Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
':.ACCELERATE DOCUMENT'T DIS'I'RIB
'I'IONSYSTEMREGULATINFORMATION DISTRIBUTION STEM(RIDS)CCESSIONNBR:9309170236 DOC.DATE:
'PO&jKSXNOTARIZED:
NOFACIL:50-335 St.LuciePlant,Unit1,FloridaPoweraLightCo.50-389St.LuciePlant,Unit2,FloridaPower6LightCo.AUTH.NAMEAUTHORAFFILIATION WHITEiC.FloridaPower6LightCo.SAGER,D.A.
FloridaPower6LightCo.RECIP.NAME RECIPIENT AFFILIATION DOCKETN0500033505000389
SUBJECT:
MonthlocratingreptsforAug1993forStLucie,units 1&2.W/30913ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:SRECIPIENT IDCODE/NAME PD2-2LANORRIS,JINTERNAL:
ACRSAEOD/DSP/TPAB NRR/DRIL/RPEB RGN2EXTERNAL:
EGSGBRYCE,J.H NSICCOPIESLTTRENCL331110101111111111RECIPIENT IDCODE/NAME PD2-2PDAEOD/DOARDORSOEABRE01NRCPDRCOPIESLTTRENCL1111111111DNOTETOALL"RIDS"RECIPIENTS:
PLEASEHELPUSTOREDUCEWASTE!CONTACI'IIE DOCUMENTCON'I'ROL DI'SV,ROOMPl-37(EXT.504-2065)
TOELIMINATE YOURNAMEFROMDISTRII3U'I'ION LISTSFORDOCUMENTS YOUDON'TNEED!DTOTALNUMBEROFCOPIESREQUIRED:
LTTR24ENCL24 I
P.O.Box1,Ft.Pierce,FL34954-0128 September 13,1993L-93-23110CFR50.36U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Re:St.LucieUnits1and2DocketNos~50-335and50-389AttachedaretheAugust,1993,Operating StatusandSummaryofOperating Experience ReportsforSt.LucieUnits1and2.Shouldtherebeanyquestions onthisinformation, pleasecontactus.Verytrulyyours,D.A.ViceSt.LugersidentePlantDAS/CDW/kw cc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlantAttachments DAS/PSL¹986-939309170236 S'30831PDRADOCK05000335jc'UUDOanFPLGroupcompany tIIJI~~enaW>'
AVERAGEDAILYUNITPOWERLEVELDOCKETNO.:UNIT:DATECOMPLETED BY:TELEPHONE:
50-335St.Lucieg19/9/93C.WHITE(407)468-4248MONTHAUGUST1993DAY8/01/938/02/938/03/938/04/938/05/938/06/938/07/938/08/938/09/938/10/938/11/938/12/938/13/938/14/938/15/938/16/938/17/938/18/938/19/938/20/938/21/938/22/938/23/938/24/938/25/938/26/938/27/938/28/938/29/938/30/938/31/93AVERAGEDAILYPOWERLEVEL(MWe-Net) 848847848852851853855856852849844843842846851847844843848844841840841838839785827841840637478 OPERATING DATAREPORTOPERATING STATUSDOCKETNO50-335DATE9/9/93COMPLETED BYC.D.WHITETELEPHONE 407/468/4248 1.UNITNAME:ST.LUCXEUNIT12.REPORTING PERIOD:AUGUST19933.LICENSEDTHERMALPOWER(MWT):27004.NAMEPLATE RATING(GROSSMWE):8505.DESIGNELECTRICAL RATING(NETMWE):8306.MAXIMUMDEPENDABLE CAPACITY(GROSSMWE):8727.MAXIMUMDEPENDABLE CAPACITY(NETMWE):8398.XFCHANGESOCCURINCAPACITYRATINGS(ITEMSNUMBER'THROUGH7)SINCELASTREPORT,GIVEREASONS:9.POWERLEVELTOWHICHRESTRICTED, IFANY(NETMWE)10.REASONSFORRESTRICTIONS, IFANY:MONTHLY-YTD-CUMULATIVE 11.HOURSINREPORTPERIOD:12.NUMBEROFHOURSREACTORWASCRXTICAL13.REACTORRESERVESHUTDOWNHOURS14.HOURSGENERATOR ON-LINE15.UNITRESERVESHUTDOWNHOURS16.GROSSTHERMALENERGYGENERATED (MWH)17.GROSSELECTRICAL ENERGYGENERATED (MWH)18.NETELECTRICAL ENERGYGENERATED (MWH)19.UNITSERVICEFACTOR20.UNITAVAILABXLXTY FACTOR21'APACITYFACTOR(USINGMDCNET)22'APACITYFACTOR(USINGDERNET)23.UNITFORCEDOUTAGERATE24.SHUTDOWNS SCHEDULED OVERNEXT6MONTHS744744.00.0744.00.01964337647140613680100.0100.098.399.40.058314024.30.03891.20.0102621043400210320836066.766.765.666.30.0146351.0112694.9205.3111566.739.3288597814 952601109003423076.276.375.775.03.925.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATED DATEOFSTARTUP:
UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.:50-335UNITNAME:STLUCIEUNITIDATE:9/9/93COMPLETED BY:C.D.WHITETELEPHONE:
(407)468-4248REPORTMONTHAGT1No.DateTypeDuration(Hours)ReasonMethodofShuttingDownReactorLicenseeEventReportSystemCode'omponent CodesCause&Corrective ActiontoPreventRecurrence 9308300.0BN/AHFPUMPXXUnit1decreased powerduetoacirculating waterpumplowlubewaterflowalarm.Unit1wasreturnedto1009opoweronSeptember 1,1993.FForcedSScheduled ReasonA-Equipment failure(explain)
B-Maintenance orTestC-Refueling D-Regulatory restriction E-OperatorTrainingdtLicenseExamination F-Administrative G-Operational Error(Explain)
H-Other(Explain)
Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain)
ExhibitG-Instructions forPreparation ofDataEntrySheetsLicensccEventRcport(LER)File(NUREG4161)
Exhibit1-SameSource SUMMARYOFOPERATING EXPERIENCE DOCKETNO.:UNIT:DATE:COMPLETED BY:TELEPHONE:
50-335St.Lucieg19/9/93C.WHITE(407)468-4248REPORTMONTHAUGUST1993Unit1decreased poweronAugust30,1993duetoacirculating waterpumplowlubewaterflowalarm.Theunitwasreturnedto1004poweronSeptember 1,1993.Excluding thisperiod,Unit1operatedatorabove804forthemonthofAugust.Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod.
AVERAGEDAILYUNITPOWERLEVELDOCKETNO.:UNIT:DATE:COMPLETED BYTELEPHONE:
50-389St.Lucieg29/9/93C.WHITE(407)468-4248MONTHAUGUSTi1993DAY8/01/938/02/938/03/938/04/938/05/938/06/938/07/938/08/938/09/938/10/938/11/938/12/938/13/938/14/938/15/938/16/938/17/938/18/938/19/938/20/938/21/938/22/938/23/938/24/938/25/938/26/938/27/938/28/938/29/938/30/938/31/93AVERAGEDAILYPOWERLEVEL(MWe-Net) 831828827829828828828785130-32551837837838841833828825828821803781766747701450542800825822805 OPERATING DATAREPORTOPERATXNG STATUSDOCKETNO50-389DATE9/9/93COMPLETED BYC.D.WHITETELEPHONE 407/468/4248 1.UNITNAME:ST.LUCIEUNIT22.REPORTING PERIOD:AUGUST19933.LICENSEDTHERMALPOWER(MWT):27004.NAMEPLATE RATING(GROSSMWE):8505.DESIGNELECTRICAL RATING(NETMWE):8306.MAXIMUMDEPENDABLE CAPACITY(GROSSMWE):8827.MAXIMUMDEPENDABLE CAPACITY(NETMWE):8398.IFCHANGESOCCURXNCAPACITYRATINGS(ITEMSNUMBER3THROUGH7)SINCELASTREPORT~GIVEREASONS9.POWERLEVELTOWHICHRESTRICTED, IFANY(NETMWE)10.REASONSFORRESTRICTIONS, IFANY:MONTHLY-YTD-CUMULATIVE 11.HOURSINREPORTPERIOD:12.NUMBEROFHOURSREACTORWASCRITICAL13.REACTORRESERVESHUTDOWNHOURS14.HOURSGENERATOR ON-LINE15.UNITRESERVESHUTDOWNHOURS16.GROSSTHERMALENERGYGENERATED (MWH)17.GROSSELECTRICAL ENERGYGENERATED (MWH)18.NETELECTRICAL ENERGYGENERATED (MWH)19.UNITSERVICEFACTOR20.UNITAVAILABILITY FACTOR21.CAPACITYFACTOR(USINGMDCNET)22.CAPACITYFACTOR(USINGDERNET)23.UNITFORCEDOUTAGERATE24'HUTDOWNS SCHEDULED OVERNEXT6MONTHSCycle8Refueling Outagescheduled tobegin744744.00.0700.70.0179918458000054626294.294.287.588.55.858313842.80.03785.80.097474973181800298735764.964.961.161.735.1February15,1994.88248.074247.10.072991.20.0191112499 636614506017909982.782.782.482.77.6125.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATED DATEOFSTARTUP:
UNITSHUTDOWNS AI'K)POWERREDUCTIONS DOCKETNO.:50-389UNITNAME:STLUCIEUNIT2DATE:9/9/93COMPLETED BY:C.D.WHH'ETELEPHONE:
(407)468-4248REPORTMONTHAUGUST13No.DateType'uration (Hours)ReasonMethodofShuttingDownReactorLicenseeEventReportSystemCode'omponent CodesCause&Corrective ActiontoPreventRecurrence 1214159308099308109308259308270.043.30.00.0BBBBN/AN/AN/AN/ACBXXXXXXCBXXXXXXCBXXXXXXHBVALVEXUnit2reducedpowerduetobackpressure duringwaterboxcleaning.
Unit2wastakenoff-lineduetoacondenser tubeleak,detectedduringwaterboxcleaning.
Unit2reducedpowerforwaterboxcleaning.
Unit2reducedpowertorepair0'1governorvalve.FForcedSSchcdulcd ReasonA-Equipment failure(explain)
B-Maintenance orTestC-Refueling D-Regulatory restriction E-OperatorTraining&,LicenseExamination F-Administrative G-Operational Error(Explain)
H-Other(Explain)
Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain)
ExhibitG-Instructions forPreparation ofDataEntryShcctsLiccnsccEventRcport(LER)File(NUREG4161)
Exhibit1-SameSource SUMMARYOFOPERATING EXPERIENCE DOCKETNO.:UNIT:DATECOMPLETED BY:TELEPHONE:
50-389St.Lucieg29/9/93C.WHITE(407)468-4248REPORTMONTHAUGUST1993Unit2decreased poweronAugust9,1993forwaterboxcleaning.
OnAugust10,1993theunitwastakenoff-lineduetoacondenser tubeleak,detectedduringwaterboxcleaning.
TheunitwasreturnedtofullpoweronAugust12,1993.FromAugust25toAugust27,1993,theunitdecreased powerforwaterboxcleaningandtorepairtheg1governorvalve.Excluding theseperiods,Unit2operatedatorabove80%forthemonthofAugust,1993.Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod.