Monthly Operating Repts for Dec 1994 for St Lucie Units 1 & 2.W/950113 Ltr
ML17228A984
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/31/1994
From: Rogers J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-17, NUDOCS 9501240238
Download: ML17228A984 (19)


Text

PRIQRITY 1 (ACCELERATED l<IDS PROCI'.SSIX(~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9501240238 DOC.DATE: 94/12/31 NOTARIZED:

NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION ROGERS,J.A.

Florida Power&Light Co.SAGER,D.A.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET g 05000335 05000389

SUBJECT:

Monthly operating repts for Dec 1994 for St Lucie Units 1&2.W/950113 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL:~CR~E-CENT NRR/DOPS/OECB EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RRAB NRR/DISP/PIPB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 YOTE TO ALL"RIDS" RECIPIEYTS:

PLEASE HELP US TO REDUCE O',KSTE!COYTACT'I'HE DOC!'ifEYT CONTROL DESk, ROOhf Pl-37 (EXT.504-~083)fO ELIif IRATE YOI.'R XAML'ROif DIS'I'RIB U I'IOY, LIS'I'S I'OR DOCI.'Xf L'X'I'S YOI: DOY,"I'I.'I D!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 r~'~J P.O.Box 128, Ft.Pierce, FL 34954-0128 January 13, 1995 L-95-17 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the December, 1994, Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us~Very truly yours, D.A.Vice St.Lu ger sident e Plant DAS/GRM cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments air/,g 9501240238 941231 PDR ADOCK 05000335 R PDR an FPL Group company r@P)

V I il r

SUMMARY

OF OPERATING EXPERIENCE 50-335 St.Lucie g1 DOCKET NO.: UNIT0 DATE COMPLETED BY: J.A.Rogers TELEPHONE!

(4 07)4 68-4 157 REPORT MONTH December 1994 Unit 1 commenced operation for its Cycle 14 on December 1, 1994.The Unit operated at reduced power for post refueling outage reactor physics testing and power escalation testing through December 4, 1994.The Unit then operated at greater than 80 percent power for the remainder of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

~~

AVERAGE DAILY UNIT POWER LEVEL DOCKET HO.: UNIT: DATE COMPLY TZZ)BY: 50-335 St.Luc3.e N1 01/04/95 Z.A.Ragexs (407)468-4157 12/01/94 12/02/94 12/03/94 12/04/94 12/05/94 12/06/94 12/07/94 12/08/94 12/09/94 12/10/94 12/11/94 12/12/94 12/13/94 12/14/94 12/15/94 12/16/94 12/17/94 12/18/94 12/19/94 12/20/94 12/21/94 12/22/94 12/23/94 12/24/94 12/25/94 12/26/94 12/27/94 12/28/94 12/29/94 12/30/94 12/31/94 AVfWMZ DAILY POWER LZiVlKs (axe-Net)69" 203 436 775 814 816 816 816 819 832 849 849 850 851 848 854 852 852 852 854 854 854 854 857 857 856 856 857 857 857 857 OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 1/6/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT HAME: ST.LUCIE UNIT 1 2.REPORTING PERIOD: DECEMBER 1994 3.LICENSED THERHAL POWER (MWT): 2700 4.NAHEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUH DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIOHS, IF ANY: HONTHLY-YTD-CUMULATIVE 11'OURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REAC'IOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (HWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (M'WH)'19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER HEXT 6 MOHTHS: 744 744.0 0.0 737.1 0.0 1864030 616450 583626 99.1 99.1 93.5 94.5 0'8760 7793.7 0.0 7602.0 0.0 19968440 6536720 6178541 86.8 86.8 84.1 85.0 3.9 158040.0 123323.8 205.3 121956.9 39.3 315733741 104'150010 98436903 77.2 77.2 76.5 75.9 4.0 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

\w t I lt UNIT SHUT.DOWNS AND POWH<REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: COMPLETED BY: J.A.ROGERS TELEPHONE:

(407)468/4157.REPORT MONIH No.Date Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report¹System Code4 Component Code'ause&Corrective Action to Prevent Recurrence 21 22 941027 941201 941202 0.0 0.0 0.0 RC FUELXX RC FUELXX RC FUELXX Unit remained ofHine for cycle refueling.

Unit at 25%popover for physics testing and turbine overspeed trip test.Unit experiencing popover escalation physics testing.F Forced S Scheduled Ibason A-Equipment failure (explain)8-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Tmining&License Exatnination F-Administntive G-Operational Enor (Explain)H-Other (Explain)Method I-Manual 2-Manual Sctam 3-Automatic Scmn 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Prepamtion of Data Entry Sheets Licensee Event Report (LER)File (NUREG4161)

Exhibit I-Same Source 4 I f' A r

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO+!UNIT: DATE: COMPLETED BY: TELEPHONE:

50-389, St.Lucie g2 J.A.Rogers (407)468-4157 REPORT MONTH December 1994 Unit 2 operated at greater than 80 percent power until December 11, 1994, when power was reduced for condenser waterbox cleaning.At the completion of the waterbox cleaning on December 16, 1994, the Unit operated at greater than 80 percent power for the remainder of the month.In accordance with the requirements of Technical Specification 6.9.1.'6, there were no challenges to the PORVs or safety valves during the report period.

'I IP S'h AVERAGE DAILY UNIT POWER LEVER DOCKET NO.: UNIT: DATE QCMPLZrT EX)BY 50-389 St.Lucie 02 01/04/95 aT.A.ROGERS (407)468/4157 12/01/94 12/02/94 12/03/94 12/04/94 12/05/94 12/06/94 12/07/94 12/08/94 12/09/94 12/10/94 12/11/94 12/12/94 12/13/94 12/14/94 12/15/94 12/16/94 12/17/94 12/18/94 12/19/94 12/20/94 12/21/94 12/22/94 12/23/94 12/24/94 12/25/94 12/26/94 12/27/94 12/28/94 12/29/94 12/30/94 12/31/94 AVERAGE DAILY POWER LEVZL (MNe-Net)830 834 832 831 829 833 833 833 835 832 796 561 614 647 703 808 849 848 850 851 850 851 852 853 853 854 848 854 854 854 853 1~4 l OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-389 DATE 1/6/95 FPL LICENSING GROUP-JUNO TELEPHONE 407/694/4432 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: DECEMBER 1994 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUHBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LIHE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GEHERATED (MWH)18.NET ELECTRICAL ENERGY GENERATEO (MWH)19.UNIT SERVICE FACTOR 20'NIT AVAiLABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MOH'THS: 744 744.0 0.0 744.0 0.0 1944054 639510 605392 100.0 100.0 97.0 98.0 0.0 8760 7104.1 0.0 6971.7 0.0 18233509 5944160 5604709 79.6 79.6 76.3 77.1 2.3 99937.0 84267.7 0.0 82867.0 0.0 215194434 71453710 67505880 82.9 82.9 81.4 81.8 7.0 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

wr I l'~'II UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

l 50-389 ST LUCIE Ui4T 2 01/04/95 J.A.ROGERS (407)468/415./,'EPORT MONTH No., Type'uration Reason'ethod of Shutting Down Reactor'icensee Event Report System Code'omponent Code'ause&Conective Action to Prevent Recurrence 13 941211 0.0 B N/A HF HfEXCH Unit 2 at reduced power for waterbox cleaning.F Forced S Scheduled Reason A-Erluipmnt failure (explain)8-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)II-Other (Explain)Method I-Manua!2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Rcport (LER)File (NUREGOI61)

Exhibit I-Same Source WV Ig~~E r'