Submits Revised Response to Violations Noted in Insp Repts 50-259/89-16,50-260/89-16 & 50-296/89-16.Extends Completion Dates for Commitments to 901203
ML18033B482
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/14/1990
From: MEDFORD M O
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9008150281
Download: ML18033B482 (7)


See also: IR 05000259/1989016

Text

ACCELERATED

DISTRIBUTION

DEMONSTRATION

SYSTEM RECIPIENT ID CODE/NAME PD INTERNAL: ACRS AEOD/DE I I B DEDRO NRR SHANKMAN, S NRR/DOEA DIR'11 NRR/DRIS/DIR

NRR/PMAS/I

LRB12 0 REG FILE 02 COPIES LTTR ENCL 2.2 1 1 1 1 1 1 1 1 1'1 1 1 1 1 1 RECIPIENT ID CODE/NAME ROSS,T.AEOD AEOD/TPAD NRR MORISSEAU F D NRR/DLPQ/LPEB10

NRR/DREP/PEPB9D

NRR/DST/DIR

8E2 NUDOCS-ABSTRACT

OGC/HDS2" RGN2 FILE 01 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1'1 1 1 1 1 1 1<S80 U.S.Nuclear Regulatory

Commission

ATTN: Document Control Desk Washington, D.C.20555, Gentlemen:

In the Matter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)-UNITS 1, 2, AND 3-NRC INSPECTION

REPORT NOS.50-259/89-16$

50-260/89-16$

50-296/89-16

-REVISION TO NOTICE OF VIOLATION RESPONSE Reference:

Letter from M.0.Medford to NRC dated April 9, 1990,"BROWNS FERRY NUCLEAR PLANT (BFN)-UNITS 1, 2, AND 3, NRC INSPECTION

REPORT NOS.50-259/89-16, 50-260/89-16, AND 50-296/89-16-

RESPONSE TO NOTICE OF VIOLATION" TVA committed in the referenced

letter to complete the following two commitments

by August 15, 1990: (1),Essential

mechanical

calculations

performed by the contractor

will be reviewed for errors"and the errors corrected.

The errors will be evaluated for impact on calculation

results and conclusions

and (2)Area walkdowns will be completed.

This letter is provided to extend the completion

date for these items.The first commitment, correction

of errors in mechanical

calculations, will be completed by December 3, 1990.The errors in the subject calculations

have been identified

and the calculations

are in the process of being corrected.

The second commitment$

performance

of area walkdowns, will be completed by December 3, 1990 based on the current unit 2'restart schedule.Current levels of maintenance

and modification

activities

in the plant make it inappropriate

to perform the area walkdowns by August 15, 1990.The area walkdown procedure has been drafted and is currently in the review and approval cycle.081.0281 PILI.IGW POP ADQCK 0 iC)OI32.<'v IJ PbI~grf An Equal Opportunity

Employer

U.S.Nuclear Regulatory

Commission

AU814 teso The other commitments

made in the referenced

letter have been completed.

The enclosure to this letter provides the revised commitment

dates.If you have any questions, please telephone Patrick P.Carier at (205)729-3566.Very truly yours, TENNESSEE VALLEY AUTHORITY Mark O.Medford,'ice

President Nuclear Technology

and Licensing Enclosure cc (Enclosure):

Ms.S.C.Black, Deputy Director Project Directorate

11-4 U.S.Nuclear Regulatory

Commission

One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000

Thierry M.Ross, Project Manager U.S.Nuclear Regulatory

Commission

One White Flight, North 11555 Rockville Pike Rockville, Maryland 208 Mr.B.A.Wilson, Project Chief U.S.Nuclear Regulatory

Commission

Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

ENCLOSURE LIST OF COMMITMENTS

1.Essential mechanical

calculations

performed by the contractor

will be reviewed for errors and the errors corrected.

The errors will be ev'aluated

for impact on calculation

results and conclusions

by December 3, 1990.(Violation

A, example 1)2.Area walkdowns will be completed by December 3, 1990 (Violation

A, example 3: Violation B, examples 1, 2, and 7)