MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 ML20209D8521999-07-0707 July 1999 Responds to Util 990706 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required by TS 3.7.2, Auxiliary Electrical Sys. NOED Warranted & Approval Granted for Extension of Allowed Outage Time to 14 Days ML20209A8561999-06-25025 June 1999 Refers to Investigation Rept A4-1998-042 Re Potential Falsification of Training Record by Senior Licensed Operator at Arkansas Nuclear One Facility.Nrc Concluded That Training Attendance Record Falsified IR 05000313/19990071999-06-21021 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-313/99-07 & 50-368/99-07 Issued on 990514.Adequacy of Min Staffing Levels May Be Reviewed During Future Insps ML20196D4241999-06-21021 June 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp of License SOP-43716 Issued on 990325.Believes That NRC Concerns Have Been Adequately Addressed at Present ML20207H3551999-06-10010 June 1999 Forwards Insp Repts 50-313/99-05 & 50-368/99-05 on 990411-0529.No Violations Noted ML20195G3481999-06-0909 June 1999 Ack Receipt of ,Transmitting Changes to Facility Emergency Plan,Rev 25,under Provisions of 10CFR50,App E, Section V IR 05000313/19993011999-06-0909 June 1999 Discusses Arrangements for Administration of Licensing Exam During Wk of 991213,per Telcon of 990602.As Agreed,Exams Repts 50-313/99-301 & 50-368/99-301 Will Be Prepared Based on Guidelines in Rev 8 of NUREG-1021 ML20195F1631999-06-0808 June 1999 Forwards Insp Repts 50-313/99-06 & 50-368/99-06 on 990524-28.Violation Identified & Being Treated as Noncited Violation ML20207G3111999-06-0707 June 1999 Ack Receipt of Changes to ANO EP Implementing Prcoedure 1903.010,Emergency Action Level Classification,Rev 34 PC-2, Received on 981218,under 10CFR50,App E,Section V Provisions. No Violations Identified ML20207G7951999-06-0707 June 1999 Forwards Notice of Violation Re Investigation Rept A4-1998-042 Re Apparent Violation Involving Initialing Record to Indicate Attendance at Required Reactor Simulator Training Session Not Attended ML20207E7131999-06-0202 June 1999 Discusses EOI 990401 Request for Alternative to Requirements of Iwl for Arkansas Nuclear One,Pursuant to 10CFR50.55a(g)(6)(ii)(B) & ASME BPV Code Section XI & Forwards Safety Evaluation Accepting Proposed Alternative ML20207B9521999-05-26026 May 1999 Discusses GL 98-04, Potential for Degradation of ECCS & CSS After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. Staff Will Conduct Limited Survey in to Identify Sampling ML20207B4171999-05-24024 May 1999 Forwards Corrected Cover Ltr to Insp Repts 50-313/99-07 & 50-368/99-07 Issued 990514 with Incorrect Insp Closing Date ML20207A7771999-05-24024 May 1999 Forwards Insp Repts 50-313/98-21 & 50-368/98-21 on 981116-990406.One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation,Consistent with App C of Enforcement Policy ML20206U4541999-05-17017 May 1999 Discusses Util & Suppl Re Changes to License NPF-06,App a TSs Bases Section.Staff Offers No Objection to These Bases Changes.Affected Bases Pages,B 202, B 2-4,B 2-7,B 3/4 2-1,B 3/4 2-3 & B 3/4 6-4,encl ML20206S4721999-05-14014 May 1999 Forwards Insp Repts 50-313/99-07 & 50-368/99-07 on 990426- 30.No Violations Noted.However,Nrc Requests That Util Provide Evaluation of Licensee Provisions to Maintain Adequate Level of Response Force Personnel on-site ML20207B4271999-05-14014 May 1999 Corrected Ltr Forwarding Insp Repts 50-313/99-07 & 50-368/99-07 on 990426-30.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program ML20206R4741999-05-13013 May 1999 Informs That Staff Reviewed Draft Operation Insp Rept for Farley Nuclear Station Cooling Water Pond Dam & Concurs with FERC Findings.Any Significant Changes Made Prior to Issuance of Final Rept Should Be Discussed with NRC ML20206N7011999-05-12012 May 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization, Division of Licensing Project Management Created ML20206M7581999-05-11011 May 1999 Forwards SE Accepting Relief Request from ASME Code Section XI Requirements for Plant,Units 1 & 2 ML20206S1761999-05-11011 May 1999 Responds to Informing of Changes in Medical Condition & Recommending License Restriction for Senior Reactor Operator.No Change Was Determined in Current License Conditions for Individual ML20206N4161999-05-11011 May 1999 Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-related Logic Circuits, for Plant,Units 1 & 2 ML20206S4211999-05-10010 May 1999 Forwards Insp Repts 50-313/99-04 & 50-368/99-04 on 990228- 0410.Four Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20206H1031999-05-0606 May 1999 Forwards Results of Gfes of Written Operator Licensing Exam, Administered on 990407,to Nominated Employees of Facility. Requests That Training Dept Forward Individual Answer Sheet & Results to Appropriate Individuals.Without Encl ML20206F0611999-04-29029 April 1999 Forwards SE Accepting Licensee Re ISI Plan for Third 10-year Interval & Associated Requests for Alternatives for Plant,Unit 1 ML20205R6331999-04-20020 April 1999 Ack Receipt of Which Transmitted Rev 39 to ANO Industrial Security Plan,Submitted Under Provisions of 10CFR50.54(p).No NRC Approval Is Required,Since Util Determined Changes Do Not Decrease Effectiveness of Plan ML20205P4641999-04-15015 April 1999 Forwards for Review & Comment Draft Info Notice That Describes Unanticipated Reactor Water Draindown at Quad Cities Nuclear Power Station Unit 2,Arkansas Nuclear One Unit 2 & Ja Fitzpatrick NPP ML20205N7251999-04-13013 April 1999 Forwards Summary of 990408 Meeting with EOI in Jackson, Mississippi Re EOI Annual Performance Assessment of Facilities & Other Issues of Mutual Interest.List of Meeting Attendees & Licensee Presentation Slides Encl ML20205M6881999-04-12012 April 1999 Forwards Safety Evaluation on Second 10-year Interval Inservice Insp Request Relief 96-005 ML20205L7711999-04-0909 April 1999 Forwards Insp Repts 50-313/99-03 & 50-368/99-03 on 990202- 17.No Violations Noted ML20205K7681999-04-0606 April 1999 Forwards RAI Re risk-informed Alternative to Certain Requirements of ASME Code 11,table IWB-2500-1 ML20205G8871999-04-0202 April 1999 Forwards RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, for Plant, Units 1 & 2.Response Requested within 60 Days of Date of Ltr 1999-09-22
[Table view] |
Text
. . .m . _. _
* ,
e t h' "8 004 UNIT ED ST ATES
,, t NUCLEAR REGULATORY COMMISSION e REGlo4 tv g
g 611 RYAN PLAZA DRIVE, SUITE 400
%. 4, * * * * * ,0 AR LINoTON, T EXAS 760108064 November 18, 1997 EA 97-382 C. Randy Hutchinson, Vice President Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, Arkansas 72801-0967 SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REPORT 50-313/97-14; 50-368/97-14)
Dear Mr. Hutchinson:
This is in reference to the predecisional enforcement conference held in the NRC's Arlington, Texas office on September 26,1997. The conference was conducted to discuss three apparent violations of NRC requirements related to inspections of steam generator tubes at Arkansas Nuclear One, Units 1 and 2. The results of our inspection were discussed with your staff during a telephonic exit briefing conducted on August 8,1997, and were documented in the subject NRC Inspection Report, which was issued September 12,1997.
After the September 26 conference, ANO provided further information and clarification during a telephone discussion held on October 2,1997.
The three apparent violations described in the inspection report involved: (1) a failure to comply with 10 CFR Part 50 Appendix B Criterion IX in the use of data in bobbin coil sizing qualification criteria that did not conform to the requirements of the selected qualification method; (2) the failure to remove Unit 2 tubes from service which contained flaws that exceeded the plugging limit of the Technical Specifications; and (3) the lac!; of prompt corrective action in November 1995 prior to-retuming potentially defective sleeved tubes to service.
During the September 26 conference, Enter'g y expressed disagreement with the first apparent violation, contending that Entergy's sizing qualification for intergranular attack (IGA) met the provisions of appropriate industry qualification processes (EPRI Appendix "H"), and therefore Entergy was in compliance with 10 CFR Part 50 Appendix B. With regard to the second _
apparent violation, which involved Unit 2 steam generators, Entergy agreed that the violation occurred but contended that the violation warranted treatment as a non-cited violation.
Entergy also disputed the third apparent violation, which is discussed below.
The NRC considered Entergy's arguments and has concluded that vic;dions of NRC requirements occurred.
Based on the discussions The at the violations conference, weare cited have in the modified the enclosed first violationNotice to stateof Violation (No that 7 Entergy's inservice inspections of Unit 1 steam generators were not appropriately controlled g
, and accumplished to identify tube defects that exceeded the technical specification plugging (f 9711200032 971118 i
.
.
Entergy Operations, Inc. -2-limit. The second violation involves Unit 2 steam generator tubes, with defects greater than
' the technical specification plugging limit, that were improperly considered operable.
Although these violations involve steam generators of different designs and different IGA flaw sizing methodologies, the violations are similar in that your methods for sizing lGA and tubing degradation in both Units 1 and 2 steam generators were shown to have been inadequate.
The actual safety consequence of these violations is low because no significant leakage occurred as a re: ult of tube leaks. These issues are of regulatory significance because of the programmatic nature of the problem; that is, you relied on methods which were incapable of detecting flaws greater than the plugging limit, and as a result, operated Units 1 and 2 with steam generators with tubes containing flaws that exceeded the technical specification plugging limit of 40 percent through wall (TW). Therefore, these two violations have been categorized in the aggregate in accordance with the " General Statement of Policy and Procedure for WRC Enforcement Actions"(Enforcement Policy), NUREG-1600, as a Severity Level lli problem.
In accordance with the Enforcement Policy, a base civil penalty in the amount of $55,000 is considered for a Severity Level 111 problem. Because your facility has been the subject of escalated enforcement actions within the last 2 years', the NRC considered whether credit was warranted for Identification and Corrective Action in accordance with the civil penalty assessment process in Section VI.B.2 of the Enforcement Policy. Since Entergy identified both issues, the NRC has determined that Entergy is deserving of identification credit.
Further, the NRC has determined that Entergy is deserving of Corrective Action credit.
Entergy's corrective actions for the first violation included declaring the steam generators inoperable, notifying the NRC, requesting (and being granted) a Notice of Enforcement Discretion from the NRC, administratively precluding IGA sizing, and investigating the cause of the problem. Entergy's corrective actions to the second violation included reviewing more
"no detectable degradation" determinations to verify the quality of the 2R12 analyses, performing enhanced inservice inspectio".s of indications, repairing the eggerate cracks, enhancing training, and providing additional oversight of the inservice inspections.
Therefore, to encourage prompt identification and comprehensive correction of violations, I have been authorized not to propcse a civil penalty in this case. However, significant violations in the future could result in a civi! penalty.
The third violation cited in the enclosed notice involves Entergy's failure to take prompt corrective actions prior to retuming to service potentially defective sleeved tubes exhibiting weld zone eddy current indications. At the conference, Entergy representatives expressed disagreement with this violation, contending that sufficient technical basis existed (including
' A Severity Level 111 problem and a $50,000 civil penalty was issued on April 9,1997, involving fire protection inadequacies and the plant staff's inadequate response to ind:ations of a fire (EA 96-512).
. .. - . - -. .
t ;
' ~
Entergy Operations, Inc. 3 ultrasonic testing and visual testing) to justify use of the sleeves as-is. Further, Entergy representatives noted thet, after re-inspection, only one of 28 indications was identified for repair based on new acceptance criteria and that all 28 indications met structural and leakage requirements; Notwithstanding Entergy's argument that the structural integrity of the sleeves was maintained, the NRC's position is that Entergy had an indication of a condition adverse _to quality, and it took inadequate corrective actions. Specifically, your actions (in October 1995, during 2R11) were not adequate to evaluate defects that existed at the time, nor did you perform an operabrity assessment at the time. Therefore, in accordance with the its Enforcement Policy, the NRC has classified this violation et Severity Leve,l IV.-
You are required to respond to this letter and should follow the instructions specified in the -
encksed Notice when preparing your response in your response, you should document the specific actions taken and any additional actions you plan to prevent recurrence. The NRC will use your response, in part, to deteimine whether further enforcement action is necessary to ensure compliance with regulatory requirements, in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosure, arid your response will be placed in the NRC Public Document Room (POR).
Sincerely,
'f
Ellic W. Mers Regional Adm'iistrator Dockets: 50-313-50-368 Licenses: DPR 51 NPF-6
'
cc w/ Enclosure:
Executive Vice President
& Chief Operating Officer
,
Entergy Operations, Inc.
'
P.O. Box 31995 L Jackson, Mississippi 39286-1995
l
r^- 1
..
Entergy Operations, Inc. -4-
.
Vice President Operations Support Entergy Operations, Inc.
P.O. Box 31995 Jackson, Mississippl 39286-Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear
!
Power 12300 Twinbrook Parkway, Suite 330 <
Rockville, Maryland 20852 County Judge of Pope County Pope County Courthouse Russellville, Arkansas : 72801 Winston & Strawn -
1400 L Street, N.W.
WasNngton, D.C. 20005 3502 David D. Snellings, Jr., Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, Arkansas 72205-3867 Manager Rockville Nuclear Licensing '
Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, Maryland 20852
.
- ,- --
,
. _ . _ _ _ _ .- - . _ _ . -. _ _ _ . .
, .,
9-Entergy OperatPpW inc, . -5-
.
bec w/ Enclosure (s): -
PDR-LPDR hNUDOCS [
SECY EC's: Rl,Ril,Rlli CA PA (Os2G4)
EDO (017G21) OiG (T 5D28)
DEDO (0-17G21) OE (0 7H5)
OE:EAFile (0 7H5) 01 (0 3E4)
^
_
OGC (0-15818) OGC (015B18)
NRR (012G18) NRR/ADP (012G18)
NRR PROJECT MANAGER OC/DAF (T-9E10)
OC/LFDCS (T 9E10) AEOD (T-4D18)
RA Reading File GSanborn-EAFile RWise (if app.) RWise-DOL File (if app.)
RIV Files MIS Coordinator ECollins, RIV E Mall DlHTRIBUTION:
OEMAIL: JDyer (JED2)
TPGwynn (TPG) WBrown (WLB)
GSanborn (GFS) GMVasquez (GMV)
BHenderson (BWH) MHammond (MFH2)
CHackney (CAH) DKunihiro (DMK1)
Art Howell (ATH) DChamberlain (DDC)
KPerkins (KEP) ECollins (EEC)
SENIOR RESIDENT- KBrockman (KEB)
EMerschoff (EWM)
DOCUMENT NAME: G:\EA\ DRAFT \EA97382.DFT To receive, copy opument, Indicats in box: "C" = Copy wthout oncesures "E" = Copy with enclosures *N" = No copy
~ ~
ES //7AV EO O TA ,,,p DRP() , D:DRS@0 ,
MVasquez GSapid IBarnes f/'D EC611TfiP AHovTell [
11k//97 11/d/97 114r/97 _ 11/'//97 11/4/97
-_
RC f4 DRA RA g/
W8rown R JDyer @ EMy.f56tioff 11/G/97 11/f//97 11//fl97 OFFIC!AL RECORD COPY