August 22, 2024

SUBJECT:

UPDATED INSPECTION PLAN FOR DIABLO CANYON POWER PLANT, UNITS 1 AND 2 (REPORT 05000275/2024005 AND 05000323/2024005)

Dear Adam Peck:

The enclosed inspection plan lists the inspections scheduled through June 30, 2026, for Diablo Canyon Power Plant, Units 1 and 2. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. The Regional Administrator has approved the staffs plan to conduct Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application for both units at your facility as indicated in the enclosed inspection plan.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (817) 200-1144 with any questions you have regarding this letter.

Sincerely, Patricia J. Vossmar, Chief Reactor Projects Branch A Division of Operating Reactor Safety Signed by Vossmar, Patricia on 08/22/24 Docket Nos. 05000275, 05000323, and 07200026 License Nos. DPR-80 and DPR-82 Enclosure:

Inspection Plan cc w/ encl: Distribution via LISTSERV

ML24232A084 SUNSI Review ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By: RLB Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:DORS/A BC:DORS/A NAME RBywater PVossmar SIGNATURE

/RA/

/RA/

DATE 08/19/24 08/22/24

Site Inspection Activity Plan 07200026 - Diablo Canyon (ISFSI)

07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count Diablo Canyon ISFSI Loading Inspection (one week during the campaign)

7/14/2024 8/16/2024 IP 60855 001001 Operation Of An ISFSI ISFSI Security Inspection (IP 81311)

10/7/2024 10/11/2024 IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations Prepared on 8/16/2024 9:27:09 AM 1 of 3

Site Inspection Activity Plan Diablo Canyon 07/01/2024 - 06/30/2026 Unit Start End Activity CAC Title Staff Count DC 2024 INITIAL EXAM

1,2 7/14/2024 7/27/2024 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

EP Exercise & PI Inspection (2024) - DC

1,2 7/29/2024 8/2/2024 IP 71114.01 000716 Exercise Evaluation 1,2 7/29/2024 8/2/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 7/29/2024 8/2/2024 IP 71151 001397 Performance Indicator Verification RP 5,6,7,8

1,2 8/12/2024 8/16/2024 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 8/12/2024 8/16/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1,2 8/12/2024 8/16/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program 1,2 8/12/2024 8/16/2024 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation License Renewal 71013 - DC Unit 1 (Phase 2)

1,2 8/19/2024 8/23/2024 IP 71002 000686 License Renewal Inspection 1,2 8/19/2024 8/23/2024 IP 71013 001852 Site Inspection for Plants with a Timely Renewal Application DC 2024 PI&R Inspection

1,2 9/9/2024 9/13/2024 IP 71152B 000747 Problem Identification and Resolution 1,2 9/23/2024 9/27/2024 IP 71152B 000747 Problem Identification and Resolution Security Equip Testing and Maint

1,2 9/23/2024 9/27/2024 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance DC 2024 ARQ

1,2 10/1/2024 12/31/2024 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance Security Access Control (.02), Security Plan Changes (.09), Security PIV (71151), Target Sets (71130.14)

1,2 10/7/2024 10/11/2024 IP 71130.02 000734 Access Control 1,2 10/7/2024 10/11/2024 IP 71130.09 001656 Security Plan Changes 1,2 10/7/2024 10/11/2024 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 10/7/2024 10/11/2024 IP 71151 001338 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - DC

1,2 1/13/2025 1/17/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 2/10/2025 2/14/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing License Renewal 71013 - DC Unit 2 (Phase 2)

2 2/24/2025 2/28/2025 IP 71013 001852 Site Inspection for Plants with a Timely Renewal Application Inservice Inspection-DC (U1)

Prepared on 8/16/2024 9:27:09 AM 2 of 3

Site Inspection Activity Plan

4/7/2025 4/18/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 1,4,PI - DC

1,2 4/21/2025 4/25/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1,2 4/21/2025 4/25/2025 IP 71124.04 000728 Occupational Dose Assessment 1,2 4/21/2025 4/25/2025 IP 71151 000746 Performance Indicator Verification DC 2025 BRQ

1,2 6/1/2025 6/7/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Security Access Control (71130.02), Security Plan Changes (71130.09), Security PIV (71151)

1,2 7/7/2025 7/11/2025 IP 71130.02 000734 Access Control 1,2 7/7/2025 7/11/2025 IP 71130.09 001656 Security Plan Changes 1,2 7/7/2025 7/11/2025 IP 71151 001338 Performance Indicator Verification Fire Protection Inspection-DC

1,2 7/7/2025 7/11/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1,2 7/21/2025 7/25/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Cyber Security Inspection - DC

1,2 8/11/2025 8/15/2025 IP 71130.10 000741 Cybersecurity EP 2025 Program Inspection - DC

1,2 8/25/2025 8/29/2025 IP 71114.02 000717 Alert and Notification System Testing 1,2 8/25/2025 8/29/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 8/25/2025 8/29/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 8/25/2025 8/29/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 8/25/2025 8/29/2025 IP 71151 001397 Performance Indicator Verification DC 2025 INITIAL EXAM

1,2 9/14/2025 9/20/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 10/26/2025 11/8/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Inservice Inspection-DC (U2)

2 10/6/2025 10/17/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP 5,8 - DC

1,2 3/9/2026 3/13/2026 IP 71124.05 000729 Radiation Monitoring Instrumentation 1,2 3/9/2026 3/13/2026 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Diablo Canyon 2026 PI&R

1,2 5/4/2026 5/22/2026 IP 71152B 000747 Problem Identification and Resolution Prepared on 8/16/2024 9:27:09 AM 3 of 3