|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
DOCKETN0500033505000389gcCp~RATZDDlBUTIONDEMONSTR0.'iSYSTEMIREGULATOR1 NFORMATION DISTRIBUTION S2EM(RIDS)ACCESSION NBR:9002260449 DOC.DATE:
90/01/31NOTARIZED:
NOFACIL:50-335 St.LuciePlant,Unit3floridaPower6LightCo.50-389St.Lucie,Plant,Unit2,FloridaPower6LightCo.AUTH.NAMEAUTHORAFFILIATION BONETT,D.M.
FloridaPoweraLightCo.SAGER,D.A.
FloridaPoweraLightCo.RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthlyoperating reptsforJan1990forStLucieUnits162.W/900215 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR gENCLgSIZE:(0TITLE:MonthlyOperating Report(perTechSpecs)NOTES:RECIPIENT IDCODE/NAME PD2-2LANORRISPJINTERNAL:
ACRSAEOD/DSP/TPAB NRR/DLPQ/LPEB10 EPPRPB11,REFILE01EXTERNAL:
EG&GSIMPSONPF NRCPDRCOPIESLTTRENCL33111010111111111111RECIPIENT IDCODE/NAME PD2-2PDAEOD/DOAIRMTECHADVNRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN2LPDRNSICCOPIESLTTRENCL1111221111111111NCTEIOALL"RIDS"RECIPZEÃIS'LEASE HELPUSIOiKDUCEHASTE!CXNI'ACZ'IHEIXXXlMERX'XKIBDL DESKRDCNPl-37(EXT.20079)IOEIZMQQZE%SRMIMEPBCHDIPX%UEOTIGR LISTSMRDOCUMENIS YOUDCRPTNEED)TOTALNUMBEROFCOPIESREQUIRED:
LTTR29ENCL29 0-e P.O.Box14000, JunoBeach,FL33408-0420 FEBRUARY15$999L-90-5310CFR50.36U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555Gentlemen:
RE:St.LucieUnits1and2DocketNos.50-335and50-389Monthl0eratinReortAttachedaretheJanuary1990Operating StatusandSummaryofOperating Experience ReportsforSt.LucieUnits1and2.Verytrulyyours,D.A.erVicesidentSt.LucePlantDAS/DMBAttachments cc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlant9002260449 g0013iPDRADOCK05000335RPNUanFPLGroupcompany lIPIi(f
~~AVERAGEDAILYUNITPOWERLEVELDOCKETNO.50-335UNITSt.Lucie1DATEFebruar151990COMPLETED BYD.M.BonettTELEPHONE 407694-4432MONTHZanua1990DAYAVERAGEDAILYPOWERLEVEL(MWe-Net)
~,1/1/901/2/901/3/90l/4/90il5/901/6/90il7/90l/8/901/9/90l/18/901/11/901/12/901/13/901/14/901/15/90l/16/901/17/901/18/901/19/90l/28/90l/21/901/22/90l/23/901/24/901/25/901/26/901/27/901/28/90l/29/90l/38/901/31/9085885886386784276586986886686483677886887887886886686586386185932-19-20-12-4-3-3-3-3-3 OPERATING STATUSQF'ERATIHG DATAREPORTDQCI(ETNO50-335DATE2/15/9()COMPLETED BYDoN+BQHI=TT,TELEPHONE 4<)7/694/4432 UNITNAMElST.LUCIEUNIT12.RI=PQRTING PERIOD+J*NUARYl9903iLICENSEDTHERMALPOWER<NHT)o27004+HAMI=PLATE RATING(GROSSMWE)i8585iDESTGHELECTRICAL RATING(HETMHE)+8386MAXTNUMDEPENDABLE CAF'ACXTY (GROSSNHE)l8727+MAXIMUMDEPFHDABLE CAP*CXTY(NETMHE)o8398,IFCHANCESOCCURIN,CAPACITYRATINGS(ITENSNUMBER3THROUGH7)SINCELASTREF'QRT~GIVERFASONSlPOHERLEVELTORHXCI-IRESTRICTED
~IFANY(NETMHE)10,REASONSFORRESTRXCTXONSr IFAMYL'ONTHLY
-YTD-CUMULATIVE iiiI-IOURSIHREPORTPERIOD)12.NUMBEROFHOURSRE*CTORHASCRXTICAL13,REACTQIRESERVESHUTDOWNHOURS14'OURSGENERATOR ON-LINE15'NITRI=SERVESHUTDOWNHOURS16.GROSSTHERMALENERGYGENERATED (MHH)17.GROSSELECTRIC*L ENERGYGENERATED (MWH)18HETELECTRICAL ENERGYGENERATED
<MHH)19.UNITSERVICEFACTOR28iUNXT*VA'ILABILXTY FACTOR21.CAF'ACXTY FACTOR(USIHGMDCNET)22,CAF'ACITY FACTOR(USINGDERNET)23.UNITFORCEDOUTAGERATE24'HUTDOWNS SCI.IEDULED OVERNEXT6NQHTHS1/22/907REFUEIING7445er,o0+0586+90+0l34885545431042909368+1688+769+5Zt3744507i0OiO586i90+0134885545431042909368+168ii68+769+5Zt3'114960i087895+6.ZeS387143+939+3224306495 7389738069827958875+875i674+33+525XFSHUTDOWNATENDOFRFPORTI='ERIOD~ESTIMATED DATEOFSTARTUI=':
4/21/90
UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORTMONTHJanuar1990DOCKETNO.UNITNAMEDATEFebruar15,1990COMPLETED BY0.M.BonettTELEPHONE DateTypeDuration(Hours)Reason~MethodofShuttingDownReactorLicenseeEventReport¹SystemCode4Component Code~Cause&Corrective ActiontoPreventRecurrence Ol90012212.1CCHTEXCHUnit1wasshutdowntorepairatubeleakinthe1BSteamGenerator.
02900122225.0RCFUELXXDuringtheinvestigation intothe1BSteamGenerator leak,adecision-:was madetobeginthescheduled refueling andmaintenance outage.FForcedSScheduled 2ReasonA-Equipment Failure(Explain)
B-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administrative G-Operational Error(Explain)
H-Other(Explain)
Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain)
ExhibitG-Instructions forPreparation ofDataEntryScheetsLicenseeEventReport(LER)
File(NUREG-0161)
Exhibit1-Same Source SUMMARYOFOPERATING EXPERIENCE DOCKETNO.50-335UNITSt.Lucie1DATEFebruary15,1990COMPLETED BYD.M.BonettTELEPHONE 407694-4432REPORTMONTHZanua1990Unit1wasshutdowntorepairatubeleakinthe1BSteamGenerator.
Duringtheinvestigation intothe1BSteamGenerator leak,adecisionwasmadetobeginthescheduled refueling andmaintenance outage.Inaccordance withrequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod.
AVERAGEDAILYUNITPOWERLEVELDOCKETNO.50-389UNITSt.Lucie2DATEFebruar151990COMPLETED BYD.M.BonettTELEPHONE 407694-4432MONTHZanua1990DAYAVERAGEDAILYPOWERLEVEL(MWe-Net) 1/1/901/2/901/3/901/4/901/5/90l/6/901/7/901/8/901/9/90l/ie/901/11/901/12/901/13/901/14/901/15/901/16/901/17/901/18/901/19/901/ze/9e1/Zi/901/Z2/9e1/Z3/901/24/901/25/90l/26/901/27/901/28/90l/Z9/90l/3e/9e1/31/90856828716597-24-9-9-9-9-9-11-I4-26-13-3414459877285785985985185986e86e85986086e860861859 OPERATXNG STATUSOPERATXNG DATAREPORTDOCI(ETNQ50-389DATE2/l5r9eCOMPLETED BYD,M,BQNETTTELEPI.IONE 4e71'694/4432 ioUNXTNAMEiSTiLUCXEUNXT22,RI=PORTXNG PERXOD:JANUARY199e3,LXCENSEDTHERMALPOWER(MWT)'7ee 4iNAMEPLATE RATXNG(GROSSMWE)+8505+DESXGNELECTRXCAL RATTNG(NETMWE)+83ebiMAXXMUMDEPFNDABLE CAPACITY(GROSSMWE)e8827iMAXXMUMDEPENDABLE CAPACITY(NETMWE)o8398XFCHANGESOCCUI'NCAPACXTYRATXNGS(XTEMSNUMBER3THROUGI-I 7)SXNCELASTREPORTGIVEREASONS:'9iPOWERLEVELTOWKXCI-IRESTRXCTEDr XFANY(NETMWE)ie.REASONSFORRESTRXCTXONSr XFANY:MONTHLY-YTD-CUMULATXVE iiiHOURSXNREPORTPERXQD:1Z,NUMBERQFI-IOURSREACTORWASCRXTXCAL13,REACTORRESERVESHUTDOWNHOUI'S14.I.IOURSGENERATOR QN-LXNE15.UNXTRESERVESHUTDOWNHOURSiboGROSSTHERMALENERGYGENERATED (MWH)17,GROSSELI=CTRXCAL ENERGYGENERATED (MWH)18'ETELECTRXCAL ENERGYGENERATED (MWH)19,UNXTSI=RVXCEFACTORzeoUNXTAVAXLABXLXTY FACTORZi,CAr-ACXTV FhCTQR(USXNGMDCNET)22,CAPACXTYFACTOR(USXNGDERNET)23UNXTFORCEDOUTAGERATE24oSHUTDOWNS SCI.IEDULED OVERNEXT6MONTI.IS744e4eie465zeie119123739836037191162+562+559ibbe+237t57445e4i5eie465izeie1191237398360371911bzi5bzi55'9+6benz37t556857+e48673+4ewe47819i9ewe124988633 416502703938502584+184+184ib84i45i825.XFSHUTDOWNATENDOFREPORTPEI"XODESTXMATED DATEOFSTARTUP:
UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORTMONTHJanuar19TELEPHONE DOCKETNO.UNiTNAMESt.Luc1e¹2DATEFebruar15,1990COMPLETED ByD.M.BonettNo.DateType'uration (Hours)Reason~MethodofShuttingDownReactorUcenseeEventReport¹SystemCode4Component CodesCause8cCorrective ActiontoPreventRecurrence 0190010402900114239.50.0N/AN/ACBVALVEXWGINSTRUUnit2wasshutdownforminorleakrepairstotwovalvesinthepressurizer cubiclearea.Duringthereturntopower,following therepairofthepressurizer valves,theunitwasheldatapproximately 205powerduetoaproblemwiththeMainFeedwater Regulating ValveLevelTransmitter LT-9011.0390011439.3.50-389-90-01 WGMECFUNDuringthereturntofullpower,thereactorwastrippedduetoanoperatorerror.Whileoffline,aproblemwiththe2CAuxiliary Feed-aterGovernorValvewasinvestigated andrepaired.
FForcedSScheduled 2ReasonA-Equipment Failure(Explain)
B-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&UcenseExamination F-Administrative G-Operational Error(Explain)
H-Other(Explain)
Method1-Manual2-ManualScram 3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain) 4ExhibitG-Instructions forPreparation ofDataEntryScheetsLicenseeEventReport(LER)
File(NUREG4161)
Exhibit1-SameSource IJ UNITSHUTDOWNS ANDPOWERREDUCTIONS REPORTMONTHJanuar1990DOCKETNO.UNrrNAMEStDATEFebruar151990COMPLETED BYTELEPHONE DateType'uration (Hours)Reason2MethodofShuttingDownReactorUcenseeEventReportitiSystemCode4Component CodesCause&Corrective ActiontoPreventRecurrence 04059001169001160.00.0N/AN/AHATURBINHJPUt1PXXTheascenttofullpowerwasresumedfollowing aturbineperformance test.Unit2washeldatapproxifhately 70Kpowerfortherepairofthe2ATurbineCoolingWaterPumpMechanical Seal.Fullpoweroperation wasresumed.FForcedSScheduled ReasonA-Equipment Failure(Explain)
B-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administrative G-Operational Error(Explain)
H-Other(Explain)
Method1-Manual2-ManualScram 3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain) 4ExhibitG-instructions forPreparation ofDataEntryScheetsLicenseeEventReport(LER)
File(NURE&0161)Exhibit1-Same Source Hlt~I' SUMMARYOFOPERATING EXPERIENCE DOCKETNO.50-389UNITSt.Lucie2DATEFebruar151990COMPLETED BYD.M.BonettTELEPHONE 407694-4432REPORTMONTHZanua1990Seethe"UnitShutdowns andPowerReductions" sheetfordetails.Inaccordance withrequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod.