Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability IR 05000458/19980041998-03-19019 March 1998 Insp Rept 50-458/98-04 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203L8831998-03-0404 March 1998 Insp Rept 50-458/98-01 on 980210-13.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During Fullscale,Biennial Exercise of Emergency Plan & Implementation Procedures ML20202B9401998-02-0606 February 1998 Insp Rept 50-458/97-19 on 971130-980110.Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000458/19970201998-02-0505 February 1998 Insp Rept 50-458/97-20 on 971008-15.Violations Noted.Major Areas Inspected:Plant Support IR 05000458/19980021998-02-0202 February 1998 Insp Rept 50-458/98-02 on 980112-16.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program, Including Access Authorization,Alarm Stations,Communication, Access Control of Personnel & Security Event Logs IR 05000458/19970181998-01-0606 January 1998 Insp Rept 50-458/97-18 on 971208-12.No Violations Noted. Major Areas Inspected:Maint & Engineering IR 05000458/19970121997-12-29029 December 1997 Insp Rept 50-458/97-12 on 971203-12.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program Following Guidelines in Insp Procedure 71001 ML20197G6191997-12-24024 December 1997 Insp Rept 50-458/97-17 on 971012-1129.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970151997-11-17017 November 1997 Insp Rept 50-458/97-15 on 970922-1017.Violations Noted: Inadequate Procedrual Controls for Bus Restoration Contributed to Loss of Shutdown Cooling for 17 Min & Failure to Maintain Adequate Procedures IR 05000458/19970141997-11-14014 November 1997 Insp Rept 50-458/97-14 on 970831-1011.Violation Noted. Major Areas Inspected:Operation,Maint,Enginerring & Plant Support IR 05000458/19970161997-10-28028 October 1997 Insp Rept 50-458/97-16 on 970929-1003.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000458/19970131997-09-26026 September 1997 Insp Rept 50-458/97-13 on 970720-0830.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000458/19970031997-09-10010 September 1997 Insp Rept 50-458/97-03 on 970804-08.Violations Noted.Major Areas Inspected:Implementation of Solid Radwaste Mgt & Radwaste & Matls Transportation Programs IR 05000458/19973011997-08-20020 August 1997 Insp Rept 50-458/97-301 on 970728-0801.No Violations Noted. Major Areas Inspected:Operations Examiners Evaluated Competency of Two Senior Reactor Operator & Three Reactor Operator License Applicants for Issuance of Licenses IR 05000458/19970101997-08-0606 August 1997 Insp Rept 50-458/97-10 on 970608-0719.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20149H1441997-07-21021 July 1997 Partially Withheld Insp Rept 50-458/97-11 on 970623-27.Major Areas Inspected:Specific Areas of Physical Security Program Including Review of Records & Repts,Testing & Maint,Vital Area Barriers & Detection Aids & Alarm Stations 1999-09-08
[Table view] Category:UTILITY
MONTHYEARIR 05000458/19900311990-11-19019 November 1990 Insp Rept 50-458/90-31 on 901105-09.No Violations or Deviations Noted.Major Areas Inspected:Verification of Isolation Component Exemptions IR 05000458/19900251990-11-0707 November 1990 Insp Rept 50-458/90-25 on 900924-28 & 1015-19.Noncited Violation Identified.Major Areas Inspected:Quality Verification Function Including Condition Rept Program, Internal Audit Program ML20058A5461990-10-17017 October 1990 Insp Rept 50-458/90-23 on 900910-14.No Violations or Deviations Noted.Major Areas Inspected:Engineering Evaluation in Response to NRC Bulletin 88-004,action of Previously Identified Items & Review of Root Cause Analysis IR 05000458/19900281990-10-17017 October 1990 Insp Rept 50-458/90-28 on 901009-12.No Violations or Deviations Noted.Major Areas Inspected:Installation & Testing of Mods & Installation of Heat Shrinkable Insulation Tubing IR 05000458/19900221990-09-27027 September 1990 Insp Rept 50-458/90-22 on 900827-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Liquid & Gaseous Radwaste Mgt Program ML20059D6471990-08-28028 August 1990 Insp Rept 50-458/90-15 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Operational Status of Emergency Preparedness Program,Including Followup to Previous Insp Findings & Equipment IR 05000458/19900201990-08-21021 August 1990 Insp Rept 50-458/90-20 on 900723-26.No Violations or Deviations Noted.Major Areas Inspected:Training & Qualification Effectiveness IR 05000458/19902001990-07-26026 July 1990 Electrical Distribution Sys Functional Insp Rept 50-458/90-200 on 900521-0622.No Violations Noted.Major Areas Inspected:Design & Implementation of Plant Electrical Distribution Sys & Adequacy of Engineering Support IR 05000458/19900171990-07-19019 July 1990 Advises That Insp 50-458/90-17 Canceled,Therefore,No Insp Rept Will Be Issued IR 05000458/19900141990-06-19019 June 1990 Insp Rept 50-458/90-14 on 900521-22.One self-identified Violation Noted.Major Areas Inspected:Licensee Occupational Radiation Protection Program Including High Radiation Area Controls IR 05000458/19890331989-09-21021 September 1989 Insp Rept 50-458/89-33 on 890801-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Maint Observation,Surveillance Test Observation,Ler Followup & Followup on 10CFR21 Repts IR 05000458/19890311989-08-29029 August 1989 Insp Rept 50-458/89-31 on 890701-31.Violations Noted.Major Areas Inspected:Operational Safety Verification,Maint & Surveillance Test Observation,Esf Walkdown & Emergency Preparedness Drill IR 05000458/19890301989-08-17017 August 1989 Insp Rept 50-458/89-30 on 890619-23.Violations Noted.Major Areas Inspected:Physical Security Program IR 05000458/19890191989-08-10010 August 1989 Advises That Insp 50-458/89-19 Cancelled & No Insp Rept Will Be Issued for Rept Number IR 05000458/19890321989-07-31031 July 1989 Insp Rept 50-458/89-32 on 890717-21.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Testing Program & Plant Instrumentation Calibr Program.Lists of Surveillance Test Performance & Loop Calibr Repts Encl IR 05000458/19890281989-07-27027 July 1989 Insp Rept 50-458/89-28 on 890601-30.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation & Licensee Action on Previous Insp Findings IR 05000458/19890251989-07-27027 July 1989 Insp Rept 50-458/89-25 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Startup Testing. Conservative Error in Util Procedure for Manual Calculations of Core Thermal Power Identified IR 05000458/19890291989-07-14014 July 1989 Insp Rept 50-458/89-29 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected:Corrective Actions IR 05000458/19890271989-07-12012 July 1989 Insp Rept 50-458/89-27 on 890605-09 & 19-23.Violations Noted.Major Areas Inspected:Self Assessment Capabilities IR 05000458/19890241989-06-26026 June 1989 Insp Rept 50-458/89-24 on 890501-31.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification & Maint & Surveillance Test Observation IR 05000458/19890221989-06-20020 June 1989 Insp Rept 50-458/89-22 on 890525-27.No Violations or Deviations Noted.Major Areas Inspected:Containment Integrated Leak Rate Test & Review of Results of Local Leak Rate Test IR 05000458/19890261989-06-14014 June 1989 Insp Rept 50-458/89-26 on 890515-19.No Violations Noted. Major Areas Inspected:Action on Previously Indentified Insp Findings,Inservice Insp Data Review & Corrective Actions IR 05000458/19890011989-06-0707 June 1989 Insp Rept 50-458/89-01 on 890501-05.No Violations Noted. Major Areas Inspected:Facility Mods & Nonlicensed Staff Training ML20244C3561989-06-0505 June 1989 Insp Rept 50-458/89-18 on 890501-05 & 15-19.Violations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves,Welding Activities Associated W/Repairs to Svc Water Sys & Activities Re Instrument Air Sys Insp IR 05000458/19890231989-05-25025 May 1989 Insp Repts 50-458/89-23 on 890501-05.No Violations or Deviations Noted.Major Areas Inspected:Programs for Station Design Changes & Mods for Installation of Raychem Electrical Splices IR 05000458/19890111989-05-24024 May 1989 Insp Rept 50-458/89-11 on 890315-0430.Violations Noted.Major Areas Inspected:Plant Events,Operational Safety Verification,Maint & Surveillance Test Observation,Refueling Activities & Licensee Action on Previous Findings IR 05000458/19890171989-05-16016 May 1989 Insp Rept 50-458/89-17 on 890409-19.Violations Noted.Major Areas Inspected:Radiation Protection Program,Including Planning & Preparation for in-reactor Pressure Vessel Repair of Feed Water Spargers ML20244D4511989-05-15015 May 1989 Partially Withheld Insp Rept 50-458/89-15 on 890402-06 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support,Security Program Plans & Audits & Protected & Vital Area Access IR 05000458/19890131989-05-15015 May 1989 Advises That Insp Rept 50-458/89-13 Cancelled.No Rept Will Be Issued for Rept Number IR 05000458/19890211989-05-10010 May 1989 Insp Rept 50-458/89-21 on 890424-28.No Violations or Deviations Noted.Major Areas Inspected:Surveillance Test Observation & Followup on Operating Events IR 05000458/19890101989-05-0909 May 1989 Insp Rept 50-458/89-10 on 890327-0406.No Violations or Deviations Noted.Major Areas Inspected:Review of Inservice Insp,Welding & Associated Documents & Procedures.Mod to RHR Sys Also Reviewed IR 05000458/19890141989-04-20020 April 1989 Insp Rept 50-458/89-14 on 890403-07.No Violations or Deviations Noted.Major Areas Inspected:Testing of Pipe Supports & Restraint Sys ML20244B6001989-04-0606 April 1989 Insp Rept 50-458/89-12 on 890327-31.Violation Noted.Major Areas Inspected:Welding Activities.Welding Program Well Defined & Includes Monitoring by Qc.Weakness in Welder Qualification Program Noted IR 05000458/19890071989-04-0505 April 1989 Insp Rept 50-458/89-07 on 890201-0314.No Violations or Deviations Noted.Major Areas Inspected:Plant Events, Emergency Preparedness Exercise,Operational Safety Verification & Surveillance Test Observation IR 05000458/19890091989-03-30030 March 1989 Insp Rept 50-458/89-09 on 890301-03.No Violations or Deviations Noted.Major Areas Inspected:Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000458/19890081989-03-10010 March 1989 Insp Rept 50-458/89-08 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Calibr Program, Emergency Diesel Fuel Oil Program Into QA Program & Receipt, Storage & Handling of Diesel Generator Fuel Oil IR 05000458/19890061989-03-0808 March 1989 Insp Rept 50-458/89-06 on 890206-10.No Violations or Deviations Noted.Major Areas Inspected:Inservice Testing Program for Pumps & Valves IR 05000458/19890051989-02-24024 February 1989 Insp Rept 50-458/89-05 on 890101-31.No Violations Noted. Major Areas Inspected:Operational Safety Verification, Radiological Protection,Security,Surveillance Test Observation & Maint Observation IR 05000458/19890031989-02-23023 February 1989 Informs That Insp 50-458/89-03 Cancelled.No Insp Rept Will Be Issued for Subj Rept Number IR 05000458/19880291989-01-31031 January 1989 Partially Withheld Insp Rept 50-458/88-29 on 881212-16 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program Included Mgt Support, Security Program Plans,Audits & Records & Repts IR 05000458/19880191988-10-14014 October 1988 Insp Rept 50-458/88-19 on 880801-0917.Violation Noted.Major Areas Inspected:Surveillance & Maint Observation,Safety Sys Walkdown,Operational Safety Verification,Radiological Protection Observation & Security ML20155G8291988-10-0303 October 1988 Insp Rept 50-458/88-21 on 880912-15.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program ML20155E2471988-09-27027 September 1988 Insp Rept 50-458/88-22 on 880829-0915.Violations Noted.Major Areas Inspected:Fuel Bldg Ventilation Charcoal Filtration Sys IR 05000458/19880201988-09-14014 September 1988 Insp Rept 50-458/88-20 on 880822-25.No Violations Noted. Details Withheld (Ref 10CFR73.21) ML20153E4051988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records IR 05000458/19880181988-08-30030 August 1988 Insp Rept 50-458/88-18 on 880808-12.Violations Noted.Major Areas Inspected:Surveillance Procedures & Records ML20151Z8021988-08-22022 August 1988 Partially Withheld Insp Rept 50-458/88-14 on 880613-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Lers, Allegations,Security Procedures,Mgt Effectivenss,Security Program Audits & Records & Repts IR 05000458/19880171988-08-12012 August 1988 Insp Rept 50-458/88-17 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Licensee Action on NRC Bulletin 88-005,surveillance Test & Maint Observation, Operational Safety Verification & Security IR 05000458/19880161988-07-27027 July 1988 Insp Rept 50-458/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluent Release Program & Allegations Re Training & Qualifications of Supervisory Personnel ML20151G0971988-07-15015 July 1988 Insp Rept 50-458/88-13 on 880501-0630.Violation Noted.Major Areas Inspected:Previous Insp Findings,Nrc Bulletins 88-001 & 88-007,NRC Info Notices,Surveillance Test Observation, Maint Observation & Safety Sys Walkdown 1990-09-27
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000458/19990121999-10-19019 October 1999 Insp Rept 50-458/99-12 on 990822-1002.Non-cited Violations Noted.Major Areas Inspected:Operations,Engineering, Maintenance & Plant Support ML20212L9771999-10-0505 October 1999 Notice of Violation from Insp on 990710.Violation Noted:From 990224-0325,River Bend Station Operated in Mode I Without Three Operable EDGs IR 05000458/19990101999-09-15015 September 1999 Insp Rept 50-458/99-10 on 990830-0903.No Violations Noted. Major Areas Inspected:Licensed Operators Requalification Program IR 05000458/19990081999-09-0808 September 1999 Insp Rept 50-458/99-08 on 990711-0821.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000458/19990111999-08-17017 August 1999 Insp Rept 50-458/99-11 on 990719-23.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000458/19990091999-08-16016 August 1999 Replacement Pages 9-18 for Insp Rept 50-458/99-09 Issued on 990730 ML20210N1901999-08-0404 August 1999 Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee,Operations,Maint,Engineering & Plant Support ML20210K1471999-07-30030 July 1999 Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Noncited Violations Identified.Major Areas Inspected:Review of Licensee Actions Re Testing & Cleaning of Auxiliary Bldg Unit Coolers ML20196L0551999-07-0606 July 1999 Revised Pages 4 of Report Details Section & 2 of Rept Attachment for Insp Rept 50-458/99-03.Corrections Made to Tracking Numbers Assigned to Seven Noncited Violations & to SRO Location During Refueling Activities IR 05000458/19990041999-06-30030 June 1999 Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations Occurred & Being Treated as Noncited Violations.Major Areas Inspected:Portions of Radiation Protection Program,Including Exposure Controls & Radiation Technical & Worker Practices IR 05000458/19990051999-06-18018 June 1999 Insp Rept 50-458/99-05 on 990418-0529.Nonccited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support IR 05000458/19990031999-05-18018 May 1999 Insp Rept 50-458/99-03 on 990307-0417.Noncited Violations Noted.Major Areas Inspected:Operation,Maintenance, Engineering & Plant Support IR 05000458/19990061999-05-15015 May 1999 Insp Rept 50-458/99-06 on 990419-23.No Violations Noted. Major Areas Inspected:Inservice Exam Program Plan & Schedule,Implementation of Program Plan for Facility & Maint & Engineering Followup Review of Previous Insp Findings ML20205A4601999-03-26026 March 1999 Insp Rept 50-458/98-10 on 990222-26.Violations Noted.Major Areas Inspected:Radiation Work Permit Program Implementation from Oct 1997 to Feb 1999 & Problem Identification & Resolution Program as Applied to Program Deficiencies IR 05000458/19990021999-03-26026 March 1999 Insp Rept 50-458/99-02 on 990124-0306.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20205A4131999-03-23023 March 1999 NRC Operator Licensing Exam Rept 50-458/99-301 (Including Completed & Graded Tests) for Tests Administered on 990222- 0303.All 14 Applicants Passed Exams ML20203A5351999-01-27027 January 1999 EN-99-005:on 990201,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Two Severity Level III Violations Involving Design Deficiency,Caused Uncertainty as to Ability of Div I & II IR 05000458/19990011999-01-25025 January 1999 Insp Rept 50-458/99-01 on 990104-08.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program Including Alarm Stations,Communications,Access Control of Personnel,Packages,Vehicles & Assessment Aids IR 05000458/19980201999-01-0707 January 1999 Insp Rept 50-458/98-20 on 981101-1212.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20199E2111999-01-0707 January 1999 Notice of Violation from Insp on 981101-1212.Violation Noted:On 971022,radiation Protection Technicians Released One Container with Two Items Contaminated Above Limits Specified in Procedure RSP-0213 ML20199A2161999-01-0505 January 1999 Notice of Violation from Investigation Conducted on 971231. Violation Noted:On 971015,A Wells,Employee on Entergy Operations,Inc,Submitted to NRC Info Known to Be Inaccurate in Some Respect Matl to NRC ML20198T0691999-01-0505 January 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Info Was Provided to Senior Resident Inspector That Was Not Complete & Accurate in All Matl Respects Re 971010 of RWP 97-0002 ML20203A6601999-01-0505 January 1999 EN-99-001:on 990105,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Violation Involving Superintendent of Radiation Control at Licensee River Bend Station Facility ML20198N9311998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress IR 05000458/19980161998-12-29029 December 1998 Insp Rept 50-458/98-16 on 980730-0807.Violations Noted. Major Areas Inspected:Engineering & Fire Protection.Also Reviewed,Status of Various Programs Which Were Planned or in Progress ML20198N9151998-12-29029 December 1998 Notice of Violation from Insp on 980720-0807.Violation Noted:On 980724,licensee Made Change to Facility as Described in Safety Analysis Rept,Which Created Unreviewed Safety Question,Without Prior Commission Approval IR 05000458/19980991998-12-22022 December 1998 SALP Rept 50-458/98-99 Canceled.Process Suspended for Two Yrs.No Insp Rept Will Be Issued for Number IR 05000458/19980181998-11-30030 November 1998 Insp Rept 50-458/98-18 on 980920-1031.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20196G5161998-11-25025 November 1998 Insp Rept 50-458/98-10 Has Been Canceled.No Insp Rept Will Be Issued IR 05000458/19980191998-11-20020 November 1998 Insp Rept 50-458/98-19 on 981019-23.No Violations Noted. Major Areas Inspected:Operations IR 05000458/19980131998-10-27027 October 1998 Insp Rept 50-458/98-13 on 980608-12,22-26 & 0824-28.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maint & Engineering IR 05000458/19980141998-10-21021 October 1998 Insp Rept 50-458/98-14 on 980928-1002.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000458/19980171998-10-0505 October 1998 Insp Rept 50-458/98-17 on 980809-0919.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980151998-08-28028 August 1998 Insp Rept 50-458/98-15 on 980628-0808.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20154L7021998-08-17017 August 1998 Corrected Notice of Violation from Insp Completed on 980218. Corrected NOV Sent to Make Consistent with Ltr Sent on 980722 & to Make Clear That No Response Required ML20236V2081998-07-29029 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980601,while Accomplishing Clearance Order 98-0583, Operator Did Not Follow Sequence Shown on Clearance Order While Positioning Components IR 05000458/19980121998-07-29029 July 1998 Insp Rept 50-458/98-12 on 980517-0627.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20154M5531998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980323. Violation Noted:On 970908,WJ Ginn,Employee of Contractor to Entergy Operations,Inc,Deliberately Submitted Info to Licensee That Was Incomplete & Inaccurate ML20154L7351998-07-22022 July 1998 Notice of Violation from Investigation Completed on 980218. Violation Noted:On 970711,DL Brown Employee of Contractor to Util Deliberatly Submitted Info to Licensee That Brown Knew Incomplete & Inaccurate on Security Questionnaire IR 05000458/19980071998-06-0808 June 1998 Insp Rept 50-458/98-07 on 980518-21.No Violations Noted. Major Areas Inspected:Implementation of Radiological Environ Monitoring & Meteorological Monitoring Programs IR 05000458/19980081998-06-0505 June 1998 Insp Rept 50-458/98-08 on 980405-0516.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000458/19980111998-06-0404 June 1998 Insp Rept 50-458/98-11 on 980518-21.No Violations Noted. Major Areas Inspected:Maint IR 05000458/19980061998-05-19019 May 1998 Insp Rept 50-458/98-06 on 980427-0501.No Violations Noted. Major Areas Inspected:Implementation of Liquid & Gaseous Radioactive Effluent Waste Mgt Program IR 05000458/19980091998-04-30030 April 1998 Informs That Insp Rept 50-458/98-09 Has Been Canceled ML20217A4461998-04-17017 April 1998 Notice of Violation from Insp on 980222-0404.Violation Noted:Established Measures Did Not Assure That Deviation from Environ Design Criteria Was Controlled ML20217A4801998-04-17017 April 1998 Insp Rept 50-458/98-05 on 980222-0404.Violations Noted. Major Areas Inspected:Operations,Main,Engineering & Plant Support PNO-IV-98-016, on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing1998-04-14014 April 1998 PNO-IV-98-016:on 980413,operators at River Bend Station Initiated Normal Reactor Shutdown.Plant Shutdown Deemed Necessary After Operators Identified Main Generator Hydrogen Seal Oil Leak at Main Generator Casing ML20217B4701998-03-24024 March 1998 Notice of Violation from Insp on 980223-26.Violation Noted: Licensee Not Maintained Records of Reviews of Radiation Protection Program Content & Implementation ML20217B4951998-03-24024 March 1998 Insp Rept 50-458/98-03 on 980223-26.Violations Noted.Major Areas Inspected:Review of Radiation Protection Program Activities IR 05000458/19972011998-03-20020 March 1998 Fire Protection Insp Rept 50-458/97-201 on 970615-20, 0629-0703,0819,980120 & 0305.No Violations Noted.Major Areas Inspected:Comprehensive Evaluation of Fire Protection Program & Post Fire Safe Shutdown Capability 1999-09-08
[Table view] |
See also: IR 05000458/1985077
Text
,-
4
APPENDIX B
U. S. NUCLEAR REGULATORY C0!DtISSION
REGION IV
NRC Inspection Report: 50-458/85-77 License: NPF-47
Docket: 50-458
Licensee: Gulf States Utilities Company (GSU)
P. O. Box 2951
Beaumont, Texas 77704
Facility Name: River Bend Station (RBS)
Inspection At: River Bend Station, St. Francisville, Louisiana
Inspection Conducted: October 31 through November 30, 1985..
Inspectors: l ,
( '
A I2'/2- W
D. D.VChamberlain, Senior Resident Inspector Date
(pars. 1, 2, 3, 4, 5, 6, 7, 10, and 11)
%&& w
W. B. Jones,-Residdnt Inspector
Q- 12'W
Date
(pars. 3,.4, 7, 8, 9, 10, and 11)
,
DA l N
. ( Mu(liki , Reactor Inspector" ' Date
(par. 3)
,
/
_
/d N
R. Farfell, enior Resident InTp6ctor Date
( ars. Q_and 10)
8601310093 860127
PDR ADOCK 05000458
G PDR
- . _ - .- - . . _ . ._ __ _.
-
I
i
2
k Ibh4
W. R. Bennett, Project Engineer Date
(pars. 2 and 10)
Approved: 62 //4 dM
, ~J/. P Jauff on, Chief,' Project Section A, Date
Me ob Projects Branch
Inspection Summary
Inspection Conducted October 31 through November 30, 1985 (Report 50-458/85-77)
Areas Inspected: Routine, unannounced inspection of licensee action on previous
ir.spection findings, status of facility operating license conditions, site tours,
control and use of field change notices, licensee quality concern program
review, initial criticality witness, pipe support and restraint systems testing,
human engineering discrepancies (HEDs) review, startup test procedures review
and startup test witness. The inspection involved 483 inspector-hours onsite by
five NRC inspectors.
Results: Within the areas inspected, one violation was issued in the area of
control and use of field change notices (failure to provide clear and concise
,'
design instructions on an approved change to a safety-related design
modification, paragraph 5),
1
a
I
)
L
. , - - . _ . --. ~,,m- _ , _ . , . _ . . , , ,, r----- ._-v-,-- .- e- w -- . - , , -#m--- --,__.r- ,w - - - - - - - - - - - -
3
DETAILS
1. Persons Contacted
Principal Licensee Employees
- W. J. Cahill, Jr., Senior Vice President, River Bend Nuclear Group
- E. M. Cargill, Superintendent, Radiological Programs
- T. C. Crouse, Manager, Quality Assurance (QA)
- J. C. Deddens, Vice President River Bend Nuclear Group
- D. R. Derbonne, Supervisor, Startup and Test
S. Finnegan, Control Operating Foreman
- P. E. Freehill, Superintendent, Startup and Test
- A. D. Fredieu, Assistant Operations Supervisor
-
D. R. Gipson, Assistant Plant Manager, Operations
- P. D. Graham, Assistant Plant Manager, Services
- E. R. Grant, Supervisor, Nuclear Licensing
D. Hartz, Shift Supervisor, Operations
- R. W. Heinick, Director, Projects
B. D. Hey, Licensing Engineer
K. C. Hodges, Supervisor, Quality Systems
R. Jacksor , Shift Supervisor, Operations
D. Jernigan, Engineer, Startup and Test
- G. R. Kimmall, Supervisor, Operations QA
R. King, Engineer, Licensing
A. D. Kowalczuk, Assistant Plant Manager, Maintenance
D. J. Krueger, Supervisor, Engineering Administration
T. Lacy, Shift Supervisor, Operations
- H. M. McClellan, Senior Compliance Analyst
- I. M. Malik, Supervisor Quality Engineering
A. Middlebrooks, Shift Supervisor, Operations
E. R. Oswood, Engineer, QA
G. A. Patrissi, Engineer, QA
- T. L. Plunkett, Plant Manager
S. R. Radebaugh, Assistant Superintendent, Startup and Test
- W. J. Reed, Director Nuclear Licensing
- D. Reynerson, Director, Nuclear Plant Engineering
- J. E. Spivey, Engineer, QA
- R. B. Stafford, Director, Quality Services
- P. F. Tomlinson, Director, Operation QA
C. Warren, Shift Supervisor, Operations
Stone and Webster
F. W. Finger, III, Project Manager, PTO
- B. R. Hall, Assistant Superintendent, Field Quality Control
R. L. Spence, Superintendent, Field Quality Control
4 a., .\ ~ 4 & -+-Au -2--- u - w , 4 .
.
4
The NRC inspectors also interviewed additional licensee, Stone and Webster
(S&W), and other contractor personnel during the inspection period.
- Denotes those persons that attended the exit interview conducted on
December 12, 1985. The NRC resident inspector (RI), W. B. Jones, also
attended the exit interview.
2. Licensee Action on Previous Inspection Findings
.
a. (Closed) Open Item (8425-02): Wetting of neutron monitoring system
cables below the reactor pressure vessel.
The NRC inspector reviewed the licensee's records of megger testing
and continuity testing of neutron monitoring system cables located
below the reactor pressure vessel. All of the testing was witnessed
by licensee quality assurance (QA) engineers.
-
This item is closed.
'b. (Closed) Open Item (8558-04): Procedures identified for performance
of surveillance testing of Emergency Core Cooling Systems (ECCS) were
not approved for use.
The NRC inspector reviewed the licensee's surveillance test
procedures (STPs) for ECCS systems and determined that they were
adequate to meet Technical Specification (TS) requirements.
This item is' closed.
i (Closed) Open Item (8558-05): Procedures that were similarly
^
.c.
performed contained inconsistencies and errors existed in procedures
-
,
that had not been walked down.
The NRC inspector reviewed the STPs for ECCS systems and determined
that they were consistent and adequate to meet requirements.
This item is closed.
d. (Closed) Open Item (8558-06): Procedures contained "LATERS" and did
not meet requirements of TS 4.6.1.2.a.
The NRC inspector reviewed STP 000-0702 and determined that it meets
the requirements of TS 4.6.1.2.a.
This item is closed.
.
i
_, ._ _ _ __ __ ___ -
..- .- ,_ , _ _ _ _ _ _ _ _, _ .
. .
I
<
,
.
1
5
e. (Closed) Open Item'(8558-08): Procedures identified to meet the
requirements of TS 4.6.4.2 were not approved for use.
The NRC inspector reviewed the STPs for TS 4.6.4.2 and determined
that they are adequate to meet TS requirements.
" This item is closed.
f. (Closed) Open Item (8558-26): Changes to TS have not been
implemented into STPs.
The NRC inspector reviewed the licensee's reference tracking system
~for implementing changes to TS into procedures and determined that
the program is adequate to ensure that procedures meet TS
requirements.
This item is closed. ,
g. =(Closed) Open Item (8558-28): Procedure STP 055-0101 (dated
July 22, 1985) is not responsive to TS 4.9.12.4 in that it'does not
verify access. interlocks and palm switches in certain locations are
operable as required.
The NRC inspector reviewed STP 055-0101 (dated September 23, 1985)-
and determined that it is adequate'to meet.the. requirements of
TS 4.9.12.4.
.
This item is closed.
h. (Closed) Open Item (8527-04) (License Condition 3.a. Part 4): This
item involved the completion of procedure A0P-0031, " Shutdown From
Outside the Main Control Room," and the training of required
personnel in the procedure.
The NRC inspector reviewed a copy of approved procedure AOP-0031 and
performed a walkdown of this procedure. The procedure appeared
adequate to provide the necessary instructions to personnel to
remotely shutdown the plant due to a fire in the main control room.
All required actions were verified as being able to be performed in-a
timely manner. In addition, the required training of operators has
been performed.
lhis open item and part 4 of license condition 3.a. are closed,
i. (Closed) Open Item (8527-06) (License Condition 3.a. Part 3): This
item involved the completion of all modifications, including diesel
generator electrical circuits, to isolate the control room circuitry
from the safe shutdown panel.
T:
> .
.
<
,
d
6
,
.
~
The NRC inspector reviewed the results'of the following
preoperational tests: (1) Special Situation Test Procedure 1-SST-50,
'
" Remote Shutdown," Revision 0 and (2) Special Situation Test
'
Procedure 1-SST-59, " Division I Remote Shutdown Tests," Revision 0.
These tests were found to be complete and acceptable.
This open item and part 3 of license condition 3.a. are closed.
j. (Closed) Open Item (8527-08) (License Condition 3.a. Part 4): This
. Item concerned the possible need for radio communications between
operators during the implementation of A0P-0031.
A review of the procedure and a walkdown by the NRC inspector.
revealed no areas where remote communications were required.
This open item and all parts of license condition 3.a. are closed.
3. Status of Facility Operating License Conditions
Facility Operating License NPF-40 for River Bend Station was issued on
August 29, 1985, and pending Commission approval, operation is restricted
to power levels not to exceed 5% of rated power. Attachment 1 to this
license contains items to be completed to the satisfaction of NRC Region IV
prior to achieving certain operational conditions. The following status
is provided for the Attachment I license cond; Lions:
a. (Closed) License Condition 3.a.:
Complete the fire protection and prevention items prior to exceeding
5% rated power.
Parts 1 and 2 of this license condition were closed in NRC Inspection
Report 50-458/85-69. Parts 3 and 4 of this license condition were
closed in paragraph 2 of this report along with open items 8527-04,
8527-06,and 8527-08.
All four parts of license condition 3.a. are closed.
b. (Closed) License Condition 3.b.:
Complete testing of liquid, gaseous, and solid radwaste systems and
place these systems in service prior to exceeding 5% rated power.
The liquid radwaste system was addressed in paragraph 3 of NRC
Inspection Report 50-458/85-70. The gaseous radwaste system was
l
addressed in paragraph 3 of NRC Inspection Report 50-458/85-69.
.
._ _ . _ . _ _ ._ . .
'
4
7
-
The solid radwaste system was addressed in paragraph 2 of NRC
Inspection Report 50-458/85-53. All of these systems have been tested
and are operational.
This license condition is closed.
c. (Closed) License Condition 3.d.:
Complete installation and testing of post-accident sampling system
(PASS) and place system in service prior to exceeding 5% rated power.
On November'10, 1985, the RI witnessed a demonstration of the
licensee's ability to provide representative liquid samples from
within the primary containment using the manual grab post-accident
sampling system. The demonstration consisted of taking two liquid
samples from the B jet pump header using the liquid sample station
located in the auxiliary building. The licensee was able to draw two
samples and analyze the first sample for pH, dissolved oxygen,
hydrogen, boron, conductivity and radionuclides within the required 3
hours from the time the decision was made to take the samples. The
RI verified that approved procedures.were used for the PASS demonstra-
tion and sample analysis.' In addition, the RI verified that work on
PASS has been completed and the system turned over to operations.
This license condition is closed.
d. ,(Closed) License Condition 3.e.:
Load reduction modifications to reduce maximum emergency service load
to 2884 kw for the Division I diesel generator and to 2780 kw for the
Division II diesel generator prior to exceeding 5% of rated power.
The licensee initiated Modification Request (MR) 850291 to reduce the
loads on the Division I and II emergency diesel generators. As a
result of this request, S&W engineering company initiated Engineering
and Design Coordination Requests (E&DCR) S-10017 and S-10018. E&DCR
S-10017 adjusted the fan blade settings on Division I and II diesel
generator exhaust fans 1HVP*FN2A and B, respectively. E&DCR S-10018
reduced the heating capacity of the standby cooling tower remote air
intake room duct heaters 1HVY*CH6A and B from 30 kw to 12 kw egh.
These modifications were performed under Maintenance Work Requests
(MWR) 003497, 008678, and 14680. MWRs 003497 and 008678 adjusted the
fan blade pitches from 37 to 20 for Division I and II diesel
generators respectively, while MWR 14680 disconnected 9 of the 15
heater elements from HVY*CH6A and 68. These modifications resulted
in final diesel generator loading of 2882.84 kw for Division I and
2766.01 kw for Division II. The licensee has also submitted a Final
Safety Analysis Report (FSAR) change notice to the NRC reflecting the
above modifications.
This license condition is clor,ed.
I
L
.
"
~
.
8
l
'
4. Site Tours
,
The SRI and RI toured areas of the site during the inspection period to
gain knowledge of the plant and to observe general job practices.
1
l No violations or deviations were identified in this area of inspection.
5. Control and Use of Field Change Notices (FCNS)
During a routine followup from a previous NRC inspection, the SRI reviewed
the completed Field Change Notice (FCN) 19 to MR 85-0397. FCN-19 had
.
become a 96-page document and the SRI found that the design instructions
l
'
were often misleading and difficult to follow. For example, page 36 of
FCN-19 added terminal board 43B contacts (contacts 7/8 and 3/4) on an
electrical schematic for remote shutdown operation of the diesel generator
- output breaker, and page 57 of FCN-19 removed the same contacts. Also,
l several pages of FCN-19 were found to be illegible due to poor reproduction
quality. The failure to provide clear and concise design instructions on
. an approved change to a safety-related design modification was identified
by the SRI as an apparent violation (8577-01). The SRI immediately
informed the licensee of this finding and the licensee took immediate
action to review other safety-related design modifications for similar
problems. Although similar documentation problems were found, hardware
inspections revealed no problems with the installed hardware.
6. Licensee Quality Concern Program Review
The licensee's quality concern prouram was described in NRC Inspection
Report 50-458/84-25. The SRI continued to review licensee actions on
'
individual cases and completed the review of the current status of all
open quality concerns,
t
- No violations or deviations were identified in this area of inspection.
7. Initial Criticality Witness
i
l This area of inspection was conducted to review licensee preparations for
initial critical and to witness initial criticality in order to ascertain l
l confomance to license and procedural requirements and to observe
l operating staff performance. The licensee completed preparations for
'
initial criticality on Octooer 30, 1985, and began pulling the first
control rod at about 9:30 p.m. The reactor was declared critical at
12:38 a.m. on October 31, 1985, on step 27 of the rod withdrawal sequence
with 2032 notches withdrawn. Nuclear instrumentation was monitored closely
during approach to criticality and appeared to respond as expected.
Also, during this inspection period, the RI completed the review of the
results of 13 STPs performed prior to achieving initial criticality. The
RI verified that the STP had been properly signed by the personnel
performing the test, that the data was collected and recorded as required,
.
O
that all deficiencies had been addressed and corrective action completed,
and that the surveillance tests had been performed within the required
frequency.
The. SRI concluded that the licensee preparations for initial criticality
were cautious and the operating staff performance was controlled and
cautious. License and procedural requirements appeared to have been
implemented for a safe and cautious initial criticality at River Bend.
No violations or deviations were identified in this area of inspection.
8. Pipe Support and Restraint S_vstems Testing
During the initial nuclear heat up cycle, the R1 visually examined system
pipe supports to ascertain whether system thermal expansion vrould result
in any apparent failures to the dynamic pipe supports, fixed pipe supports,
or their associated component support structures. These visual examirationr.
were performed at ambient plant temperature and again at a plant
temperature of 350 F. Pipe supports and structures were examined to
verify where applicable, that; (a) deterioration, corrosion, physical
damage or deformation were not noticeable; (b) bolts, nuts, washers, were
tight and secure; (c) the equipment was not in a " lock up" or " frozen"
position; and (d) pipes, supports or other associated equipment or
compcnents were not in contact or cause rubbing due to thermal expansion.
The following pipe supports and associated support structures were examined:
Type System Identification No.
Spring Residual Heat Removal RHS-PSSH-30775
Spring Recirculation Pump Housing H-306A
Spring det Pump Header H354A
Spring Low Pressure Core Spray CSL-PSSH-3001
Spring Low Pressure Coolant Injection RHS-PSSH-3089
Snubber Feed Water FWS-PSSP-3021
Snubber Residual Heat Removal RHS-PSSP-3078
Snubber det Pump Header S-354A
Snubber det Pump Header S-3598
Snubber det Pump Header S-304B
Snubber Residual Heat Removal Rl15-PSSP-3011
Snubber Recirculation Pump Motor S-371B
Snubber Recirculation Pump Housing S-306A
Snubber Feedwater FWS-PSSP-3015
Hanger Feedwater FWPRR-804
11 anger Feedwater FWS-PRR-823
Hanger Feedwater FWS-PRR-808
Hanger Residual Heat Removal RHS-PRR-831
Bracket Main Steam MSS-814
Bracket Main Steam MSS-822
Bracket Main Steam MSS-823
. _ _ . _ . . _ - _ . _ _ . . . _ - _ .._-.__.__ ___ _ _ _
.
-
4
>
10
,
i ..
! The RI did not identify any conditions which would appear to adversely
affect the operation of the examined system pipe supports. The system
expansion data for Startup Test Procedure (ST) 1-ST-17, " System
Expansion," will be reviewed to ensure that expansion problems do not -
exist at operating temperature and pressure for the above pipe supports i
i and associated structures. The results of this review will be documented
in a subsequent inspection report.
No violations or deviations were identified in this inspection area.
9. Human Engineering Discapancies (HEDs) Review
During this inspection period the NRC RI reviewed Human Engineering ?
Discrepancy (HED) records to verify that identified improvements in the
control room / operator interface, for selected HEDs, had been completed.
- ,. The HEDs were documented in the River Bend Station Detailed Control Room
l
Design Review Summary Report, issued in October 1984.
The following HEDs were verified complete:
.
847 Label "SRV Low-Low Set / Reset" for A and B train.
4
833 Label recorders 1CliS-PR2A and 2B to indicate containment
pressure.
i
8 Mimic of RHR system. l
! 25 Establish lines of demarcation for RHR Loop B and C.
!
. 830 Label switch for manual initiation of containment as
l " Isolation."
248 Label as ADS safety relief valve.
,
747 Add escutcheons for manual steam isolation manual initiation
! push bottoms.
] 431 Modify total feedwater flow recorder to read in % flow.
l 328 Annunciator windows consistent in type and style.
l 422 Identify operational limits or warnings on meters.
I
q 575 Accurately identify valves (up to root valves) by tagging.
307 Mcdify "HPCS NOT READY FOR AUTO START" annunciator circuit to
actuate for any of the seven conditions which will render HPCS
incapable of auto start.
o
!
!
. - - - - . - _ _ _ . _ _ . - - - - _ _ . -
'
.
11
No violations or deviations were identified in this area of inspection.
10. Startup Test Procedures Review
The purpose of this area of the inspection was to review selected ST
procedures for compliance with regulatory requirements, FSAR commitments
and Technical Specifications. The NRC inspectors reviewed ST Procedure
1-ST-19. " Core Performance," Revision 0, ST Procedure 1-ST-26, " Safety
Relief Valves," Revision 0, and a draft major change request to 1-ST-26,
and ST Procedure 1-ST-28, " Shutdown From Outside the Control Room,"
Revision 0.
No violations or deviations were identified in this area of inspection.
11. Startup Test Witness
During this inspection period, the NRC inspectors witnessed startup testing
and operational activities conducted under the low power testing program.
Testing and operational activities witnessed included a reactor startup on
November 17,~1985, a reactor core isolation cooling (RCIC) turbine run on
November 17, 1985, and initial turbine roll on November 26, 1985.
River Bend received a full power operating license (NPF-47) on November
20, 1985, and reactor power was raised above 5% on November 25, 1985.
No violations or deviations were identified in this area of inspection.
12. Apparent Power Level Exceeding Licensed Level of 5%
On November 18, 1983, the apparent power level exceeded the licensed
level of 5%. The SRI, assisted by a Region IV supervisor, conducted an
inspection to determine the facts of this occurrence,
a. Background
On November 15, 1985, the NRC commissioners voted to allow the NRC
staff to issue a full power license to the River Bend facility. The
full power license was subsequently issued on November 20, 1985.
b. _0_ccurrence
During the night shift of November 17-18, 1985, the on-duty shift
supervisor directed power be raised to approximately 6.5% to
facilitate turbine steam chest warm up. Although other on-watch
personnel questioned this order, it was carried out. The shift
supervisor on watch stated to NRC personnel that he understood th6t
the Commission vote authorized operation above 5% power. The
indicated power of approximately 6.5% power was maintained for about
. . _ - - - . -. -- . .. -. . _ . -
_
c.
12
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. The event was tcrminated when the oncoming shift supervisor
questioned why power had been raised above 5%.
c. Determination of Actual Power
The NRC inspectors reviewed the licensee's two methods of
quantifying actual power during the event. The first method by a
secondary calorimetric calculation. This calculation indicated that
actual power was about 4.5%; however, the accuracy of this
calculation was not considered good because feed flow was very low.
The measurement of feed flow was not considered to be accurate at
the very low end of the indicating range of the measuring device.
The second calculation was based on the valve position of the
turbine by-pass valves. There are two turbine by-pass valves at
River Bend. Each of these valves is rated at 5% of total power.
One of the valves was shut and the other valve was 50% open. Data
from General Electric taken on identical valves at other plants
indicated that these bypass have linear response or flow
characteristics (e.g., a valve that is 50% open would pass one-half
of its total capacity). The licensee' calculated that the one bypass
valve which was 50% open accounted for 2.5% of reactor power. !
Allowing for other heat losses such as steam traps and the reactor
water clean up system,' the licensee calculated that actual power was
less than 3.5%
d. Inspection Findings
'
The NRC inspectors noted that nuclear instruments could not be set
accurately until power was at a higher level so that an accurate
heat balance'could be made. Nuclear instrument gains were set high,
which is the conservative approach. Indicated power was thus
greater than actual power, and actual power had probably not
exceeded the licensed limit. The NRC inspectors concluded that
there had been a serious breakdown in training and communications.
As the result of interviews with operators and supervisors, it
appeared that this communication breakdown was limited to the one
shift supervisor who had directed the power increase. The NRC
inspectors noted that the licensee had removed this shift supervisor
from licensed duties for retraining and evaluation. It was also
found that the licensee had taken measures to improve communications.
These included the presence of an operations management individual
at all shift turnover briefings, written instructions to operators on
power limit and the resetting of rod blocks to 5%.
It was concluded that continued close monitoring of shift performance
communications was warranted to assess the effectiveness of the
corrective actions taken.
--
= -
cc ,
- -
. .
t. .c,,
t
i
.. . *- 13
r
l
.
.
13. Exit Interview. ,
,
j An exit interview was conducted on December.12,.l'985, with licensee
'
representatives (identified.in paragraph 1). During this interview, the
. SRI-reviewed the scope and findings of.the' inspection.
,
f
i
L
i
!
,
1
1
l'
'
t
.
I
I
\
+
L_