Other: DCL-15-142, License Renewal Feasibility Study, DCL-2014-500, 2013 Annual Report on Discharge Monitoring, ML110530294, ML15132A423, ML16048A203, ML16048A204, ML16048A205, ML16048A206, ML16048A207, ML16048A208, ML16048A210, ML16048A211, ML16048A212, ML16048A213, ML16048A214, ML16048A215, ML16048A218, ML16048A219, ML16048A284, ML16048A286, ML16049A365, ML16049A366, ML16050A229, ML16050A291, ML16050A292, ML16050A294, ML16050A296, ML16050A297, ML16050A301
|
MONTHYEARML16050A2292002-07-31031 July 2002 Pg&G Trip and Hollister Ranch Access Project stage: Other ML16048A2032004-01-31031 January 2004 Independent Spent Fuel Storage Installation (ISFSI) Final Environmental Impact Report Project stage: Other DCL-15-142, License Renewal Feasibility Study2008-07-15015 July 2008 License Renewal Feasibility Study Project stage: Other ML16050A2912008-08-22022 August 2008 Water Resources Evaluation: Well Installation and Aquifer Testing. Part 1 of 2 Project stage: Other ML16050A2922008-08-22022 August 2008 Water Resources Evaluation: Well Installation and Aquifer Testing. Part 2 of 2 Project stage: Other ML16048A2112010-12-31031 December 2010 SB14 Performance Report (2010) Project stage: Other ML16048A2842010-12-31031 December 2010 CEC-1304 Schedule 3 Part a (Page 1), Year 2010. Part 1 of 2 Project stage: Other ML1105302942011-02-0909 February 2011 Transcript of the Advisory Committee on Reactor Safeguards Plant License Renewal Subcommittee - Diablo Canyon - February 9, 2011 (Open). Pages 1-145 Project stage: Other ML16049A3652011-02-28028 February 2011 2010 Annual Report on Discharge Monitoring Project stage: Other ML16048A2142011-03-0707 March 2011 2010 Air Emission Inventory Report Project stage: Other ML16050A1782011-07-18018 July 2011 Seismic Study Meeting San Luis Obispo County Project stage: Meeting ML16048A2102012-12-31031 December 2012 RCRA Waste Off-Specification Adhesives and Sealants from Maintenance Activities Project stage: Other ML16050A2972013-04-24024 April 2013 Nrhp Dist. Nom. Update: Rancho Canada De Los Osos Y Pecho Y Islay Project stage: Other DCL-13-061, CS Innovations - Application for Witholding Proprietary Information from Public Disclosure, Enclosure, Attachment 22013-04-25025 April 2013 CS Innovations - Application for Witholding Proprietary Information from Public Disclosure, Enclosure, Attachment 2 Project stage: Request ML16048A2862013-12-31031 December 2013 CEC-1304 Schedule 3 Part a (Page 1), Year 2013. Part 2 of 2 Project stage: Other ML16050A3012014-02-20020 February 2014 Pacific Gas & Electric 230kV Electrical Switchyard Voltage Support Project Project stage: Other DCL-2014-500, 2013 Annual Report on Discharge Monitoring2014-02-28028 February 2014 2013 Annual Report on Discharge Monitoring Project stage: Other ML16049A3662014-02-28028 February 2014 2013 Annual Report on Discharge Monitoring Project stage: Other ML16048A2122014-12-31031 December 2014 Hazardous Waste Volume Trends 1994-2014 Project stage: Other ML16048A2192015-04-21021 April 2015 NPDES Receiving Water Monitoring Program: 2014 Annual Report Project stage: Other ML15132A4232015-05-12012 May 2015 Fws to NRC, Updated List of Threatened and Endangered Species That May Be Affected by the Proposed License Renewal of Diablo Canyon Nuclear Power Plant Project stage: Other ML16048A2132015-06-22022 June 2015 Permit Renewal No. 49-1 Project stage: Other ML16048A2042015-06-30030 June 2015 Notice of Intent, General Permit to Discharge Storm Water Project stage: Other ML16048A2052015-06-30030 June 2015 Storm Water Pollution Prevention Plan Project stage: Other ML15243A5542015-09-0101 September 2015 August 5, 2015, Diablo Canyon Public Scoping Meeting - Afternoon Session Project stage: Request ML16050A2942015-09-30030 September 2015 Figure 1, Previously Distributed Lands, San Luis Obispo County, CA, September 2015 Project stage: Other DCL-15-123, Updated Response to NRC Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations2015-10-22022 October 2015 Updated Response to NRC Regulatory Issue Summary 2014-05 Preparation and Scheduling of Operator Licensing Examinations Project stage: Request DCL-15-134, ISFSI - Submits 2014 Annual Commitment Change Summary Report2015-11-0505 November 2015 ISFSI - Submits 2014 Annual Commitment Change Summary Report Project stage: Request ML15295A3732015-11-0505 November 2015 Requests for Additional Information Related to the Diablo Canyon LRA Environmental Review Project stage: RAI ML16048A2182015-11-10010 November 2015 Compress Air Energy Storage (Caes) Project stage: Other ML16050A1802015-12-0404 December 2015 Response to NRC Letter Dated November 5, 2015, Request for Additional Information Related to the Environmental Review of the License Renewal Application Project stage: Request ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List Project stage: Other ML16048A2082015-12-15015 December 2015 Wastewater Treatment Unit Schematic Project stage: Other ML16048A2072015-12-15015 December 2015 Once Through Cooling Project stage: Other ML16048A2062015-12-15015 December 2015 Attachment C, Figure, Waste Stream Schematic and Map, Site Storm Water Drainage System Project stage: Other ML16050A2962015-12-15015 December 2015 Maps Project stage: Other ML15348A1702015-12-17017 December 2015 Summary of Telephone Conference Call Held Between NRC and Pacific Gas and Electric Co., Concerning the RAI Responses Pertaining to the Diablo Canyon Power Plant LRA Environmental Review Project stage: RAI ML16011A2042016-01-14014 January 2016 Summary of Conference Call on January 7, 2016, Between the U.S. NRC and Pacific Gas and Electric Co. Concerning the Responses to RAI for the Review of the Diablo Canyon Power Plant, Units 1 and 2, License Renewal Application Project stage: RAI ML16067A1162016-03-21021 March 2016 Issuance of Environmental Scoping Summary Report Associated with the Review of the Diablo Canyon Power Plant License Renewal Application Project stage: Approval 2014-02-20
[Table View] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 14, 2016 LICENSEE:
Pacific Gas and Electric Co.
FACILITY:
Diablo Canyon Power Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 7, 2016, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC CO. CONCERNING THE RESPONSES TO A REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DIABLO CANYON POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (CAC NOS. MF4019 AND MF4020)
The U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Pacific Gas and Electric Co. (PG&E) held a telephone conference call on January 7, 2016, to discuss and clarify the PG&Es December 4, 2015, responses to the NRC staffs request for additional information concerning the environmental review of the Diablo Canyon Power Plant, Units 1 and 2, license renewal application.
provides a listing of the participants and Enclosure 2 contains a listing of the responses discussed with PG&E, including a brief description of the status.
PG&E had an opportunity to comment on this summary.
/RA/
Michael Wentzel, Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323
Enclosures:
As stated cc w/encl: Listserv
ML16011A204
- concurrence via email OFFICE LA:DLR*
PM:RPB2:DLR BC:RPB2:DLR PM:RPB2:DLR NAME IBetts MWentzel JDanna MWentzel DATE 1/14/16 1/14/16 1/14/16 1/14/16
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON JANUARY 7, 2016, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND PACIFIC GAS AND ELECTRIC CO. CONCERNING THE RESPONSES TO A REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DIABLO CANYON POWER PLANT, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (CAC NOS. MF4019 AND MF4020)
DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrDraArcb Resource RidsOgcMailCenter Resource RidsNrrPMDiabloCanyon Resource MWentzel JDanna RPlasse KFolk NMartinez SLingam CKanatas, OGC JLindell, OGC THipschman, SRI JReynoso, RI JGroom, RIV DMcIntyre, OPA LUselding, OPA WMaier, RIV AMoreno, OCA
ENCLOSURE 1 TELEPHONE CONFERENCE CALL DIABLO CANYON POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS JANUARY 7, 2016 PARTICIPANTS ORGANIZATION Kevin Folk U.S. Nuclear Regulatory Commission (NRC)
Nancy Martinez NRC Michael Wentzel NRC Bryan Cunningham Pacific Gas and Electric Co. (PG&E)
Terry Grebel PG&E Michelle Olsofsky PG&E Philippe Soenen PG&E
ENCLOSURE 2 TELEPHONE CONFERENCE CALL CONCERNING THE RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE SEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW OF THE DIABLO CANYON POWER PLANT, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION JANUARY 7, 2016 By letter dated November 5, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff issued a request for additional information (RAI) to Pacific Gas and Electric Co. (PG&E) related to the environmental review of the Diablo Canyon Power Plant, Units 1 and 2 (DCPP), license renewal application. By letter dated December 4, 2015, PG&E submitted responses to the NRC staff RAIs. On January 7, 2016, the NRC staff and representatives of PG&E held a telephone conference call to discuss and clarify the following RAI responses.
Response to RAI-AIR-5(c).
Discussion: The NRC staff requested PG&E clarify whether there is a greenhouse gas emissions reduction program implemented specifically at DCPP. PG&E stated that it would provide an amended response to the RAI to provide the necessary clarification.
Response to RAI-SWR-1.
Discussion: The NRC staff requested that PG&E clarify how total surface water withdrawals at DCPP could be determined using the spreadsheets that were provided in response to this RAI.
PG&E stated that it would provide an amended response to the RAI to provide the necessary clarification.
Response to RAI-SWR-10.
Discussion: The NRC staff requested that PG&E resolve the apparent discrepancy between this RAI response, which states that the DCPP desalination facility is licensed to produce 1.5 million gallons per day (gpd) and Section 3.1.2 of the environmental report, which states that the desalination facility has the capacity to produce 450 gallons per minute (648,000 gpd).
PG&E stated that it would provide an amended response to the RAI to provide the necessary clarification.