Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
DOCKET N 05000335 05000389 gc Cp~RATZD Dl BUTION DEMONSTR 0.'i SYSTEM I REGULATOR1 NFORMATION DISTRIBUTION S 2EM (RIDS)ACCESSION NBR:9002260449 DOC.DATE: 90/01/31 NOTARIZED:
NO FACIL:50-335 St.Lucie Plant, Unit 3florida Power 6 Light Co.50-389 St.Lucie, Plant, Unit 2, Florida Power 6 Light Co.AUTH.NAME AUTHOR AFFILIATION BONETT,D.M.
Florida Power a Light Co.SAGER,D.A.
Florida Power a Light Co.RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for Jan 1990 for St Lucie Units 1 6 2.W/900215 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR g ENCL g SIZE: (0 TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-2 LA NORRISPJ INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 EP PRPB11 ,RE FILE 01 EXTERNAL: EG&G SIMPSONPF NRC PDR COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 NCTE IO ALL"RIDS" RECIPZEÃIS'LEASE HELP US IO iKDUCE HASTE!CXNI'ACZ'IHE IXXXlMERX'XKIBDL DESK RDCN Pl-37 (EXT.20079)IO EIZMQQZE%SR MIME PBCH DIPX%UEOTIGR LISTS MR DOCUMENIS YOU DCRPT NEED)TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29 0-e P.O.Box14000, Juno Beach, FL 33408-0420 FEBRUARY 1 5$999 L-90-53 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
RE: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the January 1990 Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Very truly yours, D.A.er Vice sident St.Luc e Plant DAS/DMB Attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant 9002260449 g0013i PDR ADOCK 05000335 R PNU an FPL Group company l IP I i(f
~~AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-335 UNIT St.Lucie 1 DATE Februar 15 1990 COMPLETED BY D.M.Bonett TELEPHONE 407 694-4432 MONTH Zanua 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)~, 1/1/90 1/2/90 1/3/90 l/4/90 il 5/90 1/6/90 il 7/90 l/8/90 1/9/90 l/18/90 1/11/90 1/12/90 1/13/90 1/14/90 1/15/90 l/16/90 1/17/90 1/18/90 1/19/90 l/28/90 l/21/90 1/22/90 l/23/90 1/24/90 1/25/90 1/26/90 1/27/90 1/28/90 l/29/90 l/38/90 1/31/90 858 858 863 867 842 765 869 868 866 864 836 778 868 878 878 868 866 865 863 861 859 32-19-20-12-4-3-3-3-3-3 OPERATING STATUS QF'ERATIHG DATA REPORT DQCI(ET NO 50-335 DATE 2/15/9()COMPLETED BY Do N+BQHI=TT ,TELEPHONE 4<)7/694/4432 UNIT NAME l ST.LUCIE UNIT 1 2.RI=PQRTING PERIOD+J*NUARY l 990 3i LICENSED THERMAL POWER<NHT)o 2700 4+HAMI=PLATE RATING (GROSS MWE)i 858 5 i DESTGH ELECTRICAL RATING (HET MHE)+838 6 MAXTNUM DEPENDABLE CAF'ACXTY (GROSS NHE)l 872 7+MAXIMUM DEPFHDABLE CAP*CXTY (NET MHE)o 839 8, IF CHANCES OCCUR IN, CAPACITY RATINGS (ITENS NUMBER 3 THROUGH 7)SINCE LAST REF'QRT~GIVE RFASONS l POHER LEVEL TO RHXCI-I RESTRICTED
~IF ANY (NET MHE)10, REASONS FOR RESTRXCTXONSr IF AMYL'ONTHLY
-YTD-CUMULATIVE iii I-IOURS IH REPORT PERIOD)12.NUMBER OF HOURS RE*CTOR HAS CRXTICAL 13, REACTQI RESERVE SHUTDOWN HOURS 14'OURS GENERATOR ON-LINE 15'NIT RI=SERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MHH)17.GROSS ELECTRIC*L ENERGY GENERATED (MWH)18 HET ELECTRICAL ENERGY GENERATED<MHH)19.UNIT SERVICE FACTOR 28 i UNXT*VA'ILABILXTY FACTOR 21.CAF'ACXTY FACTOR (USIHG MDC NET)22, CAF'ACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24'HUTDOWNS SCI.IEDULED OVER NEXT 6 NQHTHS 1/22/90 7 REFUEI ING 744 5er,o 0+0 586+9 0+0 l348855 454310 429093 68+1 688+7 69+5 Zt3 744 507 i 0 OiO 586 i 9 0+0 1348855 454310 429093 68+1 68ii 68+7 69+5 Zt3'114960 i 0 87895+6.ZeS 3 87143+9 39+3 224306495 73897380 69827958 8 75+8 75i6 74+3 3+5 25 XF SHUT DOWN AT END OF RFPORT I='ERIOD~ESTIMATED DATE OF STARTUI=':
4/21/90
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Januar 1990 DOCKET NO.UNIT NAME DATE Februar 15, 1990 COMPLETED BY 0.M.Bonett TELEPHONE Date Type Duration (Hours)Reason~Method of Shutting Down Reactor Licensee Event Report¹System Code4 Component Code~Cause&Corrective Actionto Prevent Recurrence Ol 900122 12.1 CC HTEXCH Unit 1 was shutdown to repair a tube leak in the 1B Steam Generator.
02 900122 225.0 RC FUELXX During the investigation into the 1B Steam Generator leak, a decision-:was made to begin the scheduled refueling and maintenance outage.F Forced S Scheduled 2 Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error(Explain)
H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other(Explain)
Exhibit G-Instructions for Preparation of Data Entry Scheets Licensee Event Report(LER)
File (NUREG-0161)
Exhibit1-Same Source
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50-335 UNIT St.Lucie 1 DATE February 15, 1990 COMPLETED BY D.M.Bonett TELEPHONE 407 694-4432 REPORT MONTH Zanua 1990 Unit 1 was shutdown to repair a tube leak in the 1B Steam Generator.
During the investigation into the 1B Steam Generator leak, a decision was made to begin the scheduled refueling and maintenance outage.In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-389 UNIT St.Lucie 2 DATE Februar 15 1990 COMPLETED BY D.M.Bonett TELEPHONE 407 694-4432 MONTH Zanua 1990 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)1/1/90 1/2/90 1/3/90 1/4/90 1/5/90 l/6/90 1/7/90 1/8/90 1/9/90 l/ie/90 1/11/90 1/12/90 1/13/90 1/14/90 1/15/90 1/16/90 1/17/90 1/18/90 1/19/90 1/ze/9e 1/Zi/90 1/Z2/9e 1/Z3/90 1/24/90 1/25/90 l/26/90 1/27/90 1/28/90 l/Z9/90 l/3e/9e 1/31/90 856 828 716 597-24-9-9-9-9-9-11-I4-26-13-34 144 598 772 857 859 859 851 859 86e 86e 859 860 86e 860 861 859 OPERATXNG STATUS OPERATXNG DATA REPORT DOCI(ET NQ 50-389 DATE 2/l5 r9e COMPLETED BY D, M, BQNETT TELEPI.IONE 4e71'694/4432 io UNXT NAMEi STi LUCXE UNXT 2 2, RI=PORTXNG PERXOD: JANUARY 199e 3, LXCENSED THERMAL POWER (MWT)'7ee 4i NAMEPLATE RATXNG (GROSS MWE)+850 5+DESXGN ELECTRXCAL RATTNG (NET MWE)+83e bi MAXXMUM DEPFNDABLE CAPACITY (GROSS MWE)e 882 7i MAXXMUM DEPENDABLE CAPACITY (NET MWE)o 839 8 XF CHANGES OCCUI'N CAPACXTY RATXNGS (XTEMS NUMBER 3 THROUGI-I 7)SXNCE LAST REPORT GIVE REASONS: '9i POWER LEVEL TO WKXCI-I RESTRXCTEDr XF ANY (NET MWE)ie.REASONS FOR RESTRXCTXONSr XF ANY: MONTHLY-YTD-CUMULATXVE iii HOURS XN REPORT PERXQD: 1Z, NUMBER QF I-IOURS REACTOR WAS CRXTXCAL 13, REACTOR RESERVE SHUTDOWN HOUI'S 14.I.IOURS GENERATOR QN-LXNE 15.UNXT RESERVE SHUTDOWN HOURS ibo GROSS THERMAL ENERGY GENERATED (MWH)17, GROSS ELI=CTRXCAL ENERGY GENERATED (MWH)18'ET ELECTRXCAL ENERGY GENERATED (MWH)19, UNXT SI=RVXCE FACTOR zeo UNXT AVAXLABXLXTY FACTOR Zi, CAr-ACXTV FhCTQR (USXNG MDC NET)22, CAPACXTY FACTOR (USXNG DER NET)23 UNXT FORCED OUTAGE RATE 24 o SHUTDOWNS SCI.IEDULED OVER NEXT 6 MONTI.IS 744 e4 eie 465 z eie 1191237 398360 371911 62+5 62+5 59ib be+2 37t5 744 5e4i5 eie 465iz eie 1191237 398360 371911 bzi5 bzi5 5'9+6 benz 37t5 56857+e 48673+4 ewe 47819i9 ewe 124988633 41650270 39385025 84+1 84+1 84ib 84 i 4 5i8 25.XF SHUT DOWN AT END OF REPORT PEI"XOD ESTXMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Januar 19 TELEPHONE DOCKET NO.UNiT NAME St.Luc 1 e¹2 DATE Februar 15, 1990 COMPLETED By D.M.Bonett No.Date Type'uration (Hours)Reason~Method of Shutting Down Reactor Ucensee Event Report¹System Code4 Component Codes Cause 8c Corrective Actionto Prevent Recurrence 01 900104 02 900114 239.5 0.0 N/A N/A CB VALVEX WG INSTRU Unit 2 was shutdown for minor leak repairs to two valves in the pressurizer cubicle area.During the return to power, following the repair of the pressurizer valves, the unit was held at approximately 205 power due to a problem with the Main Feedwater Regulating Valve Level Transmitter LT-9011.03 900114 39.3.50-389-90-01 WG MECFUN During the return to full power, the reactor was tripped due to an operator error.While off line, a problem with the 2C Auxiliary Feed-ater Governor Valve was investigated and repaired.F Forced S Scheduled 2 Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-ManualScram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Scheets Licensee Event Report(LER)
File (NUREG4161)
Exhibit 1-Same Source I J UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Januar 1990 DOCKET NO.UNrr NAME St DATE Februar 15 1990 COMPLETED BY TELEPHONE Date Type'uration (Hours)Reason2 Method of Shutting Down Reactor Ucensee Event Report iti System Code4 Component Codes Cause&Corrective Actionto Prevent Recurrence 04 05 900116 900116 0.0 0.0 N/A N/A HA TURBIN HJ PUt1PXX The ascent to full power was resumed following a turbine performance test.Unit 2 was held at approxifhately 70K power for the repair of the 2A Turbine Cooling Water Pump Mechanical Seal.Full power operation was resumed.F Forced S Scheduled Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-ManualScram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other(Explain) 4 Exhibit G-instructions for Preparation of Data Entry Scheets Licensee Event Report(LER)
File (NURE&0161)Exhibit1-Same Source H lt~I'
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.50-389 UNIT St.Lucie 2 DATE Februar 15 1990 COMPLETED BY D.M.Bonett TELEPHONE 407 694-4432 REPORT MONTH Zanua 1990 See the"Unit Shutdowns and Power Reductions" sheet for details.In accordance with requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.