Letter Sequence Other |
---|
TAC:MD9990, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) TAC:ME3145, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis., L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008, L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008, L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538, L-MT-09-026, Calculation 0000-0081-6958 MNGP-PRNMS-APRM Calc-2008-NP, Rev. 1, Average Power Range Monitor Selected Prnm Licensing Setpoints - EPU Operation (Numac), L-MT-09-027, Extended Power Uprate: Response to Instrumentation and Controls Branch RAI No. 3 Dated April 6, 2009, L-MT-09-044, Extended Power Uprate: Response to NRC Mechanical and Civil Engineering Review Branch (Emcb) Requests for Additional Information (Rais) Dated March 28, 2009, L-MT-09-049, Drawing C.5-2007, Revision 15, Failure to Scram, L-MT-09-073, Extended Power Uprate: Response to NRC Containment and Ventilation Review Branch (Scvb) Requests for Additional Information (Rais) Dated July 2, 2009 and July 14, 2009, L-MT-09-083, Extended Power Uprate: Limit Curves Requested by the Mechanical and Civil Review Branch (Emcb) Associated with Requests for Additional Information (Rais) Dated March 20, 2009, L-MT-09-088, Extended Power Uprate: Revision to Clarify Text in Enclosures 5 and 7 of L-MT-08-052, L-MT-09-097, Extended Power Uprate: Acknowledgement of NRC Review Delay, L-MT-10-025, Extended Power Uprate (Epu): Response to NRC-NSPM February 25, 2010 Conference Call, L-MT-10-072, Extended Power Uprate: Updates to Docketed Information, L-MT-11-044, Uprate (Epu): Update on EPU Commitments, L-MT-12-056, WCAP-17549-NP, Rev. 0, Monticello Replacement Steam Dryer Structural Evaluation for High-Cycle Acoustic Loads Using ACE, L-MT-12-090, Westinghouse, LTR-A&SA-12-8, Rev. 1, Attachment B, Recommendations for Inspections of the Monticello Replacement Steam Dryer., L-MT-12-114, Drawing C.5-2007, Rev. 17, Failure to Scram, L-MT-13-020, Enclosure 1 - Responses to the Gap Analysis, L-MT-13-029, Enclosure 14 to L-MT-13-029 - WCAP-17716-NP, Revision 0, Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project., L-MT-13-091, WCAP-17716-NP, Revision 1 - Benchmarking of the Acoustic Circuit Enhanced Revision 2.0 for the Monticello Steam Dryer Replacement Project, Enclosure 14, L-MT-13-092, Extended Power Uprate (Epu): Completion of EPU Commitments, Proposed License Conditions and Revised Power Ascension Test Plan, L-MT-13-096, GE-MNGP-AEP-3304R1, Enclosure 4, NEDC-33435 Corrected Pages, L-MT-13-126, Enclosure 3, GE-MNGP-AEP-3306, Enclosure 2 GEH Response to Mella+ Eicb RAI and Affidavit, L-MT-14-023, Maximum Extended Load Line Limit Analysis Plus: Technical Specification Clarifications, L-MT-15-074, Enclosure 7, WCAP-18604-NP, Revision 0, Monticello EPU Main Steam Line Strain Data Evaluation Report., L-MT-16-017, Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology, L-MT-16-071, Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46, ML083230111, ML083400402, ML083500575, ML083570610, ML083590127, ML090710680, ML090710683, ML090710684, ML091120578, ML091140470, ML091410121, ML091410122, ML091410123, ML091410124, ML091760769, ML092290250, ML092810554, ML093160816, ML093220925, ML093220964, ML093620024, ML100280558... further results
|
MONTHYEARML0907106832008-02-17017 February 2008 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Attachment 1-1g Through End of Encl. 1 Project stage: Other ML13064A4352008-03-20020 March 2008 CA-95-075, Main Steam Line High Flow Setpoint, Attachment 4 Project stage: Other ML0914101242008-08-11011 August 2008 Monticello - Calculation CA-08-050, Rev. 0, Instrument Setpoint Calculation - Average Power Range Monitor (APRM) Non-Flow Eiased Prnm Setpoints for Cl Tp and EPU Project stage: Other L-MT-08-091, Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis.2008-10-31031 October 2008 Calculation 0801040.301, Steam Dryer Outer Hood Submodel Analysis. Project stage: Other ML0832301122008-10-31031 October 2008 NEDC-33322-NP, Revision 3, Monticello Nuclear Generating Plant, Safety Analysis Report, Constant Pressure Power Uprate. Project stage: Request ML0832301112008-11-0505 November 2008 Monticello Nuclear Generating Plant, License Amendment Request: Extended Power Uprate Project stage: Other ML0832301142008-11-0505 November 2008 Monticello Nuclear Generating Plant, Steam Dryer Dynamic Stress Evaluation. Project stage: Request ML0834003662008-12-0202 December 2008 Extended Power Uprate Acceptance Review Questions on Probabilistic Risk Assessment Issues Project stage: Acceptance Review ML0834004022008-12-0505 December 2008 Extended Power Uprate - Monticello - Request to Supplement the Application in the Probabilistic Risk Assessment Area Project stage: Other ML0835000992008-12-11011 December 2008 Monticello Extended Power Uprate (Usnrc TAC MD9990): Acceptance Review Supplement Regarding Steam Dryer Outer Hood Submodel Analysis Project stage: Supplement ML0835303022008-12-16016 December 2008 Draft Request for Additional Information, Environmental Issues of EPU Application Project stage: Draft RAI ML0936200242008-12-18018 December 2008 Report 0800760.401, Rev. 1, Flaw Evaluation and Vibration Assessment of Existing Monticello Steam Dryer Flaws for Extended Power Uprate. Project stage: Other ML0835005752008-12-18018 December 2008 Letter Finding 11/5/08 Application for Amendment Acceptable for Review Project stage: Other ML0835309982008-12-18018 December 2008 EPU Application - Additional RAI Question Regarding an Environmental Issue Project stage: RAI ML0835310022008-12-18018 December 2008 Proposed Eou Amendment - Revised RAI Re. Containment Analysis Project stage: RAI ML0914101222008-12-18018 December 2008 Monticello - Calculation CA-95-075, Revision 1, Main Steam Line High Flow Setpoint Project stage: Other ML0914101212008-12-19019 December 2008 Monticello - Calculation CA-95-073, Revision 4, Reactor Low Water Level SCRAM Setpoint Project stage: Other ML0835901272009-01-14014 January 2009 Letter Conveying Determination That Enclosure 5 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Withheld from Public Disclosure Project stage: Other ML0835706102009-01-26026 January 2009 Letter Conveying Determination That Enclosure 11 of 11/5/08 Application for EPU Amendment Contains Proprietary Information and Is Withheld from Public Disclosure Project stage: Other L-MT-09-003, Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 20082009-01-29029 January 2009 Response to NRC Environmental Branch Requests for Additional Information (Rais) Dated December 18, 2008 Project stage: Other L-MT-09-005, Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate2009-02-0404 February 2009 Revision to Attachment 1 of Enclosure 17 of MNGP License Amendment Request for Extended Power Uprate Project stage: Request L-MT-09-002, Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 20082009-02-0404 February 2009 Response to NRC Probabilistic Risk Assessment (PRA) Branch Requests for Additional Information (Rais) Dated December 5, 2008 Project stage: Other ML0904204852009-02-11011 February 2009 Draft RAI from Materials Engineering Re. Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907106792009-02-17017 February 2009 Monticello, Response to NRC Containment & Ventilation Branch Request for Additional Information (Rals) Dated December 18, 2008 Project stage: Request ML0907106802009-02-17017 February 2009 Monticello, Enclosure 1 to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 1 Dated December 18, 2008, Cover Through Copy of MNGP Appr T0406 Data Transmittal Page 424 of 424 Project stage: Other L-MT-09-004, Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 5382009-02-17017 February 2009 Enclosure 1 (Continued) to L-MT-09-004, NSPM Response to Containment & Ventilation Branch RAI Number 2, Copy of MNGP Appr T0406 Data Transmittal Pages 1 of 538 Through Pages 538 of 538 Project stage: Other ML0907106842009-02-17017 February 2009 Enclosures 2 - 4: NSPM Response to Containment & Ventilation Branch RAI Numbers 2, 3 and 4 Dated December 18, 2008 Project stage: Other L-MT-09-018, Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 20092009-02-24024 February 2009 Response to NRC Steam Generator Tube Integrity & Chemical Engineering Branch Request for Additional Information (RAI) Dated February 11, 2009 Project stage: Request ML0907100912009-03-11011 March 2009 Conveying Draft RAI Questions from the Instrumentation and Controls Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907200572009-03-12012 March 2009 Conveys Draft RAI Regarding Fire Protection for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800062009-03-18018 March 2009 Draft RAI from Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907800042009-03-18018 March 2009 Conveys Draft RAI by the PRA Licensing Branch on the Proposed EPU Amendment Project stage: Draft RAI ML0907809032009-03-19019 March 2009 Conveys Draft RAI Provided by the Containment and Ventilation Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0907809092009-03-19019 March 2009 RAI from the Containment and Ventilation Branch the Proposed Extended Power Uprate Amendment Project stage: RAI L-MT-09-017, Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 20092009-03-19019 March 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch & Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated January 16, 2009 Project stage: Request ML0908200312009-03-20020 March 2009 Draft RAI Re. Health Physics Issues for the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908200992009-03-23023 March 2009 Draft RAI from the Balance of Plant Branch Re the Proposed Amendment on Extended Power Uprate Project stage: Draft RAI ML0908800022009-03-28028 March 2009 Second Portion of Draft RAI from the Mechanical and Civil Engineering Branch Regarding the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0908800032009-03-28028 March 2009 Draft RAI from the Electrical Engineering Branch Re. the Proposed Extended Power Uprate Amendment for Monticello Project stage: Draft RAI ML0908800012009-03-29029 March 2009 Additional Draft RAI Questions from the Containment and Ventilation Branch Proposed EPU Amendment for Monticello Project stage: Draft RAI ML0910300212009-04-0606 April 2009 Draft RAI Question from Instrumentation and Controls Branch Re. Proposed EPU Amendment Project stage: Draft RAI ML0910300172009-04-0606 April 2009 Conveys an Additional EPU Draft RAI Question from Instrumentation and Controls Branch Project stage: Draft RAI L-MT-09-025, Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 20092009-04-22022 April 2009 Extended Power Uprate: Response to NRC Reactor Systems Branch and Nuclear Performance & Code Review Branch Request for Additional Information (RAI) Dated February 23, 2009 Project stage: Request ML0911205782009-04-22022 April 2009 Request for Audit of Implementation of Long-Term Stability Solution Project stage: Other ML0911902092009-04-29029 April 2009 Transmit Revised Draft RAI from the Probabilistic Risk Assessment Licensing Branch on the Proposed Extended Power Uprate Amendment Project stage: Draft RAI ML0914101232009-05-0606 May 2009 Monticello - Calculation 96-054, Rev 5, Turbine Stop Valve Closure/Generator Load Reject Scram Bypass Project stage: Other ML0911404702009-05-0707 May 2009 Determination That Submitted Information Can Be Withheld from Public Disclosure Project stage: Other ML0914101202009-05-13013 May 2009 Monticello - Extended Power Uprate: Response to NRC Instrumentation & Controls Branch Request for Additional Information Dated March 11, 2009, and April 6, 2009, and Fire Protection Branch RAIs Dated March 12, 2009 Project stage: Request L-MT-09-045, Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 20092009-05-26026 May 2009 Extended Power Uprate: Response to NRC Electrical Engineering Review Branch (Eeeb) Request for Additional Information (RAI) Dated March 28, 2009 Project stage: Request L-MT-09-029, Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 20092009-05-29029 May 2009 Extended Power Uprate: Response to NRC Probabilistic Risk Assessment (PRA) Licensing Branch Request for Additional Information (RAI) Dated April 29, 2009 Project stage: Request 2009-02-24
[Table View] |
|
---|
Category:Annual Operating Report
MONTHYEARL-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-21-033, 2020 Annual Radioactive Effluent Release Report2021-05-13013 May 2021 2020 Annual Radioactive Effluent Release Report L-MT-20-045, 2020 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462020-12-16016 December 2020 2020 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-18-071, Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462018-12-12012 December 2018 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-17-086, Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462017-12-15015 December 2017 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-17-037, 2016 Annual Radiological Environmental Operating Report2017-05-10010 May 2017 2016 Annual Radiological Environmental Operating Report L-MT-16-071, Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462016-12-19019 December 2016 Submittal of 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-16-027, Annual Report of Changes in Areva Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462016-05-24024 May 2016 Annual Report of Changes in Areva Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-15-091, Submittal of 2015 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462015-12-22022 December 2015 Submittal of 2015 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-14-101, Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462014-12-30030 December 2014 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-13-116, 2013 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models2013-12-27027 December 2013 2013 Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models L-MT-13-042, Submittal of 2012 Annual Radiological Environmental Operating Report2013-05-10010 May 2013 Submittal of 2012 Annual Radiological Environmental Operating Report L-MT-13-037, 2012 Annual Report of Individual Monitoring2013-04-18018 April 2013 2012 Annual Report of Individual Monitoring L-MT-12-106, Submission of 10CFR72.48 Report Re Changes to Spent Fuel Storage Cask Design and Any Tests, Experiments or Procedures Changes for 10/04/2011 to 10/30/20122012-11-29029 November 2012 Submission of 10CFR72.48 Report Re Changes to Spent Fuel Storage Cask Design and Any Tests, Experiments or Procedures Changes for 10/04/2011 to 10/30/2012 L-MT-12-042, Submittal of 2011 Annual Radiological Environmental Operating Report2012-05-10010 May 2012 Submittal of 2011 Annual Radiological Environmental Operating Report ML12114A0132012-04-18018 April 2012 Submittal of 2011 Annual Report of Individual Monitoring L-MT-11-020, 2010 Annual Radiological Environmental Operating Report2011-05-12012 May 2011 2010 Annual Radiological Environmental Operating Report L-MT-11-021, Submittal of 2010 Radioactive Effluent Release Report2011-05-12012 May 2011 Submittal of 2010 Radioactive Effluent Release Report L-MT-10-075, 2010 Report of Changes and Errors in ECCS Evaluation Models for July 2009 Through July 20102010-12-20020 December 2010 2010 Report of Changes and Errors in ECCS Evaluation Models for July 2009 Through July 2010 L-MT-08-081, Report of Changes and Errors in ECCS Evaluation Models2008-12-30030 December 2008 Report of Changes and Errors in ECCS Evaluation Models L-MT-04-012, Annual Report of Safety Relief Valve Failures and Challenges, January 1 Through December 31, 20032004-02-18018 February 2004 Annual Report of Safety Relief Valve Failures and Challenges, January 1 Through December 31, 2003 L-MT-03-077, 2003 Report of Changes and Errors in ECCS Evaluation Models2003-10-16016 October 2003 2003 Report of Changes and Errors in ECCS Evaluation Models M200204, Annual Radiological Environmental Operating Report2002-05-15015 May 2002 Annual Radiological Environmental Operating Report ML0214300222002-05-15015 May 2002 Part a - Monticello Nuclear Generating Plant 2001 Radioactive Effluent Release Report 2023-12-11
[Table view] Category:Letter type:L
MONTHYEARL-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report2023-05-10010 May 2023 Submittal of 2022 Annual Radioactive Effluent Release Report L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 322023-05-0202 May 2023 Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2023-04-18018 April 2023 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 22023-03-17017 March 2023 Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)2023-02-0707 February 2023 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program2023-01-23023 January 2023 CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative2022-12-15015 December 2022 L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462022-12-13013 December 2022 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases L-MT-22-047, Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-11-10010 November 2022 Withdrawal of Request for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-045, Letter Submitting Post-Exam Package2022-11-0404 November 2022 Letter Submitting Post-Exam Package L-MT-22-030, Sixth Interval Inservice Testing (1ST) Plan2022-09-0606 September 2022 Sixth Interval Inservice Testing (1ST) Plan L-MT-22-037, Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-08-29029 August 2022 Supplement to 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval, Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-007, Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007)2022-07-22022 July 2022 Response to Request for Additional Information for the Monticello Nuclear Generating Plant Alternative Request VR-08 (EPID: L-MT-22-007) L-MT-22-026, Changes to the Emergency Plan2022-07-19019 July 2022 Changes to the Emergency Plan L-MT-22-024, Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies2022-06-0606 June 2022 Response to a Request for Additional Information for the Monticello Nuclear Generating Plant Related to the Amendment to Adopt Advanced Framatome Methodologies L-MT-22-022, Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency2022-05-25025 May 2022 Response to a Request for Additional Information: Monticello Alternative VR-10, Excess Flow Check Valve Testing Frequency L-MT-22-017, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report L-MT-22-018, 2021 Annual Radioactive Effluent Release Report2022-05-11011 May 2022 2021 Annual Radioactive Effluent Release Report L-MT-22-016, 2021 Annual Report of Individual Monitoring2022-04-28028 April 2022 2021 Annual Report of Individual Monitoring L-MT-22-019, Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval2022-04-18018 April 2022 Withdrawal of Requests for Relief from ASME OM Code for the Sixth Inservice Testing Interval L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-22-012, Special Report for the Bypass of the Offgas Treatment Storage System2022-03-15015 March 2022 Special Report for the Bypass of the Offgas Treatment Storage System L-MT-22-008, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008)2022-03-0707 March 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval Alternative Related to Excess Flow Check Valve Testing Frequency (L-MT-22-008) L-MT-22-006, 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006)2022-02-18018 February 2022 10 CFR 50.55a Request Associated with the Monticello Sixth Inservice Testing Ten-Year Interval OMN-26 (L-MT-22-006) 2024-01-11
[Table view] |
Text
2807 West County Road 75 Monticello, MN 55362 Xcel Energy R ESP 0 N S I B l E BY NAT U R E 800.895.4999 xcelenergy.com December 19, 2016 L-MT-16-071 10 CFR 50.46(a)(3)(ii)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket No. 50-263 Renewed Facility Operating License No. DPR-22 2016 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46
References:
- 1) NSPM (T. O'Connor) to NRC, "License Amendment Request: Extended Power Uprate (TAC MD9990)," L-MT-08-052, dated November 5, 2008 2) NSPM (M. Schimmel) to NRC, "Monticello Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests:
Supplement for Analytical Methods Used to Address Thermal Conductivity Degradation and Analytical Methods Limitations (TAC Nos. MD9990 and ME3145)," L-MT-13-053, dated July 8, 2013 3) NSPM (P. Gardner) to NRC, "2015 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 1 0 CFR 50.46," L-MT-15-091, dated December 22, 2015 Pursuant to 10 CFR 50.46(a)(3)(ii), the Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, is providing this annual report concerning changes or errors identified in the Emergency Core Cooling System (ECCS) evaluation models for the Monticello Nuclear Generating Plant (MNGP). The MNGP Loss of Coolant Accident (LOCA) analyses of record (AOR) are contained in the General Electric-Hitachi (GEH) reports submitted for the MNGP Extended Power Uprate and the Maximum Extended Load Line Limit Analysis Plus (MELLLA+)
license amendments (References 1 and 2). Provided within Enclosure 1 is a report.concerning any changes or errors identified in the GEH ..... ECCS evaluation models for the MNGP. This report is for the period between July 2015 and July 2016 for the GEH fuel. The core for the current operating cycle (Cycle 28) consists solely of the GE14 fuel type. During this period no notifications of any changes or errors resulting in a change to the calculated Peak Clad Temperature (PCT) were received from GEH.
L-MT-16-071 Page 2 of 2 Therefore, the licensing basis PCT of less than 2170oF for the GE14 fuel and the PCT summary provided in the 2015 annual report is unchanged (Reference 3). The 2017 Refueling Outage (RFO), scheduled for early 2017, will be the first loading of the AREVA ATRIUM 10XM fuel type into the MNGP core (Cycle 29).(1) Pursuant to 10 CFR 50.46(a)(3)(ii), NSPM is providing within Enclosure 2 a report concerning any changes or errors identified in the AREVA ECCS evaluation models for MNGP for the period between July 2015 and July 2016. During this reporting period, AREVA provided two notification letters involving a total of nine specific changes or errors, resulting in a minus 5°F change, and an adjusted licensing basis PCT of less than 2083°F for the ATRIUM 10XM fuel type. Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
7 @/ 1 Peter A. Gardner Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company-Minnesota
Enclosures:
(2) cc: Administrator, Region Ill, USNRC Project Manager, Monticello, USNRC Resident Inspector, Monticello, USNRC 1. Until all the GE14 fuel is permanently discharged from the MNGP core, annual reports will continue to be provided for the associated GEH evaluation models, pursuant to 10 CFR 50.46. While both GE14 and ATRIUM 10XM fuel are in the core, NSPM intends to provide an annual report to include both the GEH and AREVA changes.
ENCLOSURE 1 MONTICELLO NUCLEAR GENERATING PLANT TABLE 1 -
SUMMARY
OF MONTICELLO LOCA CHANGES AND ERRORS INVOLVING CHANGES IN PEAK CLADDING TEMPERATURE (PCT) FOR GE14 FUEL L-MT-16-071 Enclosure 1 Page 1 of 3 TABLE 1 -
SUMMARY
OF MONTICELLO LOCA CHANGES AND ERRORS INVOLVING CHANGES IN PEAK CLADDING TEMPERATURE (PCT) FOR GE14 FUEL Licensing Applicable Analysis or Error/Change Description Ref. Basis PCT(°F) GE14 NEDC-33322P, Revision 3, Safety Analysis Report for Monticello G1& <2140 Constant Pressure Power Uprate G2 PRIME Fuel Properties Implementation for Fuel Rod T/M Performance, replacing GESTR Fuel Properties (1 0 CFR 50.46 Notification Letter 2012-01, Revision 1) This change is due to the application of an NRC-approved G3 +10 procedure to estimate the change in Peak Clad Temperature (PCT) due to the change in fuel properties from GESTR to PRIME primarily to address inaccuracies in fuel pellet thermal conductivity as a function of exposure.
SAFER04A E4-Maintenance Update Changes (1 0 CFR 50.46 Notification Letter 2014-01) This change is for a new version (E4) of SAFER04A that G4 +0 resolves several accumulated observations that are code maintenance items. Sensitivity calculations show these items have an insignificant effect on calculated PCT. SAFER04A E4-Mass Non-Conservatism (1 0 CFR 50.46 Notification Letter 2014-02) This change is due to a logic error that occurs when upper G5 +15 plenum liquid mass and core spray flow rate are low. System mass is gradually lost due to core spray being discarded, resulting in marginally less ECCS flow credited as reaching the core. SAFER04A E4-Minimum Core DP Model (1 0 CFR 50.46 Notification Letter 2014-03) This change is due to the use of a minimum Lip that could be G6 +20 offering inappropriate steam cooling benefit above the core two-phase level.
- .-** ,, L-MT-16-071 Enclosure 1 Page 2 of 3 TABLE 1 -
SUMMARY
OF MONTICELLO LOCA CHANGES AND ERRORS INVOLVING CHANGES IN PEAK CLADDING TEMPERATURE (PCT) FOR GE14 FUEL Licensing Applicable Analysis or Error/Change Description Ref. Basis PCT(°F) GE14 SAFER04A E4-Bundle/Lower Plenum CCFL Head (1 0 CFR 50.46 Notification Letter 2014-04) This change is due to the counter current flow limitation (CCFL) G7 -15 calculation representing the pressure head slightly different from that of the calculated water level in the bundle. Sum of absolute value of changes for the current reporting period, which 0 includes all changes since the 10 CFR 50.46 report. Sum of absolute value of changes since last A OR. 60 Algebraic sum of changes for the current reporting period, which includes +0 all changes since the 10 CFR 50.46 report. Algebraic sum of changes since last A OR. +30 Current Adjusted Peak Cladding Temperature
<2170 References G1. GE Report: NEDC-33322P Revision 3, "Safety Analysis Report for Monticello Constant Pressure Power Uprate," dated October 2008 (Enclosure 5 of NSPM (T. O'Connor) to NRC, "License Amendment Request: Extended Power Uprate (TAG MD9990)," L-MT-08-052, dated November 5, 2008) G2. NSPM (M. Schimmel) to NRC, "Monticello Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus License Amendment Requests:
G3. Supplement for Analytical Methods Used to Address Thermal Conductivity Degradation and Analytical Methods Limitations (TAG Nos. MD9990 and ME3145)," L-MT-13-053, dated July 8, 2013 GEH 10 CFR50.46 Notification Letter 2012-01, Revision 1, "PRIME Fuel Properties Implementation for Fuel Rod T/M replacing GESTR Fuel Properties," dated July 30, 2013 G4. GEH 10 CFR 50.46 Notification Letter 2014-01, "SAFER04A E4-Maintenance Update Changes," dated May 21, 2014 L-MT-16-071 Enclosure 1 Page 3 of 3 TABLE 1 -
SUMMARY
OF MONTICELLO LOCA CHANGES AND ERRORS INVOLVING CHANGES IN PEAK CLADDING TEMPERATURE (PCT) FOR GE14 FUEL References G5. GEH 10 CFR 50.46 Notification Letter 2014-02, "SAFER04A E4-Mass Non-Conservatism," dated May 21, 2014. G6. GEH 10 CFR 50.46 Notification Letter 2014-03, "SAFER04A E4-Minimum Core DP Model," dated May 21, 2014. G7. GEH 10 CFR 50.46 Notification Letter 2014-04, "SAFER04A E4-Bundle/Lower Plenum CCFL Head," dated May 21, 2014.
ENCLOSURE 2 MONTICELLO NUCLEAR GENERATING PLANT TABLE 2-
SUMMARY
OF MONTICELLO LOCA CHANGES AND ERRORS INVOLVING CHANGES IN PEAK CLADDING TEMPERATURE (PCT) FOR ATRIUM 10XM FUEL L-MT-16-071 Enclosure 2 Page 1 of 4 TABLE 1 -
SUMMARY
OF MONTICELLO LOCA CHANGES AND ERRORS INVOLVING CHANGES IN PEAK CLADDING TEMPERATURE (PCT) FOR AREVA 1 OXM FUEL Licensing Applicable Analysis or Error/Change Description Ref. Basis PCT(°F) 10XM ANP-3212(P)
Revision 0, Monticello EPU LOCA-ECCS Analysis A1 <2088 MAPLHGR Limits for ATRIUMŽ 10XM Fuel Implementation of ACE in RELAX. The approved interpolation scheme required by Licensing A2 +0 Topical Report (L TR) EMF-2361 (Section 3.2.2) was not employed when the ACE Critical Heat Flux (CHF) correlations were implemented in RELAX. Modified Analysis Approach (1). Extraneous messages written in RELAX minor edits can impact A2 +0 the modified analysis approach.
This error did not impact the limiting PCT. Modified Analysis Approach (2). The performance of a specific action under the modified analysis A2 +0 approach is overly conservative.
This error did not impact the limiting PCT. Modified Analysis Approach (3). The time when a specific action under the modified analysis A2 +0 approach began might be incorrectly reported in the documentation of the calculation.
The error did not impact the time used in any of the MNGP LOCA calculations.
L-MT-16-071 Enclosure 2 Page 2 of 4 TABLE 1 -
SUMMARY
OF MONTICELLO LOCA CHANGES AND ERRORS INVOLVING CHANGES IN PEAK CLADDING TEMPERATURE (PCT) FOR AREVA 1 OXM FUEL Licensing Applicable Analysis or Error/Change Description Ref. Basis PCT(°F) 10XM Low Pressure Coolant Injection (LPCI) Loop Selection Logic. Relates to an input error when modeling breaks smaller than 0.4 ft2. MNGP has instrumentation and logic to detect which recirculation line contains a break. When a break is detected, the logic injects all LPCI flow into the recirculation line that does not contain the break and closes the discharge isolation valve in that same recirculation line. If a break is not detected, the LPCI A2 +0 flow is injected and the discharge isolation valve is closed in a predefined recirculation line. LOCA analyses for breaks smaller than 0.4 ft2 conservatively assumed the break was in the recirculation line that was predefined to receive the LPCI flow and should have closed the discharge isolation valve in the same recirculation line. Instead, the discharge isolation valve was modeled as closing in the intact recirculation line. End of Slowdown.
A modeling assumption was made that could result in an error in the time when rated Low Pressure Core Spray (LPCS) is reached. The time when rated LPCS flow is reached is used in two parts of the LOCA calculation and it relates to the use of the A2 -5 modified analysis approach.
This error did cause a small change in the time when the heat transfer coefficients in the heatup calculation change from the calculated values to the values specified in 10 CFR 50 Appendix K. Modeling Assumption for Time of Bypass Reflood. A modeling assumption could result in an error in the time of A2 +0 bypass reflood. The time of bypass reflood is the time the heat transfer coefficient beneath the bypass mixture level is set to 25 Btu/hr-ft2 -°F.
L-MT-16-071 Enclosure 2 Page 3 of 4 TABLE 1-
SUMMARY
OF MONTICELLO LOCA CHANGES AND ERRORS INVOLVING CHANGES IN PEAK CLADDING TEMPERATURE (PCT) FOR AREVA 10XM FUEL Licensing Applicable Analysis or Error/Change Description Ref. Basis PCT(°F) 10XM Using End-of-Slowdown (EOB) Time for Selecting HUXY Boundary Conditions.
At the EOB (which is the time of rated core spray), the hottest axial slab in the RELAX hot channel calculation is identified.
This establishes the boundary conditions that are passed into the A2 +0 HUXY calculation.
While this is appropriate under some conditions when the slabs continue to heat up after EOB, it may not be appropriate for other conditions when the EOB time is much later and the nodes have cooled down. Pressure Permissive for Closing Recirculation Discharge Isolation Valve (RDIV) during Single Loop Operation (SLO). Monticello has two recirculation lines. Each line has a location for injecting LPCI flow and a RDIV on the discharge side of the recirculation pump. Monticello also has Loop Selection Logic which will route all of the LPCI flow to the unbroken loop and close the RDIV in the same loop. During SLO the pressure must be less than or equal to 900 psig A3 +0 before the RDIV will begin to close. This pressure permissive during SLO was not modeled in the SLO LOCA calculations.
Evaluations were performed that indicate modeling the pressure permissive would not impact the limiting SLO break. This issue does not impact a LOCA initiated during Two-Loop Operation (TLO) because the RDIV pressure permissive is modeled correctly.
Therefore, this issue has zero impact on the limiting PCT. Sum of absolute value of changes for the current reporting period, which +0 includes all changes since the 10 CFR 50.46 report. Sum of absolute value of changes since last AOR. 5 Algebraic sum of changes for the current reporting period, which includes +0 all changes since the 10 CFR 50.46 report. Algebraic sum of changes since last AOR. -5 Current Adjusted Peak Cladding Temperature
<2083 L-MT-16-071 Enclosure 2 Page 4 of 4 TABLE 1 -
SUMMARY
OF MONTICELLO LOCA CHANGES AND ERRORS INVOLVING CHANGES IN PEAK CLADDING TEMPERATURE (PCT) FOR AREVA 1 OXM FUEL References A1. AREVA Report ANP-3212(P)
Revision 0, "Monticello EPU LOCA-ECCS Analysis MAPLHGR Limits for ATRIUMŽ 10XM Fuel," AREVA NP, May 2013 (Enclosure 20 of NSPM letter to NRC, "License Amendment Request for Transition to AREVA ATRIUM 10XM Fuel and AREVA Safety Analysis Methodology," L-MT-13-055, dated July 15, 2013 A2. AREVA Report FS1-0026440 Revision 1, "Monticello 10 CFR 50.46 PCT Reporting Estimates for ATRIUM 10XM Fuel," approved May 13, 2016 A3. AREVA Report FS1-0029081 Revision 1, "Monticello 10 CFR 50.46 PCT Reporting Estimates for ATRIUM 10XM Fuel-Through July 2016," approved October 12, 2016