Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
CATEGORY1REGULAATONFORMATION DISTRIBUTION 1EM(RIDS)ACCESSION NBR:9705200374 DOC.DATE:
97/04/30NOTARIZED:
NOFACIL:50-335 St.LuciePlant,Unit1,FloridaPower&LightCo.50-389St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATION ROGERS,J.A.
FloridaPower&LightCo.STALL,J.A.
FloridaPower&LightCo.RECIP.NAMERECIPIENT AFFILIATION DOCKETI0500033505000389
SUBJECT:
Monthlyoperating reptsforApr1997forStLucieUnits12.W/970513 ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:INTERNAL'ECIPIENT IDCODE/NAME PD2-3PDFILECENT01OCPADCOPIESLTTRENCL11111111RECIPIENT IDCODE/NAME WIENS,L.AEOD/SPD/RRAB NRR/DRPM/PECB RGN2COPIESLTTRENCL11111111EXTERNAL:
LITCOBRYCE,JHNRCPDR1111NOAC11NOTETOALL"RIDS"RECIPIENTS!
PLEASEHELPUSTOREDUCEWASTE!CONTACTTHEDOCUMENTCONTROLDESK,ROOMOWFN5D-5(EKT.
415-2083)
TOELIMINATE YOURNOAEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEEDITOTALNUMBEROFCOPIESREQUIRED:
LTTR11ENCL11r
).~l4'I 0FloridaPower&LightCompany,6501SouthOceanDrive,JensenBeach,FL34957May13,1997L-97-12910CFR50.36U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Re:St.LucieUnits1and2DocketNos.50-335and50-389Monthl~perating3kcport PursuanttoTechnical Specification 6.9.1.6,attachedaretheApril1997,Operating DataReport,SummaryofOperating Experience Report,AverageDailyUnitPowerLevel,andUnitShutdowns andPowerReductions forSt.LucieUnits1and2.Shouldtherebeanyquestions onthisinformation, pleasecontactus.Verytrulyyours,J.A.StallVicePresident St.LuciePlantJAS/sptAttachments cc:RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlant'7705200374
'770430PDRADQCK05000335RPDRff!fff!IllllfllflllffllIfllIfllffff anFPLGroupcompany PUvl' OPERATING DATAREPORTOPERATING STATUSDOCKETNO50-335DATE05/05/97FPLLICENSING GROUP-PSLTELEPHONE 561/467/7296 1.UNITNAME:ST.LUCIEUNIT12.REPORTING PERIOD:APRIL19973.LICENSEDTHERMALPOWER(MWT):27004.NAMEPLATE RATING(GROSSMWE):8505.DESIGNELECTRICAL RATING(NETMWE):8306.MAXIMUMDEPENDABLE CAPACITY(GROSSMWE):8727.MAXIMUMDEPENDABLE CAPACITY(NETMWE):8398.IFCHANGESOCCURINCAPACITYRATINGS(ITEMSNUMBER3THROUGH7)SINCELASTREPORT,GIVEREASONS:9.POWERLEVELTOWHZCHRESTRICTED, IFANY(NETMWE)10.REASONSFORRESTRICTIONS, IFANY:MONTHLY-YTD-CUMULATIVE 11.HOURSINREPORTPERIOD:12.NUMBEROFHOURSREACTORWASCRITICAL13.REACTORRESERVESHUTDOWNHOURS14.HOURSGENERATOR ONLINE15.UNITRESERVESHUTDOWNHOURS16.GROSSTHERMALENERGYGENERATED (MWH)17.GROSSELECTRICAL ENERGYGENERATED (MWH)18.NETELECTRICAL ENERGYGENERATED (MWH)19.UNITSERVICEFACTOR20.UNITAVAILABILITY FACTOR21.CAPACITYFACTOR(USINGMDCNET)22.CAPACITYFACTOR(USINGDERNET)23.UNITFORCEDOUTAGERATE719.0627.90.0619.60.0164968954239051215686.286.284.985.813.82879.02729.50.02715.00.072611442400630227482894.394.394.295.25.7178463.0137397.10.0137812.10.0357590127 117918660 111442141 77.077.074.475.25.024.SHUTDOWNS SCHEDULED OVERNEXT6MONTHS:October20,1997Refueling Outage25.ZFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATED DATEOFSTARTUP:
UMMAYFPERATIEXPERIEDOCKETNO.:UNIT:DATE:COMPLETED BY:TELEPHONE:
50-335St.Lucie51May5,1997J.A.ROGERS (561)467-7296Unit1operatedatfullpowerthroughApril17.OnApril18theunitbegandownpower torepairaleakonthe1B2SafetyInjection TankheaderventvalveV-3815.Theunitwasremovedfromserviceat0031onApril19.Mode3wasenteredat0228.Mode4wasenteredat1405.OnApril20at0315theunitenteredMode5.OnApril21at0540Mode4wasenteredandMode3at1545.OnApril22Mode2wasenteredat2136andthereactorwentcriticalat2200.TheunitenteredMode1at0153onA'pril23andreturnedtoserviceat0355.Fullpowerreachedat0600onApril24.Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothepoweroperatedreliefvalvesorthesafetyvalvesduringthereportperiod.
AVERAGEDAILITPOWERLEVELMONTHApril,1997DOCKETNO.50-335UNITSaintLucio0'1DATEMay05,1997COMPLETED BYJ.A.RogersTELEPHONE (561)467-7296DAY04/01/9704/02/9704/03/9704/04/9704/05/9704/06/9704/07/9704/08/9704/09/9704/10/9704/11/9704/12/9704/13/9704/14/9704/15/9704/16/9704/17/9704/18/9704/19/9704/20/97-04/21/9704/22/9704/23/9704/24/9704/25/9704/26/9704/27/9704/28/9704/29/9704/30/97AVERAGEDAILYPOWERLEVEL(MWe-Not) 8448458458458458448448438428428448448448438448458487890000452840844839840840842843 UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.:UNITNAME:DATE:COMPLETED BY:TELEPHONE:
50-335STLUCIEUNIT1May5,1997J.A.Rogers(561)467-7296REPORTMONTHNO.DateType'uration (Hours)Reason'ethod ofShuttingDownReactor'icensee EventReportgSystemCode'omponent CodesCause&Corrective ActiontoPreventRecurrence 4/18/970.0N/ACJACCUMUUnitdownpowered duetoleakon1B2SafetyInjection Tankheadervalve.4/19/9799.497-005CJACCUMUUnit1offlinetorepairleakon182SafetyXnjection Tankheadervalve.1FForcedSScheduled 2ReasonA-Equipment failure(explain)
B-Maintenance orTestC-Refueling D-Regulatory restriction E-OperatorTraining&LicenseExamination F-Administrative G-Operational Error(Explain)
H-Other(Explain) 3Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain) 4ExhibitG-Instructions forPreparation ofDataEntrySheetsLicenseeEventReport(IER)File(NUREG-0161) 5Exhibit1-SameSourceOsxss7ppf OPERATING DATAREPORTOPERATING STATUSDOCKETNO50-389DATE05/05/97FPLLICENSING GROUP-PSLTELEPHONE 561/467/7296 1.UNITNAME:ST.LUCIEUNIT22.REPORTING PERIOD:APRIL19973.LICENSEDTHERMALPOWER(MWT):27004.NAMEPLATE RATING(GROSSMWE):8505.DESIGNELECTRICAL RATING(NETMWE):8306.MAXIMUMDEPENDABLE CAPACITY(GROSSMWE):8827.MAXIMUMDEPENDABLE CAPACITY(NETMWE):8398.IFCHANGESOCCURINCAPACITYRATINGS(ITEMSNUMBER3THROUGH7)SINCELASTREPORT,GIVEREASONS:9.POWERLEVELTOWHICHRESTRlCTED, IFANY(NETMWE)10REASONSFORRESTRICTIONS gZFANYMONTHLY-YTD-CUMULATIVE 11.HOURSINREPORTPERIOD:12.NUMBEROFHOURSREACTORWASCRITICAL13.REACTORRESERVESHUTDOWNHOURS14.HOURSGENERATOR ONLINE15.UNITRESERVESHUTDOWNHOURS16.GROSSTHERMALENERGYGENERATED (MWH)17.GROSSELECTRICAL ENERGYGENERATED (MWH)18.NETELECTRICAL ENERGYGENERATED (MWH)19.UNITSERVICEFACTOR20.UNITAVAILABILITY FACTOR21.CAPACITYFACTOR(USINGMDCNET)22.CAPACITYFACTOR(USINGDERNET)23.UNITFORCEDOUTAGERATE719.0312.00.0311.00.082290926869025308343.343.342.042.40.02879.02472.00.02471.00.065828142158950204552285.885.884.785.60.0120360'101914.20.0100355.20.0261433946 905974508181298683.483.481.082.76.224.SHUTDOWNS SCHEDULED OVERNEXT6MONTHS:25.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATED DATEOFSTARTUP:May26,1997 YFPERATEXPEEEDOCKETNO.:UNIT:DATE:COMPLETED BY:TELEPHONE:
50-389St.LucieN2May5,1997Z.A.ROGERS (561)467-7296REPORTMONTHr11Unit2operatedatfullpowerthroughApril11.OnApril12theunitbegantodownpower formainsteamsafetyvalvetesting,reachingapproximately 82%power.At1805onApril13theunitbeganfurtherdownpowering.
At0001onApril14theunitwasremovedfromserviceforCycle10refueling andmaintenance.
Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothepoweroperatedreliefvalvesorthesafetyvalvesduringthereportperiod.
AVERAGEDAILITPOWERLEVELMONTHApril,1997DAYAVERAGE04/01/9704/02/9704/03/9704/04/9704/05/9704/06/9704/07/9704/08/9704/09/9704/10/9704/11/9704/12/9704/13/9704/14/9704/15/9704/16/9704/17/9704/18/9704/19/9704/20/9704/21/9704/22/9704/23/9704/24/9704/25/9704/26/9704/27/9704/28/9704/29/9704/30/97DOCKETNO.50-389UNITSaintLucie//2DATEMay05,1997COMPLETED BYJ.A.RogersTELEPHONE
{561)467-7296DAILYPOWERLEVEL(MWe-Net) 83783883783883783883783683583783682161200000000000000000
UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.:UNITNAME:DATE:COMPLETED BY:TELEPHONE:
50-389STLUCIE;UNIT 2May5,1997J.A.ROGERS (561)467-7296No.DateType'uration (Hours)Reason'ethod ofShuttingDownReactor9LicenseeEventReportISystemCode'omponent Code9Cause&Corrective ActiontoPreventRecurrence 4/12/970.0N/AHBVALVESUnit2downpowered fortestingofthemainsteamsafetyvalves.4/13/970.0N/AVESSELUnit2furtherdownpowered forrefueling andmaintenance.
5.4/14/97407.9N/AVESSELUnit2offlineforCycle10refueling andmaintenance.
F,ForcedSScheduled ReasonA-Equipment failure(explain)
B-Maintenance orTestC-Refueling D-Regulatory restriction E-OperatorTraining&LicenseExamination F-Administrative G-Operational Error(Explain)
H-Other(Explain)
Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain)
ExhibitG-Instructions forPreparation ofDataEntrySheetsLicenseeEventReport(LER)File(NUREG-0161)
Exhibit1-SameSource0915STFPL
.04f,Pg