ML20155J125

From kanterella
Revision as of 05:13, 17 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Repts 50-324/88-35 & 50-325/88-35 on 880912-16.No Violations or Deviations Noted
ML20155J125
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 10/12/1988
From: Cline W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20155J129 List:
References
NUDOCS 8810250249
Download: ML20155J125 (2)


See also: IR 05000324/1988035

Text

-

,

.

'

-

,

SAFEGUARDS INFORMATION

OCT 121988

Docket Nos. 50-325, 50-324

License Nos. OPR-71, DPR-62

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice President 3

Power Supply and Engineering

,

and Construction 08Q7NB

P. O. Box 1551

Raleigh, NC 27602

!

Gentlemen: ,

'

SUBJECT: NRC INSPECTION REPORT NOS. 50-325/88-35 AND 50-324/88-35

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Ms. Orysia M. Masnyk on September 12-16, 1988. The inspection included a

review of activities authorized for your Brunswick facility. At the conclusion

of the inspection, the findings were discussed with those members of your staff

idantified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress. <

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure. Therefore, the enclosure

to this letter with the exception of the report cover page, which presents a

nonexempt summary, will ng be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, .

.

William E. Cline, Chief

Nuclear Materials Safety and

Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosure: (See page 2)

BBiop{O249800Cg

2 rC**

pDR pOSOOo324

ar***

Docum'at

ah (

g,,,,, ,o,,hatmE*d

  • , h,, #d**w ,om

a h*'re

emmi, w. $wn.$ s. xcmg,3.

SAFEGUARDS INFORM ATION

!

.. . . .- . .- .

,

'

<

,

-

OCT 121 pas

Carblina' Power and Light Company 2

Enclosure:-

NRC Inspection Report

(Exempt from Disclosure)-

cc'w/ encl:-

P. W. Howe, Vice President

Brunswick Nuclear Project

J. L.' Harness, Plant General Manager .

cc w/Insoection Summary:

State of North Carolina

bec w/ encl:

NRR/DRIS/SB

B. Murray, RIV

bec w/ Inspection Summary:

Document. Control Desk (RIOS.IE04), 016

.

RII F RI! RII j

OMas k:tj B J1 $MFre ickson % e %

l

p/h /88 09////88 g/gp/88 jh'k /88 ~ ~g.~ 2 %

,Q p ,

SAFEGUARDS INF0PM ^ TION

,