|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7291998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for St Lucie,Units 1 & 2.W/980512 Ltr ML17229A6831998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for St Lucie,Units 1 & 2.W/980410 Ltr ML17229A6641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for St Lucie,Units 1 & 2.W/980310 Ltr ML17229A6231998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for St Lucie,Units 1 & 2.W/980213 Ltr ML17229A5811997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for St Lucie,Units 1 & 2.W/980108 Ltr ML17229A5541997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for St Lucie,Units 1 & 2.W/971211 Ltr ML17229A5281997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for St Lucie, Units 1 & 2.W/971113 Ltr ML17229A5011997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for St Lucie,Units 1 & 2.W/971014 Ltr ML17229A4711997-08-31031 August 1997 Monthly Operating Repts for August 1997 for St Lucie. W/970908 Ltr ML17229A4451997-07-31031 July 1997 Monthly Operating Repts for July 1997 for St Lucie.W/970808 Ltr ML17229A3991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for St Lucie.W/970710 Ltr ML17229A3791997-05-31031 May 1997 Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2.W/970612 Ltr ML17229A3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2.W/970513 Ltr ML17229A3041997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for St. Lucie, Units 1 & 2.W/970410 Ltr ML17229A2651997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for St Lucie Units 1 & 2.W/970313 Ltr ML17229A2351997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for St Lucie Units 1 & 2.W/970214 Ltr ML17229A2001996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for St Lucie,Units 1 & 2.W/970113 Ltr ML17229A1711996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for St Lucie Units 1 & 2.W/961216 Ltr ML17229A1361996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for St.Lucie Unit 1 & 2 ML17229A0691996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for St Lucie Units 1 & 2.W/961011 Ltr ML17229A1391996-09-30030 September 1996 Revised Monthly Operating Rept for Sept 1996 for St.Lucie Unit 2 ML17229A0361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for St Lucie Units 1 & 2.W/960911 Ltr ML17229A0051996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2.W/960812 Ltr ML17228B5701996-06-30030 June 1996 Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2.W/960715 Ltr ML17228B5261996-05-31031 May 1996 Monthly Operating Repts for May 1996 for St Lucie Units 1 & 2.W/960612 Ltr ML17228B4941996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for St Lucie Units 1 & 2.W/960510 Ltr ML17228B4651996-03-31031 March 1996 Monthly Operating Repts for March 1996 for SLP.W/960412 Ltr ML17228B4201996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for St Lucie Units 1 & 2.W/960312 Ltr ML17228B4021996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for St Lucie.W/960214 Ltr ML17228B3831995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for St Lucie Nuclear Power Plant Units 1 & 2.W/960116 Ltr ML17228B3621995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for St Lucie. W/951212 Ltr ML17228B3261995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for St Lucie.W/951112 Ltr ML17228B2911995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for St Lucie Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML17241A4891999-10-0707 October 1999 LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr ML17241A4951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr ML17241A4741999-08-31031 August 1999 Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. ML17241A4591999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr ML17241A4301999-07-31031 July 1999 Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr ML17241A4111999-07-16016 July 1999 LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr ML17241A4031999-07-0606 July 1999 LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr ML17241A4041999-07-0606 July 1999 LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr ML17241A4091999-06-30030 June 1999 Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr ML17241A3941999-06-30030 June 1999 LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17241A3551999-06-0404 June 1999 LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr ML17241A3631999-05-31031 May 1999 Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr ML17241A3321999-05-17017 May 1999 LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 ML17241A3271999-05-0606 May 1999 LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr ML17241A3331999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for St Lucie,Units 1 & 2.With 990517 Ltr ML17229B0801999-04-0707 April 1999 LER 99-002-00:on 990311,SG ECT Error Caused Operation with Condition Prohibited by Ts.Caused by Deficiencies in Data Analysis Guideline Instructions.Licensee Will Change Data Analysis Guidelines for Lead Analysts.With 990407 Ltr ML17229B0841999-04-0707 April 1999 Rev 2 to PSL-ENG-SEMS-98-102, Engineering Evaluation of ECCS Suction Lines. ML17229B0791999-04-0707 April 1999 LER 99-001-00:on 990309,discovered Inadequate Design & IST SRs for Iodine Removal Sys (Irs).Caused by Original Design Inadequacies & Personnel Error.Naoh Tank Vent Valve V07233 Was Tagged Open.With 990407 Ltr ML17229B0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for St Lucie,Units 1 & 2.With 990408 Ltr ML17229B0541999-03-10010 March 1999 LER 99-001-00:on 990211,inadequate TS SRs for SIT & SDC Isolation Valves Were Noted.Caused by Failure to Correctly Implement TS Srs.Submitted LAR to Align Required TS SR with Design Bases Requirements Being Verified.With 990310 Ltr ML17229B0461999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for St Lucie,Units 1 & 2.With 990310 Ltr ML17229B0051999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for St Lucie,Units 1 & 2.With 990211 Ltr ML17229A9901999-01-20020 January 1999 LER 98-009-00:on 981223,noted That Facility Operated Outside of Design Basis.Caused by non-conservative MSLB Analysis Inputs.Will Review SR Component Differences Between Units & Will re-baseline LTOP Analysis.With 990120 Ltr ML17229A9961999-01-14014 January 1999 SG Tube Inservice Insp Special Rept. ML17229A9821999-01-0404 January 1999 LER 98-010-00:on 981207,RCS Boron Sample Frequency Required by Ts,Was Exceeded by Twelve Minutes.Caused by Personnel Error.Equipment Clearance Order Was Lifted to Draw Required Sample & Operations Procedure Was Changed.With 990104 Ltr ML17229A9831998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for St Lucie,Units 1 & 2.With 990111 Ltr ML17229A9611998-12-22022 December 1998 LER 97-002-01:on 981204,containment Sump Debris Screen Was Not IAW Design.Caused by Inadequate C/As for Sump Screen Anamolies.All Identified Sump Screen Deficiencies Were Dispositioned &/Or Repaired.With 981222 Ltr ML17229A9561998-12-15015 December 1998 LER 98-008-00:on 981118,missed TS SG U Tube Insp.Caused by Encoding Errors While Using Remote Positioning Fixtures.All SG Tube Surveyed.With 981215 Ltr ML17241A3581998-12-0909 December 1998 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 970526-981209. ML17229A9421998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for St Lucie,Units 1 & 2.With 981215 Ltr ML17229A9301998-11-25025 November 1998 LER 98-005-01:on 980807,discovered That New MOV Methodology Caused Past PORV Block Valve Operability Problem.Caused by Inadequacies in Original Vendor MOV Methodology.Planned Valve Mods Will Be Implemented During Cycle 11 1998 Outage ML17229A9021998-11-0404 November 1998 LER 98-008-00:on 981008,inadequate Reactor Protection Sys Trip Bypass TS Was Noted.Caused by Poorly Worded Ts. Submitted LAR to Clarify Power Requirements for High Rate of Power Trips.With 981104 Ltr ML17241A4931998-11-0101 November 1998 Statement of Account for Period of 981101-990930 for Suntrust Bank,As Trustee for Florida Municipal Power Agency Nuclear Decommissioning Trust (St Lucie Project). ML17229A9051998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for St Lucie,Units 1 & 2.With 981110 Ltr ML17229A8871998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1 Which Was Machined with Improper Length.C/A Includes Insp Equipment That Will 100% Identify Short Length ML17229A8781998-10-19019 October 1998 Part 21 Rept Re Potential Defect in Swagelok Stainless Steel Front Ferrule,Part Number SS-503-1,which Was Machined with Improper Length.Insp Equipment That Will 100% Identify Short Length ML17229A8771998-10-14014 October 1998 LER 98-006-00:on 980918,inadvertent Afas Actuation Was Noted.Caused by Degradation of Multiple Afas Power Supplies. Replaced Afas Power Supplies & Revised Procedures.With 981014 Ltr ML17229A8761998-10-14014 October 1998 LER 98-007-00:on 980918,identified Discrepancies Between Fire Protection Design Requirements & Field Conditions. Caused by Inadequate Translation & Implementation of Fire Protection Requirements.Procedures Revised.With 981014 Ltr ML17229A8721998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr ML17229A8511998-09-0202 September 1998 LER 98-005-00:on 980807,discovered That PORV Margins Were Insufficient to Accommodate Addl Conservatism.Caused by Inadequacies in Original Vendor MOV Methodology.Will Implement Planned Valve Actuator mods.W/980902 Ltr ML17229A8611998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for St Lucie,Units 1 & 2.With 980911 Ltr ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML17229A8481998-08-0707 August 1998 Rev 1 to PSL-ENG-SEFJ-98-013, St Lucie Unit 2,Cycle 10 Colr. ML17229A9461998-08-0707 August 1998 Rev 0 to PCM 98016, St Lucie Unit 2,Cycle 11 Colr. ML17229A8301998-07-31031 July 1998 Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr ML17229A8201998-07-29029 July 1998 LER 98-007-00:on 980630,inadequate Procedure May Have Resulted in SBO Recovery Complications.Caused by Inadequate Procedures.Attached Caution Tags to Appropriate Control switches.W/980729 Ltr ML17229A7981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for St Lucie,Units 1 & 2.W/980713 Ltr ML17229A7701998-05-31031 May 1998 Monthly Operating Repts for May 1998 for St Lucie,Units 1 & 2.W/980612 Ltr ML17229A7411998-05-28028 May 1998 LER 98-004-00:on 980430,discovered Waste Gas Decay Tank Operation W/O Available Oxygen Analyzers,Which Is Prohibited by Ts.Caused by Inadequate Licensee Review of License Amend. Oxygen Analyzer recalibrated.W/980528 Ltr 1999-09-30
[Table view] |
Text
ACCELERATEDDISTRJBUTIONDEMONSTRATIONSYSTEMREGULAT.INFORMATIONDISTRIBUTIOSYSTEM(RIDS)Act,.ESSIONNBR:920FACIL:50-335St,50-389St.AUTH.NAMEBREEN,J.J.SAGER,D.A.RECIP.NAMELuciePlant,Unit1,FloridaPower&LightCo.LuciePlant,Unit2,FloridaPoweraLightCo.AUTHORAFFILIATIONFloridaPower6LightCo.FloridaPower&LightCo.RECIPIENTAFFILIATIONDOCKET0500033505000389
SUBJECT:
MontcratingreptsforJan1992forStLucieUnits162.920218tr.DISTRIBUTIONCODE:IE24DCOPIESRECEIVED:LTRjENCL(TITLE:MonthlyOperatingReport(perTechSpecs)NOTES:SIZE:RECIPIENTIDCODE/NAMEPD2-2LANORRIS,JINTERNAL:ACRSAEOD/DSP/TPABNRR/DOEA/OEABRGN2COPIESLTTRENCL33111010111111RECIPIENTIDCODE/NAMEPD2-2PDAEOD/DOANRR/JDLRQPEB10G5'TER01COPIESLTTRENCL11111111EXTERNAL:EGGGBRYCE,J.HNSIC1111NRCPDR11NOTETOALL"RIDS"RECIPIENTS:PLEASEHELPUSTOREDUCEWASFEICONTACTTHEDOCUMENTCONTROLDESKROOMPl-37(EXT.20079)TOELIMINATEYOURNAMEFROMDISTRIBUTIONLISTSFORDOCUMENTSYOUDON'TNEEDlTOTALNUMBEROFCOPIESREQUIRED:LTTR24ENCL24 P.O.Bex128,Ft.Pierce,FL34954-0128February18,1992L-92-3310CFR50-36U.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,DC20555Gentlemen:Re:St.LucieUnits1and2DocketNos.50-335and50-389Monthl0eratinReortAttachedaretheJanuary1992OperatingStatusandSummaryofOperatingExperienceReportsforSt.LucieUnits1and2.Shouldyouhaveanyquestionsonthisinformation,pleasecontactus~Verytrulyyouxs,D.A.gerVicersidentSt.LiePlantDAS.JJBkwcc:StewartD.Ebneter,RegionalAdministrator,RegionII,USNRCSeniorResidentInspector,USNRC,St.LuciePlantAttachmentsDAS/PSL$617-929p02p~03rrr7rrr20131PDRADOCK05000335~Ri!'IDR8nFPLGroupcompany 3'fiA~l~
~~AVERAGEDAILYUNITPOMERLEVELDOCKETNO~50-335DATECOMPLETEDBYJ..BreenTELEPHONE407468-4248MONTHJANUARY1992DAYAVERAGEDAILYPOSERLEVEL(MWe-Net)1/1/921/2/921/3/921/4/921/5/921/6/921/7/921/8/921/9/921/10/921/11/921/12/921/13/921/14/921/15/921/16/921/17/921/18/921/19/921/20/921/21/921/22/921/23/921/24/921/25/921/26/921/27/921/28/921/29/921/30/921/31/92861863863865866866866865866866865867866865865866869869869869871871870867868868869868866865867 OPERATINGDATAREPORTOPL'R*TINGSTATUSDQCf(ETNO50-33'ATEFEg$9532COMPLETEDBYJ.J,BREENTELEPI-lQNE407/468/42481.UNXTNAME+ST+LUCIEUNXT12iREPORTINGPERIOD:JANUARY19923.LICENSEDTHERMALPOWER(MWT):27004+NAMEPLATERATING(GROSSMWE)i850DESIGNELECTRXCALRATXNG(NETMWE):83e6+MAX:KMUMDEPENDABLECAPACITY(GROSSMWE>o8727.MAXIMUMDEPENDABLECAPACITY(NETMWE)l8398IFCHANGESOCCURXNC*PACITYRATXNGS(ITEMSNUMBER3THROUGH7)SINCEL*STREPORT~GIVEREASONS'+POWERLEVELTQWHXCHRESTRICTED'FANY(NETMWE>ieiREASONSFORRESTRICTIONSrIFANYiMONTHLY-YTD-CUMULATIVEh11+HOURSINREPORTPERXOD:12+NUMBEROFHOURSREACTORWASCPITIC*L13,REhCTORRESERVESHUTDOWNHOURS14+HOURSGENERATORON-LINE15.UNITRESERVESHUTDOWNHOURSlb.GROSSTHERMALENERGYGENERATED(MWH)17,GRO.SELECTRICALENERGYGENERATED(MWH>18.NETELECTRXCALENERGYGENERATED(MWH>19iUN:KTSERVICEFACTOR2e.UN:KTAVAILABILITYFACTOR21,CAPACITYF*CTOI'USINGMDCNET)22.CAPACITYFACTOR(USINGDERNET)23.UNITFORCEDOUTAGER*TE24.SHUTDOWNSSCHEDULEDOVERNEXT6MONTHS+744744ieO.e744.0etc2eo9eo8677950644796ieeieioo.eie3i31en.neiernn744ieewe7nn,eewe20o9ee867795e644796100.0100.e103.3104.40.013248e+eioe853.6205.3995'39'<<J9t32577362608=e1077e8032849275.475+575.e74ienii,25.XFSl-lUTDOWNATFNDOFREPORTPERIODESTXM*TEDDATEOFST*RTUP' J
UNITSHUTDOWNSANDPOWERREDUCTIONSDDDBBTND.~233UNITNAMESTLUCIEUNIT4DATEU1JZCOMPLETEDBYJ.JBREENTELEPHDNB~868248REPORTMONTHJANUARY12No.DateTypeDuration(Hours)ReasonsMethodofShuttingDownReactorLicenseeEventReportSystemCode'omponentCodeCause&CorrectiveActiontoPreventRecurrenceTheaveragedailypowerforUnit1forthemonthofJanuarywas100%.FFomcdSScheduledReasonA-Equipmentfailure(explain)B-MaintenanceorTestC-RefuelingD-RegulatoryrestrictionE-OperatorTrainingdcLicenseExaminationF-AdministrativeG-OperationalError(Expalin)H-Other(Explain)Method1-Manual2-ManualScram3-AutomaticScram4-Continued5-LoadReduction9-Olher(Explain)ExhibitG-InstructionsforpreparationofDataEntrySheetsLicensccEventReport(LER)File(NUREG4161)Exhibit1-SameSourcetelssrFPL
1~~~SUMMARYOFOPERATINGEXPERIENCEDOCKETN0050-335UNITSt.Lucie1DATECOMPLETEDBYJ.J.BreenTELEPHONE407468-4248REPORTMONTHJANUARY1992ForthemonthofJanuarytheaveragedailypowerforUnit1was1004.InaccordancewiththerequirementsofTechnicalSpecification6.9.1.6,therewerenochallengestothePORVsorsafetyvalvesduringthereportperiod.
AVERAGEDAILYUNITPOWERLEVELDOCKETNO~50-389UNITSt.Lucre2DATECOMPLETEDBYJ.J.BreenMONTHJANUARY1992DAYAVERAGEDAILYPOWERLEVEL(Mve-Net)1/921/2/921/3/921/4/921/5/921/6/921/7/921/8/921/9/921/10/921/11/921/12/921/13/92'1/14/921/15/921/16/921/17/921/18/921/19/921/20/921/21/921/22/921/23/921/24/921/25/921/26/921/27/921/28/921/29/921/30/921/31/92862864864865865865864863863860860861859859859860860860858857823548723745871791871871878869870 OPERATXHGDATAREPORTQPERATXNGSTATUSDQCI'ETNO50-389DATEPgg49>99t)COMPLETEDBYJJ.BREFHTELEPHONE407/468/4248UNXTNAME+SToLIJCXEUNXT22oRl::PORTXHGPERXOD:iJAHUARYi9923.LXCENSEDTHERMAII='OHER<MHT)f2708NAMEPLATERATXHG(GROSSMHE):850DESXGHIl:LECTRXCALRAT:I:HG<HETMHE):83<)6+MAXXMUMDEPENDABIECAI='ACXTY(GROSSMHE)o..8827+MAXXMUMDLPEHDABLEC*PACXTY(HETMHE)l8398.XFCHANGESOCCURXNCAPACXTYIATXHGS<XTEMSNUMBEI3THROUGH7)SXNCELASTREPORTGXVEREASONS;9iPOHERLEVELTQRHXCIIRESTRXCTFDrXFAHY(HETMWE)ie.REASONSFORRESTRXCTXONSXFANY:MONTHLY-YTD-CIJMULATXVEiii4~i3ti4.i5ii6+i7i8.i9.20.2ii22>23.24+IHOURS1NREPORTPERXODlNUMBEROFIIQURSREACTORHASCR1TXCALREACTORRESERVESHUTDOWNHOURSI-IOURSGENERATORON-L1HEUNXTRESERVESHUTDOHNIHOURSGROSSTHERMALENERGYGENERATED(MHI-I)GROSSELECTR1CALENERGYGENERATED(MHH)NETELECTRXCALEHFRGYGEHERATED(MHH)UHXTSERVXCEFACTORIJHXTAVAXLABXLXTYFACTORCAPACXTYFACTOR(USXNGMDCNET)CAPACXTYFACTOR(USXNGDERNET)UH1TFORCEDOUTAGERATEtSHIJTDOHHSSCHEDULEDQVFRNEXT6MOHTIISREFUELXNGSCHEDULED4/20/92FQR63DAYS744744iO0.0744iO0.0i96296066ne80625877i00.0Roe+0ie0.3i0i.40'744744.0ewe744+00+0i962960660088625877i00eOi00oei00i3iOi~40i074377,e64364i3eiO63348+3O.ei6607556653859ee5238872485<28&1285i45@i25.XFSl-IUTDQHHATEHDQFREPOR'I;PERXQDESTXMATEDDATEOFITARTUPl S1e~l'4'I STLCIEUNITSHUTDOWNSAI'43POWERREDUCTIONS0008BT062~60UNITNAMEDATECOMPLETEDBYJJ.BREENTBLBPHBNBL404468<248REPORTMONTHJAARY192No.DateTypeDuration(Hours)Reason~MethodofLicenseeShuttingEventReportDownReactorSystemCodeComponentCode'ause&CorrectiveActiontoPreventRecurrence9201219201229201239201230.00.00.00.0BBN/AN/AN/AN/AHHVALVEXHF3OCXXXXHFHTEXCHUnit2atapproximately669opowerforfeedwaterheaterinletvalverepair.Unit2heldatapproximately85%powerforwaterboxcleaning.Whileat85%powerthe2ATurbineCoolingWaterHeatExchangerwasdeclaredoutofservice.Unit2thenreducedpowerduetohighturbinebearingoiltemperature.Unit2heldatapproximately85%powerforwaterboxcleaning.FForecdSScheduledReasonA-Equipmentfailure(explain)B-MaintenanceorTestC-RefuelingD-RegulatoryrestrictionE-OperatorTrainingdcLicenseExaminationF-AdministrativeG-OperationalError(Expalin)H-Other(Explain)Method1-Manual2-ManualScram3-AutomaticScram4-Continued5-LoadReduction9-Other(Explain)ExhibitG-InstructionsforPreparationofDataEntrySheetsLiccnsceEventReport(LER)File(NUREG4161)Exhibit1-SameSource SUMMARYOFOPERATINGEXPERIENCEDOCKETNO.50-389UNITSt.Lucie2DATECOMPLETEDBYZ.Z.BreenREPORTMONTHJANUARY1992Unit2startedthemonthatfullpowerandremainedthereuntilJanuary22,1992.OnJanuary22,1992,Unit2wasatapproximately664powerforfeedwaterheaterinletvalverepair;uponcompletionofrepairUnit2ascendedinpowerandwasheldatapproximately854forwaterboxcleaning.OnJanuary23,1992,whileat854powerthe2ATurbineCoolingWaterHeatExchangerwasdeclaredoutofserviceandUnit2startedtoreducepowerduetohighturbinebearingoiltemperature.,AfteraboutanhourtheTurbineCoolingHeatExchangerwasbackinserviceandUnit2ascendedinpower;theUnitwasthenheldatapproximately854powerforwaterboxcleaning.OnJanuary25,1992,Unit2wasat1004powerandtheaveragedailypowerremainedabove804fortherestofthemonth.InaccordancewiththerequirementsofTechnicalSpecification6.9.1.6,therewerenochallengestothePORVsorsafetyvalvesduringthereportperiod.