ML18138A030

From kanterella
Revision as of 07:21, 17 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Jan 1980
ML18138A030
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/15/1980
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Haller N
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML18138A031 List:
References
120, NUDOCS 8002190757
Download: ML18138A030 (1)


Text

  • VXRGINIA ELECTRIC AND POWER COMPANY RICHMOND,VIRGIN.IA 23261 February 15, 1980 Mr. N. M. Haller, Director Office of Management and Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Haller:

Serial No. 120 PO/RMT:baw Docket Nos. 50-280 50-281 License Nos: DPR-32 DPR-37 Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. 1 and 2 for the month of January, 1980. Very truly yours, ;z;;, >>1.

C. M. Stallings Vice President-Power Supply and Production Operations Enclosure (3 copies) cc: Mr. Victor Stello, Director (10 copies) Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy) Office of Inspection and Enforcement

-Region II