82
Enclosure:
As stated
Inspection Report
Docket Nos. 05000275, 05000323
Report Nos. 05000275/2024014 and 05000323/2024014
Enterprise Identifier: I-2024-014-0000
Licensee: Pacific Gas and Electric Company
Facility: Diablo Canyon Nuclear Power Plant
Location: Avila Beach, CA
Inspection Dates: June 10, 2024 to June 27, 2024
Inspectors: D. Bryen, Reactor Inspector D. Reinert, Senior Reactor Inspector F. Thomas, Reactor Inspector
Approved By: Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety
Enclosure
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an Age-Related Degradation Inspection at Diablo Canyon Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.21N.04 - Age-Related Degradation Age-Related Degradation
- (1) Unit 2 Diesel Generator 2-2 Day Tank Level Switches LS-202 and LS-203
- (2) Unit 2 Diesel Generator 2-3 Lube Oil Heater Controller
- (3) Unit 1 Auxiliary Saltwater Traveling Screen 1-7
- (4) Unit 1 Auxiliary Saltwater System Pump 1-1 Motor
- (5) Unit 1 Auxiliary Saltwater Pump 1-1 Room Exhaust Fan Motor
- (6) Unit 1 Component Cooling Water Heat Exchanger Inlet Isolation Valve 1-FCV-602
- (7) Unit 1 480V Switchgear Ventilation System Damper and Flow Switch FCV-5046 and FS-5040
- (8) Unit 2 480V Switchgear Ventilation System Exhaust Fan 2-E-46
- (9) Unit 2 Vital Battery 2-1
- (10) Unit 1 Containment Fan Cooler 1-2 Motor
- (11) Unit 2 Residual Heat Removal Pump 2-2 Motor
- (12) Unit 1 Condensate Storage Tank Floating Roof
- (13) Unit 1 480V Class 1E Control Room Ventilation System Molded Case Circuit Breakers
- (14) Unit 1 Containment to Auxiliary Building Annular Weatherproof Boot Seal
- (15) Unit 1 Steam Generator Main Steam Safety Valve 1-RV-224
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 27, 2024, the inspectors presented the Age-Related Degradation Inspection results to Paula A. Gerfen and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection Type Designation Description or Title Revision or
Procedure Date
71111.21N.04 Corrective Action Notification 51149178, 51149641, 51072046, 51230817, 51230616,
Documents 51146572, 51070582, 51038955, 51099790, 51140700,
51144252, 51154280, 51224176, 51220648, 51225733,
51176279, 51220557, 51221497, 51224029, 51225585,
227392, 51065420, 51141917, 51204021, 51205821,
206011, 51206345, 51212387, 51212414, 50680834,
51033218, 51131797, 51227975, 51229672, 51232621,
232627, 51235532, 51237278, 51232716, 50035683,
50573202, 51033218, 51232627, 51235532, 50980387,
51019290, 51019292, 51205592
Corrective Action Notification 51242628, 51242720, 51242726, 51242789, 51242838,
Documents 51242849, 51242861, 51242863, 51242864, 51242865,
Resulting from 51242866, 51242867, 51242868, 51242910, 51242911,
Inspection 51242912, 51242944, 51242945, 51242982, 51242986,
242987, 51242988, 51242989, 51243000, 51243001,
243002, 51243003, 51243780, 51244105, 51244107,
244158, 51244185, 51244255, 51244342, 51244471,
244474, 51244475, 51244515
Drawings 102017, Sheet Saltwater System 97
3B
2032, Sheet Flow Instrument Systems 142
2E
19407, Sheet 1 Electrical Logic Diagram Containment Fan Coolers 16
455125, Sheet 1 Electrical Schematic Diagram, Ventilation Fan Motors 8
501771, Sheet 1 Electrical Diagram of Connections Above Elevation 140' - 14
0" Area F
59346, Sheet 1 Mechanical Ventilation Plan, Area "H", Elevation 100' - 0 37
59641, Sheet 1 Architectural Miscellaneous Exterior Details 11
663336-20 Instructions for Type W Control Centers 6
Miscellaneous 6000367-23 Installation, Operation, and Maintenance Manual for 6
Backdraft Dampers and Motor Operated Shutoff Dampers
663022-27-1-5 Envirex Frame Service Manual 5
Inspection Type Designation Description or Title Revision or
Procedure Date
663022-95-1-5 Traveling Water Screen Operation and Maintenance 5
Manual
663050-32 Instructions for Installation and Maintenance of Steam 11
Lead Safety Valves, Type 3700 - Units 1 & 2
663071-335-1-2 PG&E Diablo Canyon Fiberglass Internal Floating Roof 2
Installation Procedure
663146-85-2 Magnetrol Displacer Type Switches Installation and 2
Operating Manual
663173, Sheet Bettis Service Instructions for Seismic Actuators 8
164
663278-701 Dwyer Series 1630 Differential Pressure Switches 5
DC 6000364, INSTALLATION AND MAINTENANCE MANUAL FOR 4
Sheet 26 FANS S-43, 44, 45, 46
AND E-43, 44, 45 & 46; UNITS 1 & 2
DC 663079, WESTINGHOUSE ELEC. CORP. - REACTOR 34
Sheet 51 CONTAINMENT FAN COOLER
DC 663079, Instructions For Type CSP Horizontal Induction Motor For 01/06/1994
Sheet 91 TEWAC Enclosure
DC-663173, Fisher Controls Company Type 7600 Butterfly Control 12
Sheet 120 Valve Body
Procedures AWP E-016 Inspection Guide - Maintenance Rule Structural Monitoring 12
Programs - Civil
ER1.DC1 Component Classification 6
ER1.ID1 Equipment Reliability Process 16
MA1.ID27 Preventative Maintenance Program 12
MA1.NE1 Maintenance Rule Monitoring Program - Civil 7
Implementation
MP 10881 Traveling Screen Bi-Monthly Lube/Inspect 1
MP 10882 TS 1-7: (Diver) Screen Inspections 3
MP 10970 TS1 Thru TS7: Oil Samples (Unit-1) 2
MP 11679 Clean/Insp/Megger/Test Motor 2
MP 12652 Screen Drive Chain Lube 3
MP 31892 TS1-7: Perform Outage Inspect and Lubrication 3
MP 53206 Travel Screen Float Inspect/Adjust 3
Inspection Type Designation Description or Title Revision or
Procedure Date
MP 56397 Traveling Screen Proximity Switch 3
MP E-101A Infrared Thermography Inspections 9
MP E-23.1B Containment Fan Cooler Motor Shop Overhaul 7
MP E-23.1C Containment Fan Cooler Motor Preventive Maintenance 5
MP E-53.7 Maintenance of ITT, General Controls Hydramotor 14
Actuator
MP E-53.7S Model NH92 ITT Controls Hydramotor Valve Actuator 2
Swapout
MP E-57.10B Generic 115 VAC and 480 VAC Motor Preventive 25
Maintenance
MP E-57.10C Generic 4kV Motor Preventive Maintenance 9
MP E-57.14A PI and Hipot Testing 32
MP E-57.2B Equipment Wiring and Terminations 53
MP E-64.1B Molded Case Circuit Breaker Exercise and Maintenance 20A
MP E-67.6 Station Battery Preventive Maintenance 16
MP I-21-LCV88 D/G Fuel Oil Day Tanks Level Control Calibration 6
MP I-23-F5040 Aux Bldg Swgr Room Supply Fan S-44 Disch Flow Switch 1
FS-5040 Calibration
MP M-23-FAN.10 480V Switchgear Ventilation System Maintenance 0
MP M-4.10A Steam Generator Safety Valve Removal and Installation 10
PEP 23-05 480V AC Switchgear and 125V DC Inverter Rooms 4
Ventilation System Flow Balancing
PEP M-81J Test DFO Day Tank Level Instruments 3
STP M-11A Station Battery and Pilot Cell Condition Monitoring 30
STP M-11B Station Battery Condition Monitoring 38
STP M-11C Terminal Resistance Measurement and Inspection for Vital 19
Station Batteries Effective
STP M-77 Safety and Relief valve Testing 42
STP M-81G Diesel Engine Generator Inspection (Electrical Every 31
Refueling Cycle)
STP M-9A2 Diesel Generator 2-2 Routine Surveillance Test 16
Work Orders Work Order (WO) 68036389, 64277075, 64249099, 64274676, 64189346,
64129515, 64211185, 64048769, 64139157, 64206634,
Inspection Type Designation Description or Title Revision or
Procedure Date
213685, 64255134, 60150786, 60150790, 60059552,
60076540, 64129689, 64147702, 64159916, 64132178,
64014715, 64135265, 64138128, 64196006, 64272308,
256011, 64280534, 64265947, 64268932, 64091367,
64124330, 64258747, 64273775, 64270713, 64255056,
64091381
7