July 08, 2024
SUBJECT:
DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - SECURITY BASELINE INSPECTION REPORT 05000275/2024401 AND 05000323/2024401
Dear Paula A. Gerfen:
On June 27, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Diablo Canyon Power Plant, Units 1 and 2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Ray L. Kellar, P.E., Chief Physical Security Branch Division of Radiological Safety & Security Docket Nos. 05000275, 05000323 License Nos. DPR-80, DPR-82
Enclosure:
As stated
Inspection Report
Docket Nos.
05000275, 05000323
License Nos.
Report Nos.
05000275/2024401, 05000323/2024401
Enterprise Identifier:
I-2024-401-0015
Licensee:
Pacific Gas and Electric Company
Facility:
Diablo Canyon Power Plant, Units 1 and 2
Location:
Avila Beach, CA
Inspection Dates:
June 24, 2024 to June 27, 2024
Inspectors:
C. Jewett, Sr Physical Security Inspector
R. Lanfer, Physical Security Inspector
Approved By:
Ray L. Kellar, P.E., Chief
Physical Security Branch
Division of Radiological Safety & Security
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Diablo Canyon Power Plant, Units and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
SAFEGUARDS
71130.07 - Security Training
The inspectors evaluated the security training program through completion of the following
procedure elements: Security Training
(1)
- Tier I: All Requirements
- Tier II: All Requirements
- Tier III: All Requirements
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On June 27, 2024, the inspectors presented the security baseline inspection results to Paula A. Gerfen and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Corrective Action
Documents
51168289,
51180609,
51180971,
51188665,
201728,
227931
Corrective Action
Documents
Resulting from
Inspection
244287,
244289,
244312,
244476,
244508,
244563
Firearms Background Check Plan
1Q2020STRATR
20 Strategy Upgrade Refresher
IT20PSRTLWC
Protective Strategy RTL/WC
Continuing Training Program of Instruction
Miscellaneous
ZIT08PATROLS
Patrol Procedure for Zebras
JIT-001
Curriculum Design Handbook
OM11.ID8
Tampering, Malicious Mischief, and Vandalism
SP 201
Selection of Plant Security Force
SP 202
Security Force Training and Qualification program
037
Procedures
TQ2.ID1
Training Program Analysis
031