Similar Documents at Cook |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17335A5201999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp Unit 1.With 990208 Ltr ML17335A5191999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Dccnp,Unit 2.With 990208 Ltr ML17335A4831998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 2.With 990108 Ltr ML17335A4841998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for DC Cook Nuclear Plant,Unit 1.With 990108 Ltr ML17335A3951998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 2.With 981207 Ltr ML17335A3941998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for DC Cook Nuclear Plant,Unit 1.With 981207 Ltr ML17335A3331998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Plant,Unit 1.With 981105 Ltr ML17335A3381998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for DC Cook Nuclear Power,Unit 2.With 981105 Ltr ML17335A2931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 2.With 981005 Ltr ML17335A2941998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for DC Cook Nuclear Plant,Unit 1.With 981005 Ltr ML17335A2131998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 2.W/980903 Ltr ML17335A2151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for DC Cook Nuclear Plant,Unit 1.W/980903 Ltr ML17335A1741998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 2.W/980806 Ltr ML17335A1731998-07-31031 July 1998 Monthly Operating Rept for July 1998 for DC Cook Nuclear Plant Unit 1.W/980806 Ltr ML17334B8171998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Plant Unit 2.W/980706 Ltr ML17334B8131998-06-30030 June 1998 Monthly Operating Rept for June 1998 for DC Cook Nuclear Station,Unit 1.W/980706 Ltr ML17334A7511998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 2.W/980609 ML17334A7521998-05-31031 May 1998 Monthly Operating Rept for May 1998 for DC Cook Nuclear Plant,Unit 1.W/980609 Ltr ML17334B7921998-04-30030 April 1998 Addendum to Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Station,Unit 2 ML17334B7721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for DC Cook Nuclear Plant,Unit 1.W/980506 Ltr ML17334B7911998-03-31031 March 1998 Addendum to Monthly Operating Rept for Mar 1998 for DC Cook Nuclear Plant,Unit 2 ML17334B7171998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980407 Ltr ML17334B7181998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980407 Ltr ML17334A6831998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 2.W/980309 Ltr ML17334A6811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Donald C Cook Nuclear Plant,Unit 1.W/980309 Ltr ML17334B7901998-02-28028 February 1998 Addendum to Monthly Operating Rept for Feb 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6481998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2.W/980209 Ltr ML17334B7891998-01-31031 January 1998 Addendum to Monthly Operating Rept for Jan 1998 for DC Cook Nuclear Plant,Unit 2 ML17334A6051997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 2 ML17334A6021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Donald C Cook Nuclear Plant,Unit 1.W/980108 Ltr ML17334B6711997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 2.W/971208 Ltr ML17334A6061997-11-30030 November 1997 Revised Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Station,Unit 2 ML17334B6651997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for DC Cook Nuclear Plant,Unit 1.W/971208 Ltr ML17333B1421997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Donald C Cook Nuclear Plant,Unit 1.W/971110 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17335A5641999-10-18018 October 1999 LER 99-024-00:on 990708,literal TS Requirements Were Not Met by Accumlator Valve Surveillance.Caused by Misjudgement Made in Conversion from Initial DC Cook TS to W Std Ts.Submitted License Amend Request.With 991018 Ltr ML17335A5531999-10-0707 October 1999 LER 99-023-00:on 990907,inadequate TS Surveillance Testing of ESW Pump ESF Response Time Noted.Caused by Inadequate Understanding of Plant Design Basis.Surveillance Tests Will Be Revised & Implemented ML17335A5631999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 1.With 991012 Ltr ML17335A5621999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for DC Cook Nuclear Plant,Unit 2.With 991012 Ltr ML17335A5481999-09-30030 September 1999 Non-proprietary DC Cook Nuclear Plant Units 1 & 2 Mods to Containment Sys W SE (Secl 99-076,Rev 3). ML17335A5451999-09-28028 September 1999 Rev 1 to Containment Sump Level Design Condition & Failure Effects Analysis for Potential Draindown Scenarios. ML17326A1291999-09-17017 September 1999 LER 99-022-00:on 990609,electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads,Was Discovered. Caused by Lack of Understanding of Design of Plant.No Immediate Corrective Actions Necessary ML17326A1481999-09-17017 September 1999 Independent Review of Control Rod Insertion Following Cold Leg Lbloca,Dc Cook,Units 1 & 2. ML17326A1211999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 2.With 990915 Ltr ML17326A1201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Cook Nuclear Plant, Unit 1.With 990915 Ltr ML17326A1121999-08-27027 August 1999 LER 99-021-00:on 990728,determined That GL 96-01 Test Requirements Were Not Met in Surveillance Tests.Caused by Failure to Understand Full Extent of GL Requirements. Surveillance Procedures Will Be Revised or Developed ML17326A1011999-08-26026 August 1999 LER 99-020-00:on 990727,EDGs Were Declared Inoperable.Caused by Inadequate Protection of Air Intake,Exhaust & Room Ventilation Structures from Tornado Missile Hazards. Implemented Compensatory Measures in Form of ACs ML17326A0911999-08-16016 August 1999 LER 99-019-00:on 990716,noted Victoreen Containment Hrrms Not Environmentally Qualified to Withstand post-LOCA Conditions.Caused by Inadequate Design Control.Reviewing Options to Support Hrrms Operability in Modes 1-4 ML17326A0771999-08-0404 August 1999 LER 98-029-01:on 980422,noted That Fuel Handling Area Ventilation Sys Was Inoperable.Caused by Original Design Deficiency.Radiological Analysis for Spent Fuel Handling Accidents in Auxiliary Bldg Will Be Redone by 990830 ML17335A5461999-08-0202 August 1999 Rev 0 to Evaluation of Cook Recirculation Sump Level for Reduced Pump Flow Rates. ML17326A0871999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Unit 1.With 990812 Ltr ML17326A0861999-07-31031 July 1999 Monthly Operating Rept for July 1999 for DC Cook Nuclear Plant,Units 2.With 990812 Ltr ML17326A0741999-07-29029 July 1999 LER 99-018-00:on 990629,determined That Valve Yokes May Yield Under Combined Stress of Seismic Event & Static,Valve Closed,Stem Thrust.Caused by Inadequate Design of Associated Movs.Operability Determinations Were Performed for Valves ML17326A0661999-07-26026 July 1999 LER 99-017-00:on 990625,noted That Improperly Installed Fuel Oil Return Relief Valve Rendered EDG Inoperable.Caused by Personnel Error.Fuel Oil Return Valve Was Replaced with Valve in Correct Orientation.With 990722 Ltr ML17326A0651999-07-22022 July 1999 LER 98-014-03:on 980310,noted That Response to high-high Containment Pressure Procedure Was Not Consistent with Analysis of Record.Caused by Inadequate Interface with W. FRZ-1 Will Be Revised to Be Consistent with New Analysis ML17326A0491999-07-13013 July 1999 LER 99-016-00:on 990615,TS Requirements for Source Range Neutron Flux Monitors Not Met.Caused by Failure to Understand Design Basis of Plant.Procedures Revised.With 990713 Ltr ML17326A0331999-07-0101 July 1999 LER 99-004-01:on 971030,failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed Was Noted.Caused by Ineffective Mgt of Tss.Chemistry Personnel Have Been Instructed on Requirement to Follow TS as Written ML17326A0511999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 2.With 990709 Ltr ML17326A0501999-06-30030 June 1999 Monthly Operating Rept for June 1999 for DC Cook Nuclear Plant,Unit 1.With 990709 Ltr ML17326A0151999-06-18018 June 1999 LER 99-014-00:on 990521,determined That Boron Injection Tank Manway Bolts Were Not Included in ISI Program,Creating Missed Exam for Previous ISI Interval.Caused by Programmatic Weakness.Isi Program & Associated ISI Database Modified ML17325B6421999-06-0101 June 1999 LER 99-013-00:on 990327,safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Have Led to ECCS Pump Failure.Caused by Inadequate Original Design Application of Si.Throttle Valves Will Be Developed ML17325B6311999-06-0101 June 1999 LER 99-S03-00:on 990430,vital Area Barrier Degradation Was Noted.Caused by Inadequate Insp & Maint of Vital Area Barrier.Repairs & Mods Were Made to Barriers to Eliminate Degraded & Nonconforming Conditions ML17326A0061999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr ML17326A0071999-05-31031 May 1999 Monthly Operating Rept for May 1999 for DC Cook Nuclear Plant,Unit 2.With 990609 Ltr ML17325B6351999-05-28028 May 1999 LER 99-S02-00:on 990428,vulnerability in Safeguard Sys That Could Allow Unauthorized Access to Protected Area Was Noted. Caused by Inadequate Original Plant Design.Mods Were Made to Wall Opening to Eliminate Nonconforming Conditions ML17265A8231999-05-24024 May 1999 LER 98-037-01:on 990422,determined That Ice Condenser Bypass Leakage Exceeds Design Basis Limit.Caused by Pressure Seal Required by Revised W Design Not Incorporated Into Aep Design.Numerous Matl Condition Walkdowns & Assessments Made ML17325B6001999-05-20020 May 1999 LER 99-012-00:on 990420,concluded That Auxiliary Bldg ESF Ventilation Sys Not Capable of Maintaining ESF Room Temps post-accident.Caused by Inadequate Control of Sys Design Inputs.Comprehensive Action Plan Being Developed ML17325B5861999-05-10010 May 1999 LER 99-002-00:on 990415,discovered That TS 4.0.5 Requirements Were Not Met Due to Improperly Performed Test. Caused by Incorrect Interpretation of ASME Code.App J Testing Will Be Completed & Procedures Will Be Revised ML17325B5811999-05-0404 May 1999 LER 99-011-00:on 990407,air Sys for EDG Will Not Support Long Operability.Caused by Original Design Error.Temporary Mod to Supply Makeup Air Capability in Modes 5 & 6 Was Prepared ML17325B5771999-05-0303 May 1999 LER 99-010-00:on 990401,RCS Leak Detection Sys Sensitivity Not in Accordance with Design Requirements Occurred.Caused by Inadequate Original Design of Containment Sump Level. Evaluation Will Be Performed to Clearly Define Design ML17335A5301999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr ML17335A5291999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 2.With 990508 Ltr ML17325B5581999-04-16016 April 1999 LER 99-006-00:on 990115,personnel Identified Discrepancy Between TS 3.9.7 Impact Energy Limit & Procedure 12 Ohp 4030.STP.046.Caused by Lack of Design Basis Control.Placed Procedure 12 Ohp 4030.STP.046 on Administrative Hold ML17325B5471999-04-12012 April 1999 LER 99-009-00:on 990304,as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit Occurred.Cause Investigation for Condition Has Not Been Completed.Update to LER Will Be Submitted,Upon Completion of Investigation ML17325B5321999-04-0707 April 1999 LER 99-S01-00:on 990308,discovered That Lock for Vital Gate Leading to Plant 4KV Switchgear Area Was Nonconforming & Vulnerable to Unauthorized Access.Caused by Inadequate Gate Design & Inadequate Procedures.Mods Are Being Made to Gate ML17325B5161999-04-0101 April 1999 LER 99-007-00:on 981020,calculations Showed That Divider Barrier Between Upper & Lower Containment Vols Were Overstressed.Engineers Are Currently Working on Analyses of Loads & Stress on Enclosures ML17325B5491999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr ML17325B5441999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant,Unit 1.With 990408 Ltr ML17325B5221999-03-29029 March 1999 LER 99-001-00:on 960610,degraded Component Cooling Water Flow to Containment Main Steam Line Penetrations,Identified on 990226.Caused by Inadequate Understanding of Design Basis.Additional Investigations Ongoing ML17325B4801999-03-18018 March 1999 LER 99-004-00:on 971030,failure to Perform TS Surveillance Analyses of Rc Chemistry with Fuel Removed Was Noted.Cause of Event Is Under Investigation.Corrected Written Job Order Activities Used to Control SD Chemistry Sampling ML17325B4741999-03-18018 March 1999 LER 99-005-00:on 940512,determined That Rt Breaker Manual Actuations During Rod Drop Testing Were Not Previously Reported.Caused by Lack of Training.Addl Corrective Actions,Including Preventative Actions May Be Developed ML17325B5671999-03-0202 March 1999 Summary of Unit 1 Steam Generator Layup Chemistry from 980101 to 990218. ML17325B4631999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Power Station,Unit 2.With 990308 Ltr ML17325B4621999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for DC Cook Nuclear Plant,Unit 1.With 990308 Ltr ML17325B4571999-02-24024 February 1999 LER 99-003-00:on 990107,CR Pressurization Sys Surveillance Test Did Not Test Sys in Normal Operating Condition.Caused by Failure to Recognize Door 12DR-AUX415 as Part of CR Pressure Boundary.Performed Walkdown of Other Doors 1999-09-30
[Table view] |
Text
Mgmn, MI 491 06 616465 5901 Z INDMNA.NlCHIGAN POWER September 15, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager: Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for August 1999 is submitted.
A.Christopher Bakken, III Site Vice President ACB/bwo Attachment NRC Region III NRC Project Manager-NRR NRC Resident Inspector ANI Nuclear Engineering Department INPO Records Center R.C.Godley G.T.Gaffney-Canton D.R.Hahn-Department of Health S.Hamming-Department of Labor G.John B.Lewis-McGraw-Hill Companies D.H.Maiin T.P.Noonan D.W.Paul-Lancaster J.E.Pollock R.P.Powers Regulatory Licensing Manager M.W.Rencheck W.H.Schalk D.G.Turner~~p: anreeirrr eZrreri,r r'rrrrrree"'
~~
N.R.C.OPERATING DATA REPORT DOCKET NO.DATE COMPLETED BY TELEPHONE 50-316 September 1, 1999 M.M.Pratt 616465-5901 OPERATING STATUS 1.Unit Name D.C 2.Reporting Period 3.Licensed Thermal Power (MWt).4.Name Plate Rating (Gross MWe)5.Design Electrical Rating (Net MWe)6.Maximum Dependable Capacity (GROSS MWe)7.Maximum Dependable Capacity (Net MWe)Cook Unit 2 Aug-99 3411 1133 1090 1100 1060 Notes: 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons:.9.Power Level to Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Gen.(MWH)17.Gross Electrical Energy Gen.(MWH)18.Net Electrical Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 5832.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 190362.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 62.8 62.8 57.2 55.7 22.5 24.Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None 25.If Shut Down At End of Report Period, Estimated Date of Startup: April 2000 26.Units in Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION'orecast Achieved DOCKET NO.UNIT NAME DATE~COMPLETED BY TELEPHONE 50-316 D.C.Cook'Unit 2 September 1, 1999 M.M.Pratt 616-465-5901 AVERAGE DAILY POWER LEVEL (MWe-Net)August 1999 DAY 8/1/99 8/2/99 8/3/99 8/4/99 8/5/99 8/6/99 8/7/S9 8/8/99 8/9/99 8/10/99 8/11/99 8/12/99 8/13/99 8/14/99 8/15/99 8/16/99 AVERAGE DAILY POWER LEVEL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DAY 8/17/99 8/18/99 8/19/99 8/20/99 8/21/99 8/22/99 8/23/99 8/24/99 8/25/99 8/26/99 8/27/99 8/28/99 8/29/99 8/30/99 8/31/99 AVERAGE DAILY POWER LEVEL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook Unit 2 September 4, 1999 S.A.Richardson 61&465-5901 1 of1 MONTHLY OPERATING ACTIVITIES
-August 1999 HIGHLIGHTS The unit entered this reporting period with the core offloaded.
The unit exited this reporting period with the core offloaded.
There were no challenges to the pressurizer safety valves or power operated relief valves.Gross electrical generation for the month of August was 0 MWh.'ETAILS'8/01/99 At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> Train B Emergency Diesel Generator is declared operable for Modes 5 and 6.Inadequacy of design on combustion air intake, combustion exhaust, ventilation intake and exhaust structures in relation to tornado generated missiles has been addressed.
Compensatory measures have been placed into effect via administrative controls.Train A diesel generator remains inoperable pending resolution of governor control problems and load rejection testing.08/10/99 At 0004 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Train A Emergency Diesel Generator is declared operable as governor control problems are resolved and all surveillance testing associated with it is completed satisfactorily.
08/10/99 At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> Train B Emergency Diesel Generator is declared inoperable to allow 18 month frequency planned maintenance work packages.08/10/99 At 1545 hours0.0179 days <br />0.429 hours <br />0.00255 weeks <br />5.878725e-4 months <br /> Train B AC electrical busses are declared inoperable to allow planned maintenance on electrical switchgear and bus work.08/29/99 At 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br /> Train A Emergency Diesel Generator is declared inoperable for Modes 5 and 6.The meteorological monitoring system (MIDAS)is not available in the Unit 1 Control Room hence the ability to anticipate tornado winds is diminished.
Per administrative controls associated with design deficiencies on diesel air intake and exhaust structures the diesel must be declared inoperable and fuel movement suspended.
08/29/99 At 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br /> Train A Emergency Diesel Generator is declared operable for Modes 5 and 6.The meteorological monitoring system (MIDAS)is made available in the Unit 1 Control Room hence the ability to anticipate tornado winds is restored.'ll time entries are Eastern Standard Time (EST).
DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook Unit 2.September 4, 1999 S.A.Richardson 616-465-5901 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS
-August 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.DATE TYPE'OURS REASON~REACTOR3 REPORT NO.CODEi CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F 334 101397 S 335 010798 F 162.0 582.0 744.0 97-003 97-004 97-005 N/A N/A N/A N/A N/A N/A N/A N/A The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)Inspection.
The scheduled refueling outage commenced while the unit has been shutdown to resolve design basis questions discovered during the NRC AE Inspection.
The unit remained shutdown to resolve design basis questions identified during the NRC Architect and Engineering (AE)l Inspection.
1 TYPE: F: Forced S: Scheduled 2 REASON: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 METHOD: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)4 SYSTEM: Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 0161)5 COMPONENT:
Exhibit I: Same Source CATEGORY REGULATvBY INFORMATION DISTRIBUTIO SYSTEM (RIDS)FACIL:50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M TRUTH.NAPPE AUTHOR AFFILIATION PRATTfM>M<, Indiana Michigan Power Co.RICHARDSON,S.A.
Indiana Michigan Power Co.BAKKEN,A.C.
Indiana Michigan Power Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000316
SUBJECT:
Monthl erati Unit 2.With 990915 ltr.NOTES: for Aug 1999 for Cook Nuclear Plant, DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR (ENCL i SIZE: TITLE: Monthly Operating Report (per Tech Specs)E RECIPIENT ID CODE/NAME STANG,J COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME COPIES LTTR ENCL 0 INTERNAL:<FILE CENTER Ol 1 MES/ERAA./OERAB~
I EXTERNAL: LMITCO MARSHALL 1 NRC PDR'OC/DBA/PAD RGN3 NOAC 1 1 1 1 1 1 D NII~II~III E NOTE TO ALL"RZDS" RECIPZENTS:
PLEASE HELP US TO REDUCE WASTETH TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER-OF.COPIES REQUIRED: LTTR 8 ENCL 8 M(49106 61 6 465 5901 FI INQIAiM NICNICQN PQWM September 15, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Document Control Manager: Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.8, the attached Monthly Operating Report for August 1999 is submitted.
Sincerely, A.Christopher Bakken, III Site Vice President ACB/bwo Attachment NRC Region III NRC Project Manager-NRR NRC Resident Inspector ANI Nuclear Engineering Department INPO Records Center R.C.Godley G.T.Gaffney-Canton D.R.Hahn-Department of Health S.Hamming-Department of Labor G.John B.Lewis-McGraw-Hill Companies D.H.Malin T.P.Noonan D.W.Paul-Lancaster J.E.Pollock R.P.Powers Regulatory Licensing Manager M.W.Rencheck W.H.Schalk D.G.Turner 99092i0297 99083i PDR ADOCK 050003ih R PDR AFP:<<fmeriea's
/;rregl'/'artrrer N.R.C.OPERATING DATA REPORT DOCKET NO.DATE COMPLETED BY TELEPHONE 50-316 September 1, 1999 M.M.Pratt 616-465-5901 D.C.Cook Unit 2 Aug-99 3411 1133 1090 We)1100 1060 OPERATING STATUS 1.Unit Name 2.Reporting Period 3.Licensed Thermal Power (MWt)4.Name Plate Rating (Gross MWe)5.Design Electrical Rating (Net MWe)6.Maximum'ependable Capacity (GROSS M 7.Maximum Dependable Capacity (Net MWe)Notes: 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons: 9.Power Level to Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Gen.(MWH)17.Gross Electrical Energy Gen.(MWH)18.Net Electrical Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate This Month 744.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 5832.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 190362.0 121771.0 0.0 118153.4 0.0 366007650.4 118584640.0 114257779.0 62.8 62.8 57.2 55.7 22.5 24.Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None 25.If Shut Down At End of Report Period, Estimated Date of Startup: Apn'I 2000 26.Units in Test Status (Prior to Commercial Operation):
Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-316 D.C.Cook Unit 2 September 1, 1999 M.M.Pratt 616-465-5901 AVERAGE DAILY POWER LEVEL (MWe-Net)August 1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 8/1/99 8/2/99 8/3/99 8/4/99 8/5/99 8/6/99 8/7/99 8/8/99 8/9/99 8/1 0/99 8/11/99 8/12/S9 8/13/99 8/14/99 8/1 5/99 8/16/99 8/17/99 8/18/99 8/19/99 8/20/99 8/21/99 8/22/99 8/23/99 8/24/99 8/25/99 8/26/99 8/27/99 8/28/99 8/29/99 8/30/99 8/31/99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 lf I tl I 8I I DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook Unit 2 September 4, 1999 S.A.Richardson 616465-5901 1 of1 MONTHLY OPERATING ACTIVITIES
-August 1999 HIGHLIGHTS The unit entered this reporting period with the core oNoaded.The unit exited this reporting period with the core offloaded.
There were no challenges to the pressurizer safety valves or power operated relief valves.Gross electrical generation for the month of August was 0 MWh.DETAILS'8/01/99 At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> Train B Emergency Diesel Generator is declared operable for Modes 5 and 6.Inadequacy of design on combustion air intake, combustion exhaust, ventilation intake and exhaust structures in relation to tornado generated missiles has been addressed.
Compensatory measures have been placed into effect via administrative controls.Train A diesel generator remains inoperable pending resolution of governor control problems and load rejection testing.08/10/99 At 0004 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> Train A Emergency Diesel Generator is declared operable as governor control problems are resolved and all surveillance testing associated with it is completed satisfactorily.
08/10/99 At 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> Train B Emergency Diesel Generator is declared inoperable to allow 18 month frequency planned maintenance work packages.08/10/99 At 1545 hours0.0179 days <br />0.429 hours <br />0.00255 weeks <br />5.878725e-4 months <br /> Train B AC electrical busses are declared inoperable to allow planned maintenance on electrical switchgear and bus work.08/29/99 At 0530 hours0.00613 days <br />0.147 hours <br />8.763227e-4 weeks <br />2.01665e-4 months <br /> Train A Emergency Diesel Generator is declared inoperable for Modes 5 and 6.The meteorological monitoring system (MIDAS)is not available in the Unit 1 Control Room hence the ability to anticipate tornado winds is diminished.
Per administrative controls associated with design deficiencies on diesel air intake and exhaust structures the diesel must be declared inoperable and fuel movement suspended.
08/29/99 At 0730 hours0.00845 days <br />0.203 hours <br />0.00121 weeks <br />2.77765e-4 months <br /> Train A Emergency Diesel Generator is declared operable for Modes 5 and 6.The meteorological monitoring system (MIDAS)is made available in the Unit 1 Control Room hence the ability to anticipate tornado winds is restored.1'll time entries are Eastern Standard Time (EST).
DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-316 D.C.Cook Unit 2 September 4, 1999 S.A.Richardson 616-465-5901 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS
-August 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.DATE TYPE'OURS REASON~REACTOR3 REPORT NO.CODEi CODEs CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F 334 101397 S 162.0 582.0 97-003 97-004 97-005 N/A N/A N/A N/A N/A The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)Inspection.
The scheduled refueling outage commenced while the unit has been shutdown to resolve design basis questions discovered during the NRC AE Inspection.
335 010798 F 744.0 N/A N/A'/A The unit remained shutdown to resolve design basis questions identified during the NRC Architect and Engineering (AE)Inspection.
1 TYPE: F: Forced S: Scheduled 2 REASON: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 METHOD: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)4 SYSTEM: Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 0161)5 COMPONENT:
Exhibit I: Same Source