Ack Receipt of Informing NRC of Steps Takend to Correct Violations Noted in Insp Repts 50-313/97-02 & 50-368/97-02.Violation Re Failure to Perform Periodic Testing in CR Emergency Ventilation Sys
ML20148S156
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 07/01/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
References
50-313-97-02, 50-313-97-2, 50-368-97-02, 50-368-97-2, NUDOCS 9707080123
Download: ML20148S156 (4)


Text

_.

,

  • M48709 UNITED STATES

%a NUCLEAR REGULATORY COMMISSION

Y REGloN IV

'f Q $ 611 RYAN PLAZA DRIVE, SUITE 400

+,*****/ ARLINGTON. TEXAS 760114064 g _l g C. Randy Hutchinson, Vice President Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, Arkansas 72801-0967

.

SUBJECT: NRC INSPECTION REPORT 50-313/97-02; 50-368/97-02

Dear Mr. Hutchinson:

Thank you for your letter of June 18,1997, regarding the referenced Notice of Violation for failure to perform periodic testing of backup air accumulators for the outside air dampers in the control room emergency ventilation system. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

Sincere T omas P. Gw n,D'e or Division of Rea tor ojcts Docket Nos.: 50-313 50-368 License Nos.: DPR-51 NPF-6 cc:

Executive Vice President

& Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 \

\ \

\ i IlllOllillllWil!llHllllllllllllli

9707080123 970701 7- *' ' l gDR ADOCK 05000313 PDR

.

.

,

. ..

Entergy Operations, Inc. -2- !

Vice President

' Operations Support Entergy Operations, Inc. '

P.O. Box 31995  ;

Jackson, Mississippi 39286  ;

Manager, Washington Nuclear Operations ,

,

ABB Combustion Engineering Nuclear i

. Power t 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 .

County Judge of Pope County Pope County Courthouse Russellville, Arkansas. 72801 Winston & Strawn 1400 L Street, N.W.

Washington,- D.C. 20005-3502 i

David D. Snellings, Jr., Director *

Division of Radiation Control and Emergency Management

,

Arkansas Department of Health  !

4815 West Markham Street, Mail Slot 30 ,

Little Rock, Arkansas 72205-3867 '

Manager. -

Rockville Nuclear Licensing i Framatome Technologies 1700 Rockville Pike, Suite 525 Rockville, Maryland' 20852 i

_ _ _

. - . . .. . .~. -. . - - - - - . -. .-_.. ~... . -... .

. .. - . - - .. ... - . ,

,

,

. . .

'k Entergy Operations, Inc. -3- ~

l JUL - I 1997  :

!

,

, bec to DCD (IE01) i

!

bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director MIS System l Branch Chief (DRP/C) RIV File '

Project Engineer (DRP/C) DRS-PSB Branch Chief (DRP\TSS)

l

l l

i

.

DOCUMENT NAME: R:\_ANO\AN702AK.KMK To receive copy of document, Indicato in box: "C" = Copy without enclospres ' "E" = Copy with enclosures "N" = No copy l RIV:DRP/C ,; C:DRP/C D:DRP f ,

l BASmalldridge;dfAff EECollins gv. TPGwynn \fQ

'

l 6/ 90 /97 #' ' f/ l/97 j'#C T/ l /97 G

'

0 FIC,AL RECORD COPY

!

.

-

m - - ,

. . .. . - . . . . - .

,

.8-~=- ENTERGY seis,sy og.,1 ioo,. i...

iuasa m RxxMe. AR 7290)

Tel 501858-5000 10CFR2.201 June 13,1997 OCAN069706 ,

. . . _ _ .

- - -

'

@NO_Ed'5u{p; U. S. Nuclear Regulatory Commission f { !;i i Document Control Desk, OPI-17 ^j[I" JUN 2 41997 iL Washington, DC 20555 ,

.

t, Subject: Arkansas Nuclear One - Units 1 and 2 MCK N N ( _. -

Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Response To Inspection Report 50-313/97-02;50-368/97-02 Gentlemen:

Pursuant to the provisions of 10CFR2.201, attached is the response to the notice of violation identified during the inspection activities associated with the failure to perform periodic testing of backup air accumulators for the outside air dampers in the control room emergency ventilation system.

Should you have any questions or comments, please call me at 501-858-4601.

'

truly your ,

( w ---

,

ig C Mims irect .r uclear Safety DCM/ajs Attachments

'

.

)

- W -TETW Qh

~

'

U. S. NRC -

, ,

_ June 18,1997

,. - OCAN069706 PAGE 2  !

cc: Mr. Ellis W. Merschoff l

. Regional Administrator -

U. S. Nuclear Regulatory Commission RegionIV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064

'

NRC Senior Resident Inspector.

Arkansas Nuclear One

'

P.O. Box 310 London, AR72847 i

Mr. George Kalman NRR Project Manager Region IV/ANO-1 & 2 U. S. Nuclear Regulatory Commission 4

'

NRR Mail Stop 13-H-3 One White Flint North

'

11555 Rockville Pike l Rockville, MD 20852 )

l .

i l

!

,

I

". Anschmanito

'

. OCAN069706 y- -Pag)1 of2

!

,

NOTICE OF VIOLATION

!

,

During an NRC inspection conducted on March 16 through April 26,1997, one violation

ofNRC requirements was identi6ed. In accordance with the " General Statement ofPolicy i- and Procedure for NRC Enforcement Actions," NUREG-1600, the violation is listed below:

,

.

, 10 CFR Part 50, Appendix B, Criterion XVI, " Corrective Action," requires, in

.

part, that measures shall be established to assure that conditions adverse to quality, such as failures, malfunctions, and deficiencies are promptly identified and 4 corrected.

Contrary to the above, as of February 7,1997, established measures did not assure j that leakage from Accumulator 2VRA-1B which 'was in excess of acceptance _

! .

criteria, a condition adverse to quality, was promptly identified and corrected. The

{ periodic accumulator performance testing proposed in response to Enforcement i Action 90-175 was not being performed.

.

.

This is a Severity Level IV violation (Supplement 1) (Violation 50-313/9702-01;

!'

50-368/9702-01)

s l Response to Notice Of Violation 313/9702-01: 368/9702-01 (1) Reason for the violation:

F-The control room emergency ventilation system includes Emergency Fan and Filter Units, VSF-9 and 2VSF-9. External air dampers CV-7910 and 2PCD-8607B, associated with VSF-9 and 2VSF-9, respectively, provide a filtered air supply path for pressurizing the control rooms during emergency ventilation system operation. In the event that a fan fails, the associated outside air damper must be closed to prevent a loss of control room pressurization. Each damper has a reserve bottle of carbon dioxide (accumulators VRA-1A and 2VRA-1B) to provide a closing force for the damper in the event that instmment air is lost.

Condition report CR-C-90-0089 was initiated in response to testing deficiencies identified during an Operational Safety Team Inspection (OSTI) conducted by the NRC in September 1990. One corrective action was to develop a procedure, which would be performed at 18 month intervals, to test the ability of the backup accumulators to maintain the external air dampers closed during a loss ofinstrument air. Procedure 1304.175, ANO-1 Damper Air Consumption Test of VRA-1A and 2VRA-1B, became effective on October 15,1991, and the condition report corrective action was subsequently closed. However, procedure 1304.175 was never assigned a J-

. .

. . .. . . _ . ..- - . - - . - - . - . ~ - - - . - - ~~ .- - - .~ .

Atterhment to '

, , , OCAN069706
Page 2 of 2 ,

.

, repetitive task number and incorporated into the maintenance schedule for

'

performance as intended. This omission resulted in the failure-to perform the

'

procedure until the condition was self-identified during a review of the instrument air -

system, on February 5,1997, t i The process for establishing a repetitive task is to initiate a job request identifying that

} the new procedure should be performed. The root cause for this omission was a i 4 program deficiency in that the responsibility for initiating a job request to perform the ;

-

new procedure was not clearly defined or assigned. Had the job request been initiated, i the established maintenance planning and scheduling sequence would have assured that l

'

procedure 1304.175 was performed on 18 month intervals.

In 1993, subsequent to this event, procedure '1000.006, Procedure Control, was y revised to establish responsibility for ensuring a task is developed for procedures that must be performed periodically.

I

(2) Corrective steos that have been taken and the results achieved:

Procedure 1304.175 was satisfactorily performed on February 6 and 7,1997,

.

' Repetitive Task number 019564 was established and will result in the performance of procedure 1304.175 on 18 month intervals.

<

l (3) Corrective steos that will be taken to avoid further violations:

} A review will be performed by December 15,1997, of active procedures to verify that performance intervals have been established.

This condition and root cause will be reviewed with appropriate personnel associated

- with procedure development and implementation by August 29,1997.

Procedures related to development, approval, and performance of procedures will be evaluated to ensure that criteria exists that will result in task initiation and L performance. Any necessary changes will be implemented by December 15,1997.

(4) Date when full comoliance will be achieved:

~

.

'

Full compliance was nchieved on February 7,1997, when procedure 1304.175 was successfully complett:d and task number 019564 was established to perform this j procedure on 18 mor.th intervals.

.

.

. _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____ _ - _ __-

.

.

. -

Entergy Operations, Inc. -3- g _ l lgg7 ibec'to DCD (IE01):.

bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director MIS System Branch Chief (DRP/C) RIV File Project Engineer (DRP/C) DRS-PSB .

Branch Chief (DRP\TSS)

DOCUMENT NAME: R:\_ANO\AN702AK.KMK To receiw copy of document, indicate in box: "C" = Copy without encyres "E" = Copy with enclosures "N" = No copy RIV:DRP/C g C:DRP/C D:DRP f ,

BASmalldridge;df(ff j EECollins & TPGwynn \f/7 64)0/97 7' $/ f /97 ' (# 1/ l /97 G 0:FIC AL RECORD COPY

'