UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

/spril 16, 2015 LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Power Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF DIABLO CANYON POWER PLANT, UNITS 1 AND 2, JULY 14-17, 2014, AUDIT ASSOCIATED WITH LICENSE AMENDMENT REQUEST TO TRANSITION TO THE NATIONAL FIRE PROTECTION ASSOCIATION 805 STANDARD (TAC NOS. MF2333 AND MF2334)

By letter dated June 26, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13196A139), as supplemented by letter dated October 3, 2013 (ADAMS Accession No. ML13277A457), Pacific Gas and Electric Company (the licensee) submitted a license amendment request (LAR) to transition the Diablo Canyon Power Plant, Units 1 and 2 (DCPP) fire protection licensing basis to Title 1O of the Code of Federal Regulations (10 CFR), Section 50.48(c). Section 50.48(c) of 10 CFR endorses, with exceptions, the National Fire Protection Association (NFPA) Standard 805, "Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants," 2001 Edition (NFPA 805). The purpose of this summary is to document the results of an audit performed at DCPP associated with this LAR.

A review team consisting of U.S. Nuclear Regulatory Commission (NRG) staff and NRG contractors from the Pacific Northwest National Laboratory (PNNL) and Southwest Research Institute (SwRl)/Center for Nuclear Waste Regulatory Analyses (CNWRA) participated in a regulatory audit of DCPP in accordance with NRG Office of Nuclear Reactor Regulation (NRR),

Office Instruction LIC-111, "Regulatory Audits" (ADAMS Accession No. ML082900195), during July 14-17, 2014, in Avila Beach, California. The purpose of the audit was to understand what information the NRG staff needed to support its review of the LAR and to develop requests for additional information (RAls) as needed. The information submitted in support of the LAR is under final review, and the staff will request any additional information needed to support its review in accordance with NRR Office Instruction LIC-101, Revision 4, "License Amendment Review Procedures" (ADAMS Accession No. ML113200053).

The audit team consisted of 12 NRG staff, two PNNL staff, and one CNWRA staff. Enclosure 1 provides the schedule of activities during the audit. Enclosure 2 lists NRG staff, PNNL staff, CNWRA staff, and the licensee's staff and contractors that participated in the audit. Enclosure 3 provides a list of attendees at the entrance meeting. Enclosure 4 contains a list of documents reviewed by the team. Enclosure 5 provides a list of attendees at the exit meeting.

On July 14, 2014, the audit team held an entrance meeting with the DCPP management, staff, contractors, and a few industry representatives. Technical discussions at the audit were focused on five major topical areas: Fire Protection Engineering (FPE), Safe Shutdown/Circuit Analyses (SSD/CA), Fire Probabilistic Risk Assessment (FPRA), Fire Modeling (FM), and fire protection program programmatic review. The audit team participated in site tours, plant

walkdowns; technical presentations and briefing, and discussions focusing on the major topical areas. During the audit, team members met in smaller groups according to their area of expertise to focus on the RAls needed in accordance with the areas of the DCPP LAR review.

The licensee's staff provided plant walkdowns and presentations on FPE, post-fire safe shutdown circuit analysis, FPRA, and FM. NRC and licensee discussions focused on these subjects and on fire protection programmatic review.

At the conclusion of the audit, the NRC's audit team participated in a summary exit meeting with the DCPP staff and management on July 17, 2014.

Please direct any inquiries to me at (301) 415-1564 or at Siva.Lingam@nrc.gov.

Sincerely,

~<f*~

Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

1. Audit Schedule
2. Audit Participants
3. Audit Participants at Entrance Meeting
4. Audit Documents
5. Audit Participants at Exit Meeting cc w/enclosures: Distribution via Listserv

Schedule of Activities Monday, July 14, 2014 07:30 a.m. Audit Commencement: NRC Audit Team members met at the Diablo Canyon Learning Services Simulator Building, established computer connections, and began DCPP site document reviews.

08:15 a.m. Introductions to site personnel 9:00 a.m. Audit Entrance meeting: Plant Overview Discussions 9:45 a.m. Virtual Tour 10:45 a.m. Main Control Room (MCR) and Hot-Shutdown Panel (HSDP) Simulator tour Breakout Sessions for: Fire PRA (FPRA), Fire Modeling (FM), Safe Shutdown (SSD), and FPE 12:30 p.m. Presentation: Attachment S Modifications Continued Sessions: FPRA, FM, SSD, and FPE New Breakout Sessions: MCR Abandonment, Nuclear Safety Capability Assessment (NSCA), Multiple Spurious Operations (MSO), Recovery Actions (RAs), Radioactive Release (RR), Non-Power Operations (NPO) 4:45 p.m. Licensee Wrap Up Tuesday, July 15, 2014 8:00 a.m. Plant Tour - [safety briefing, break into three tour groups]

12:30 a.m. Combined FPRA/FM Breakout 1:30 p.m. FM (CFAST) Presentation 3:15 p.m. FPRA Breakout 4:45 p.m. Licensee Wrap Up Wednesday, July 16, 2014 8:30 a.m. Joint FM/PRA Breakout - MCR Abandonment 10:00 a.m. Programmatic Breakout Session 12:30 p.m. Fire PRA and Fire Modeling Breakout Sessions 5:00 p.m. Licensee Wrap Up Enclosure 1

Thursday, July 17, 2014 8:00 a.m. Discussions and Continued Breakouts 10:30 a.m. Combined Group Breakout 11 :00 a.m. FPRA Breakout 2:30 p.m. Audit Exit Meeting

List of Participants NRC Audit Team

  • Alex Klein NRC Branch Chief
  • Hossein Hamzehee NRC Branch Chief
  • Paul Lain NRC Team Technical Lead
  • Harold Barrett NRC Team QA Advisor
  • J. S. Hyslop NRC FPRA
  • Garill Coles PNNL FPRA
  • Karl Bohlander PNNL SSD/CNFPE
  • Richardson, Michael Reg. Srvs Lead/Licensing
  • Baker, Steve Engr Audit Lead/Design Engr
  • Hampshire, Dave Engr Lead FPE
  • Hromyak, Dan Engr Sys Engr/FPE
  • Arsene, Alex Engr FPE
  • Baradaran, Rasool PRA Lead/PRA
  • Pyo, John PRA Analyst/PRA
  • Barber, Nathan PRA Analyst/PRA (Seismic)
  • Shepard, Matt PRA Analyst/PRA
  • lmbaratto, David PRA Analyst/PRA
  • Montoya, Ariel Engr Lead EE
  • Lodolo, Larry Engr SSD/CA
  • Leatham, Russ Engr EE/EE
  • Chitwood, Tony Operations Support/OPS (NPO)
  • Williams, Dave Operations Support/OPS (NPO)
  • Wernet, Todd Fire Chief Support/OPS (Fire Dept.)
  • Horstman, Bill Engr Lead CE/Engr (Seismic)

Enclosure 2

NRC NFPA-805 Entrance Attendance Form Name Jay Robinson Bernard Litkett Karl Bohlander Sarah Obadina Garill Coles Brian Metzger Todd Hilsmeier Paul Lain Leslie Fields Alex Klein Hossein Hamzehee Bryan Sallee Carl Terry Dan Stermer Jan Nimick Jim Weslch Paula Gerffen Mike Dominguez Todd Wernei Lynn Walter Bob Velasquez Mike Quitter Michael Ginn Tom Baldwin Rasool Boradarn Stephen Baker Mikel Betts Laura Radle Andy Ratchford Lawrence Pulley Michael Richardson NozarJahanson Brewt Weggener Stan Harris Ted Stanton John Pyo Enclosure 3

NRC NFPA-805 Entrance Attendance Form Name Name Jay Robinson Todd Wernei Bernard Litkett Lynn Walter Karl Bohlander Bob Velasquez Sarah Obadina Mike Quitter Garill Coles Michael Ginn Brian Metzger Tom Baldwin Todd Hilsmeier Rasool Boradarn Paul Lain Stephen Baker Leslie Fields Mikel Betts Alex Klein Laura Radle Hossein Hamzehee Andy Ratchford Bryan Sallee Lawrence Pulley Carl Terry Michael Richardson Dan Stermer NozarJahanson Jan Nimick Brewt Weggener Jim Weslch Stan Harris Paula Gerffen Ted Stanton Mike Dominguez John Pyo Enclosure 3

List of Documents Reviewed During the Audit

  • F.3.11 a Revision 0, Fire PRA Single Compartment Analysis for Units 1 and 2 The following appendix and attachments were reviewed:
  • Appendix R.33
  • Attachment 12
  • Attachment 32
  • F.3.11b Revision 2-Main Control Room Fire Modeling
  • F.3.6 Revision 1-Extent of Thermoplastic Cables Employed at DCPP
  • DCPP white paper related to compensatory measures
  • F.3.11 c Revision 1-Fire PRA Multi Compartment Analysis for Units 1 and 2
  • EPM-DP-FP-01 Revision 3-Detailed Fire Modeling
  • F.3.11d Revision 0-Fire-lnduced Failure for Structural Steel in Units 1 and 2
  • F.3.15 Revision 1-Uncertainty and Sensitivity Analysis
  • R2044-311-001 Revision 3-Verification and Validation of Fire Modeling Tools and Approaches for Use in NFPA 805 and Fire PRA Applications Enclosure 4

NRC NFPA-805 Exit Attendance Form Name Name Jennifer Molina Alex Klein Steve Baker Hossein Hamzehee Rasool Baradaran J. S. Hyslop Matthew Shepard Paul Lain David lmbaratto Brian Metzger Mikel Betts Jay Robinson Nathan Barber Harry Barrett John Pyo Leslie Fields Bill Keulen Bernard Litkett Robert Oldenkamy Todd Hilsmeier Wayne Ginter Kaushik Das Barry Allen Karl Bohlander Jeff Summy Sarah Obadina Lou Fusco Garill Coles Todd Wernet Tom Baldwin Alex Arsene Glenn Goelzer David Hampshire Paul Bemis Fred Mowrer Andy Ratchford Ray Dyer John Lote Mark Crompton Phillippe Soenen Ted Stanton Ken Schrader Stan Harris J. D. Wilcox Dean Overland Robert Waltos Larry Parker David Nelson Madsen Paul Ouellette David Williams A J. Chitwood Michael Richardson Travis Weber Daniel Funk Enclosure 5

walkdowns; technical presentations and briefing, and discussions focusing on the major topical areas. During the audit, team members met in smaller groups according to their area of expertise to focus on the RAls needed in accordance with the areas of the DCPP LAR review.

The licensee's staff provided plant walkdowns and presentations on FPE, post-fire safe shutdown circuit analysis, FPRA, and FM. NRC and licensee discussions focused on these subjects and on fire protection programmatic review.

At the conclusion of the audit, the NRC's audit team participated in a summary exit meeting with the DCPP staff and management on July 17, 2014.

Please direct any inquiries to me at (301) 415-1564 or at Siva.Linqam@nrc.gov.

Sincerely, IRA/

Siva P. Lingam, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosures:

1. Audit Schedule
2. Audit Participants
3. Audit Participants at Entrance Meeting
4. Audit Documents
5. Audit Participants at Exit Meeting cc w/enclosures: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrPMDiabloCanyon Resource LPL4-1 R/F RidsRgn4MailCenter Resource RidsAcrsAcnw_MailCTR Resource LFields, NRR RidsNrrDorllpl4-1 Resource JRobinson, NRR RidsNrrDraAfpb Resource BMiller, NRR RidsNrrDraApla Resource Plain, NRR RidsNrrDssStsb Resource DFrumkin, NRR RidsNrrLAJBurkhardt Resource RGallucci, NRR ADAMS Access1on No.: ML15092A079 *b1y memoran d um OFFICE N RR/DORULPL4-1 /PM NRR/DORULPL4-1/LA NRR/DRA/AFPB/BC*

NAME Slingam JBurkhardt AKlein DATE 4/6/15 4/6/15 3/26/15 OFFICE NRR/DRA/APLA/BC* NRR/DORULPL4-1/BC NRR/DORULPL4-1/PM NAME HHamzehee MMarkley Slingam DATE 3/26/15 4/16/15 4/16/15 OFFICIAL RECORD COPY