ML17229B096

From kanterella
Revision as of 06:48, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr
ML17229B096
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/31/1999
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-99-088, L-99-88, NUDOCS 9904160174
Download: ML17229B096 (8)


Text

CATEGORY 1.REGULA~Y INFORMATION D1STRIBUTI.SYSTEM (RIDS)ACCESSI'ON NBR:9904160174 DOC.DATE: 99/03/31 NOTARIZED:

NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-,389'St.

Lucie Plant, Unit 2, Florida Power S Light Co.AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A.

Florida Power Ec Light Co.STALL,J.A.

Florida Power Ec Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000335 05000389

SUBJECT:

Monthly operating repts for Mar 1999 for St Lucie,Units 1 8c 2.With 990408 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECIPIENT ID CODE/NAME PD2-3 PD COPIES LTTR ENCL 1'RECIPIENT ID CODE/NAME GLEAVES,W COPIES LTTR ENCL 1 1 INTERNAL: ACRS CENTER 01 1 1 1 1 AEOD/SPD/RRAB OC/DBA/PAD 1 1 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 NOAC 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Florida Powers Light Company,6351 S.Ocean Drive, Jensen Beach, FL 34957 Aped.l 8, 1999 L-99-088 10 CFR 50.36 10 CFR 50.4 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2'ocket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6 and the guidance of Generic Letter 97-02, attached are the March 1999 Operating Data Reports, Summary of Operating Experience Reports, and Unit Shutdowns and Power Reductions for St.Lucie Units 1 and 2.Please contact us should there be any questions regarding this information.

Very truly yours, J.A.Stall Vice President St.Lucie Plant JAS/spt Attachments cc: Regional Administrator, USNRC, Region II Senior Resident Inspector, USNRC, St.Lucie Plant 9904160174 97033i PDR ADOCK 05000335 PDR an FPL Group company DOCKET NO 50-335 UNIT NAME ST.LUCIE UNIT 1 DATE 04/05/99 COMPLETED BY J.A.ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: MARCH 1999 1.Design Electrical Rating (Mwe-Net)830 2.Maximum Dependable Capacity (Mwe-Net)839 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Critical 4.Number of Hours Generator On Line 744 744 2160 2160 154129.5 152493.7 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)0.0 636717 0.0 0.0 1848192 123768730

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:

50-335 St.Lucie 81 Apr.5, 1999 J.A.ROGERS (561)467-7296 REPORT MONTH March 1999 Unit 1 operated at essentially full power for the entire month of March.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT: DATE: COMPLETED BY'ELEPHONE:

50-335 St.Lucie N1 Apr.5, 1999 J.A.ROGERS (561)467-7296 REPORT MONTH March 1999 Number Date TYPe 1 Duration (Hours)Reason 2 Method of Shutting Down Reactor3 Cause&Corrective Action to Prevent Recurrence Unit l operated at essentially full poorer for the entire month of March.F Forced S Scheduled Reason A-Equipment Failure tExplain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training a License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other<Explain)091587 IPL DOCKET NO 50-389 UNIT NAME ST.LUCIE UNIT 2 DATE 04/05/99 COMPLETED BY J.A.ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: MARCH 1999 1.Design Electrical Rating (Mwe-Net)830 2.Maximum Dependable Capacity (Mwe-Net)839 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Critical 4.Number of Hours Generator On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)744 744 0.0 637047 2160 2160 0.0 1844583 117459.7 115810.7 0.0 94850427

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:

50-389 St.Lucie¹2 Apr.5, 1999 S.A.ROGERS (561)467-7296 REPORT MONTH March 1999 Unit 2 operated at essentially full power for the entire month of March.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE 50-389 St.Lucia N2 Apr.5, 1999 J.A.ROGERS (561)467-7296 REPORT MONTH March 1999 Number Date Type 1 Duration (Hours)Reason 2 Method of Shutting Down Reactor3 Cause tx Corrective Action to Prevent Recurrence Unit 2 operated at essentially full poem for the entire month of March.1 F Forced S Scheduled 2 Reason A-Equipment Failure tExplain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training r License Examination F-Administrative G-Operational Error tExplain)H-Other tExplain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)091581 EFL