Category:CORRESPONDENCE-LETTERS
MONTHYEARML20212J7481999-09-29029 September 1999 Forwards Insp Rept 50-133/99-02 on 990915.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program HBL-99-011, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 31999-08-27027 August 1999 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 3 HBL-99-014, Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates,1999-07-23023 July 1999 Forwards Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates, ML20209D9981999-07-0808 July 1999 Ack Receipt of Which Transmitted Rev 9 to Physical Security Plan for Humboldt Bay Power Plant,Under Provisions of 10CFR50.54(p).Changes Do Not Decrease Plan Effectiveness,So NRC Approval Is Not Required HBL-99-012, Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal1999-07-0707 July 1999 Forwards Rept of Rev 29 to Hbpp Emergency Plan,Effective 990610.Changes in Rev Do Not Decrease Effectiveness of Plan, Per 10CFR50.54(q).Plan Has Been Distributed to Region IV & Is Not Included as Part of Submittal ML18107A7011999-06-25025 June 1999 Requests Rev of NRC Records to Reflect Change of PG&E Address ML20207E7301999-05-27027 May 1999 Discusses Reorganization of Nrr,Effective 990328 & Forwards Organizational Chart HBL-99-008, Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl1999-04-30030 April 1999 Forwards Annual Rept of Occupational Radiation Exposure for 1998. Radiation Exposure Rept Provided on Encl Diskette in Electronic Format of Reg Guide 8.7.Without Encl ML20205L9951999-04-0808 April 1999 Forwards Insp Rept 50-133/99-01 on 990222-25 & 0308.No Violations Identified HBL-99-006, Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual1999-03-31031 March 1999 Forwards Annual Radioactive Effluent Release Rept, Covering Period Jan-Dec 1998.Encl 2 Contains Revs 1 & 2 to Safstor ODCM as Required by Specification Section 4.2 of Safstor Offsite Dose Calculation Manual DCL-99-038, Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f)1999-03-31031 March 1999 Forwards Decommissioning Funding Repts for Diablo Canyon Power Plant,Units 1 & 2 & Humboldt Bay Power Plant,Unit 3, Per Requirements of 10CFR50.75(f) HBL-99-003, Forwards Annual Facility Status & Survey Rept, for Jan-Dec 19981999-03-31031 March 1999 Forwards Annual Facility Status & Survey Rept, for Jan-Dec 1998 ML20202A9831999-01-18018 January 1999 Informs That Modesto Irrigation District No Longer Seeking Addl Interconnection with Pacific Gas & Electric Co at Pittsburg,Ca & Matters First Addressed in 980429 Comments in Opposition to Restructuring of Util Have Now Become Moot HBL-98-021, Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal1998-12-18018 December 1998 Forwards Rept Change (Rev 28) to Hbpp Emergency Plan, Effective 981126.Updated Emergency Plan,Not Included as Part of Submittal ML20195H7631998-11-20020 November 1998 Forwards Insp Rept 50-133/98-04 on 980901-03,1012-17 & 20-22.No Violations Noted.Insp Focused on Activities Associated with Removal of 250 Feet Ventilation Stack HBL-98-013, Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE1998-11-10010 November 1998 Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for Jan-Dec 1997. Encl Annual Rept Provides Brief Description of 10CFR50.59 Facility Design Changes, Including Summary of Each SE ML20154G4441998-10-0101 October 1998 Ack Receipt of Which Transmitted Rev 8 to Physical Security Plan for Humboldt Bay Power Plant,Under Provisions 10CFR50.54.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required DCL-98-123, Submits Listed Address Changes for NRC Service Lists for Listed Individuals1998-09-0909 September 1998 Submits Listed Address Changes for NRC Service Lists for Listed Individuals HBL-98-015, Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes1998-08-28028 August 1998 Forwards Rev 2 to DSAR for Humboldt Bay Power Plant,Unit 3, to Comply W/Decommissioning Rule.Dsar Was Formerly Known as Safstor Decommissioning Plan.Encl 1 Identifies & Describes Rept Changes DCL-98-108, Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year..1998-08-0707 August 1998 Submits 90-day Response to NRC GL 98-01, Yr 2000 Readiness of Computer Sys at Nuclear Power Plants. Util Has Pursued & Continuing to Pursue Year 2000 Readiness Program Similar to That Outlined in Nei/Nusmg 97-07, Nuclear Util Year.. HBL-98-009, Submits Info Describing site-specifc Decommissioning Cost Estimates1998-08-0505 August 1998 Submits Info Describing site-specifc Decommissioning Cost Estimates ML20236G0691998-06-19019 June 1998 Forwards Endorsement 123 to Neila Policy NF-228,Endorsement 145 to Neila Policy NF-113,Endorsement 124 to Neila Policy NF-228 & Endorsement 89 to Maelu Policy MF-103 L-98-027, Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d)1998-06-11011 June 1998 Forwards Rev 8 to Physical Security Plan.Encl 1 Identifies & Describes Plan Changes,Which Indicated W/Rev Bars in Left Margin of Physical Security Plan.Rev Withheld,Per 10CFR2.790(d) HBL-98-011, Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept1998-06-0404 June 1998 Forwards Rept of Rev 27 to Hbpp Emergency Plan,Effective 980507,per 10CFR50.4 & 10CFR50.54(q).Updated Plan Has Already Been Distributed to NRC Region IV IAW Hbpp Procedures.W/O Rept ML20247R9091998-05-26026 May 1998 Forwards Copy of Transcript of Public Meeting Held by NRC W/Participation by PG&E on 980429 in Eureka,California Re Decommissioning of Humboldt Bay Power Plant ML20236E7681998-05-22022 May 1998 Forwards Insp Rept 50-133/98-03 on 980427-30.No Violations Noted.Insp Included Plans for Future Decommissioning of Facility,Including Removal of Unit 3 Stack & Eventual Dry Cask Storage of Unit 3 Spent Fuel ML20247L3571998-05-18018 May 1998 Clarifies Remark Re Discharge Through Existing Ventilation Stack to Avoid Confusion.Remark Was in Response to Question Re Purpose of Dismantlement & Replacement of Existing Ventilation Stack ML20247F9241998-05-14014 May 1998 Forwards Insp Rept 50-133/98-02 on 980414-15.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program.Determined That Physical Security Program Was Properly Implemented ML20216B7291998-05-12012 May 1998 Expresses Appreciation for Support Provided for Recent Public Meeting Held at Eureka Inn on Decommissioning of Humboldt Bay Power Plant ML20216B6801998-05-11011 May 1998 Expresses Appreciation for Outstanding Support Staff Provided for Recent Public Meeting Held at Eureka Inn on Decommissioning of Humboldt Bay Power Plant ML20217H1161998-04-21021 April 1998 Forwards Annual Rept of Occupational Radiation Exposure, for Employees & Visitors Monitored at Humboldt Bay Power Plant During CY97.Rept on Diskette.W/O Encl ML20216C8681998-04-0808 April 1998 Forwards Amend 32 to License DPR-7 & Safety Evaluation. Amend Revises TS to Implement GL 89-01 & to Incorporate Requirements of Revised 10CFR20 & App I to 10CFR50 HBL-98-008, Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I1998-03-31031 March 1998 Forwards Annual Radioactive Effluent Release Rept for 970101-1231. Rept Contains Comparison of Max Calculated Dose to Individual Members of Public W/Numerical Guidelines of 10CFR50 App I HBL-98-006, Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program1998-03-31031 March 1998 Forwards Annual Facility Status & Survey Rept for 1997. Section a Addresses Facility Status & Section B Presents Results of Monitoring Performed for Radiological Environ Monitoring Program HBL-98-003, Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped1998-03-13013 March 1998 Forwards Corrected TSs Re LAR 96-02,in Entirety W/ Affected Pages Retyped HBL-98-002, Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp1998-02-27027 February 1998 Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp ML20203K9691998-02-27027 February 1998 Forwards Insp Rept 50-133/98-01 on 980126-29.No Violations Noted.Major Areas Reviewed as Part of Insp Included Compliance W/Selected TS of License,Review of 1997 Annual Exercise & Evaluation of Facility Re Decommissioning Plan HBL-98-001, Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl1998-01-26026 January 1998 Informs That Existing Hbpp PM Program Adequately Meets Requirements of Maint Rule.Summary of Program & Basis for Determining Maint Rule Compliance at Plant,Encl ML20198J4791998-01-0707 January 1998 Informs That LL Wheeler Assumed Project Mgt Responsibilities for Humboldt Bay on 971229.LL Wheeler Can Be Contacted at Listed E-mail Address ML20199B3851997-11-13013 November 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-133/97-02 on 971001 HBL-97-016, Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor1997-10-27027 October 1997 Responds to NRC Re Violations Noted in Insp Rept 50-133/97-02.Corrective Actions:Correctly Reset Process Water Monitor Warning High & Low Alarms & re-educated All Operators on Proper Method to Set Process Water Monitor HBL-97-015, Submits Inventory Changes at Unit 3 from 970401-0930 for Matls Re Enriched U Fuel,Plutonium in Fuel,Fission Counters & Incore Flux Detectors.Encl 2 Provides Data Required by Form DOE/NRC-741.W/o Encl1997-10-0909 October 1997 Submits Inventory Changes at Unit 3 from 970401-0930 for Matls Re Enriched U Fuel,Plutonium in Fuel,Fission Counters & Incore Flux Detectors.Encl 2 Provides Data Required by Form DOE/NRC-741.W/o Encl ML20217D6191997-10-0101 October 1997 Forwards Insp Rept 50-133/97-02 on 970513-0828 & Nov.Nrc Will Use Licensee Response to NOV to Determine Whether Further Enforcement Action Necessary HBL-97-012, Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan1997-08-28028 August 1997 Forwards Rept of Rev 26 to Plant Emergency Plan,Effective 970801.Changes Do Not Decrease Effectiveness of Plan ML20210H4671997-08-0202 August 1997 Requests That NRC Suspend Investigation & Review of Issues Raised by Modesto Irrigation District & Transmission Agency of Northern CA Re Contention That PG&E Had Violated Nuclear License Conditions Known as Stanislaus Commitments ML20149K8321997-07-25025 July 1997 Ack Receipt of Transmitting Rev 7 to Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p). Changes Do Not Decrease Effectiveness of Plan & No NRC Approval Is Required HBL-97-009, Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon1997-06-12012 June 1997 Provides Addl Justification to Support TS Change Request Contained in LAR 96-02 ,re Establishment of Radiological Effluents Control Program & in Response to 970416 Telcon L-97-035, Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d)1997-04-0909 April 1997 Forwards Info Re Changes to Humboldt Bay Power Plant,Unit 3 Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan & Are Submitted Per 10CFR50.54(p). Encls Withheld Per 10CFR2.790(d) L-97-033, Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 19861997-04-0202 April 1997 Confirms Final Disposition of Specific Hazardous Wastes Shipped to IT Corp Panoche & Vine Hill Facilities from Plant in Jul 1986 HBL-97-003, Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp1997-02-20020 February 1997 Documents Utils Understanding of Results in Discussions from Meeting W/Nrc Personnel to Discuss Application of New Decommissioning Rule to Hbpp 1999-09-29
[Table view] Category:NRC TO UTILITY
MONTHYEARML20059C0381990-08-22022 August 1990 Advises That 880826 & 900717 Rev 2 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20055H4661990-07-13013 July 1990 Forwards Insp Rept 50-133/90-02 on 900618-21.No Violations Noted IR 05000133/19890021989-09-28028 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations in Insp Rept 50-133/89-02 IR 05000133/19890031989-08-28028 August 1989 Forwards Safeguards Insp Rept 50-133/89-03 on 890814-24.No Violations Noted.Rept Withheld (Ref 10CFR73.21 & 2.790(d)) ML20246M1151989-08-22022 August 1989 Forwards Exemption from Property Damage Insurance Requirement,Per 890609 Request ML20246D2811989-08-11011 August 1989 Forwards Insp Rept 50-133/89-02 on 890717-20 & Notice of Violation ML20206K6001988-11-18018 November 1988 Forwards Temporary Exemption from Schedular Requirements of Property Insurance Rule 10CFR50.54(w)(5)(i) Re Insurance Policies That Prioritize Insurance Proceeds for Stabilization & Decontamination After Accident ML20205T7301988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region ML20154P5851988-09-16016 September 1988 Forwards Insp Rept 50-133/88-01 on 880829-0902.No Violations Noted ML20151U7621988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status ML20151U3741988-08-11011 August 1988 Informs of NRC Interpretation of 10CFR50.74(a) Re Changes in Operator or Senior Operator Status ML20151U0111988-08-0404 August 1988 Advises That Rev 1 to Plant Emergency Plan for Safstor Meets Stds in 10CFR50.47(b) & Requirements of 10CFR50,App E & Acceptable ML20151G2141988-07-19019 July 1988 Forwards Amend 23 to License DPR-7 & Safety Evaluation. Amend Deletes Certain Conditions Re Seismic Mods Required Before NRC Would Authorize Return to Power Operation.Notice of Issuance Also Encl ML20196B2331988-06-21021 June 1988 Forwards Request for Addl Info Re Use of Tamper Indicating Security Seals on Spent Fuel Storage Pool to Allow Change from Present Annual Inventories of SNMs to Inventories Every 5 Yrs,In Response to ML20195E3301988-06-16016 June 1988 Informs That Portions of Rev 2 to Nov 1986 Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable.Util Instructed to Follow Previously Approved Plan for Noted Inconsistent Portion,Per 10CFR73.57.Encl Withheld (Ref 10CFR73.21) ML20236Y2981987-12-0404 December 1987 Advises That 870430 Rev 1 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20236J4791987-10-23023 October 1987 Forwards Insp Rept 50-133/87-05 on 870928-1001.No Violations Noted ML20236D4941987-07-23023 July 1987 Forwards Request for Addl Info Re Tech Specs on Insp Programs for Decommissioning.Necessary Changes to Tech Specs Also Encl.Response Requested within 30 Days of Ltr Date ML20236D5351987-07-23023 July 1987 Forwards Safeguards Insp Rept 50-133/87-03 on 870714-16.No Violations Noted ML20235D1691987-06-23023 June 1987 Forwards Insp Rept 50-133/87-02 on 870602-05 & Notice of Violation ML20215L9441987-05-0606 May 1987 Forwards Fes Re Decommissioning of Facility.Notice of Issuance Forwarded to Ofc of Fr for Publication ML20210C5081987-04-29029 April 1987 Forwards SER Re Proposed Decommissioning of Facility.Ser Evaluates 840730 Application to Delete Certain License Conditions Re Seismic Mods Before NRC Would Authorize Return to Power & to Extend License DPR-7 to 151109 IR 05000133/19870011987-03-0404 March 1987 Forwards Insp Rept 50-133/87-01 on 870209-13.No Violations Noted ML20211C5301987-02-11011 February 1987 Forwards Amend 22 to License DPR-7 & Safety Evaluation. Amend Establishes Physical Security Requirements for Unit Shut Down.Security Plan Reflects possess-but-not-operate Status of License ML20210E9591987-02-0404 February 1987 Advises of 870311 Workshop on NRC Incident Investigation Program (Iip) in Walnut Creek,Ca to Provide Info Re NRC Process for Investigating Potential Significant Incidents. Agenda Encl.W/O Iip Procedures ML20210F2641987-02-0404 February 1987 Forwards Two Copies of Emergency Plan Std Operating Procedure III.25 for State of CA Mens Colony,Per 870113 Request to Withdraw Procedure in Accordance w/10CFR2.790(c). Third Copy of Procedure Destroyed ML20207F1131986-12-30030 December 1986 Forwards Request for Addl Info Re Emergency Planning for Safstor,To Support 850404 & 860612 Proposed Decommissioning Plan.Response Requested by 870120 ML20212A4541986-12-0808 December 1986 Forwards Insp Rept 50-133/86-03 on 861117-21.No Violations Noted ML20212N4791986-08-26026 August 1986 Forwards Amend 21 to License DPR-7 & Safety Evaluation. Amend Revises Tech Specs to Upgrade Requirements for Stack Gas Monitoring Sys & Reduce Required Number of Condensate Demineralizer Beds ML20202H9291986-07-14014 July 1986 Informs That State of CA Has Jurisdiction Over Disposal of Low Level Radwaste,In Response to 860617 Request for Approval to Dispose of Sludge & Firebox Waste Containing Very Low Levels of Radioactivity ML20199J5181986-06-27027 June 1986 Forwards Fr Notice of Consideration of Issuance of Amend to License DPR-7 & Opportunity for Prior Hearing,On 840730 Application,Deleting License Conditions Re Seismic Investigation Analysis & Mods ML20211K1311986-06-23023 June 1986 Forwards Insp Rept 50-133/86-02 on 860602-06.No Violation Noted ML20206L5521986-06-18018 June 1986 Advises That Rev 2 to Safstor QA Plan Continues to Satisfy Requirement That QA Program Description Provide Adequate Assurance That Decommissioning Will Be Conducted in Controlled Manner.Plan Acceptable ML20206H1471986-06-16016 June 1986 Forwards Amend 20 to License DPR-7 & Safety Evaluation.Amend Deletes License Condition E.2.e Re Reinstatement & Operation of Microseismic Monitoring Network,Per Util 831216 Request as Supplemented on 860307 ML20210E1971986-03-11011 March 1986 Forwards Insp Rept 50-133/86-01 on 860219-21.No Violation Noted ML20137L4961986-01-21021 January 1986 Advises That Revised 851022 Physical Security Plan Satisfies NRC Requirements & Acceptable.Guard Training & Qualification & Safeguards Contingency Plans Still Need to Be Submitted for Review & Approval ML20138R0021985-12-20020 December 1985 Discusses 840620 Rev to 10CFR170 Re Billing Procedures. Bills Recently Issued Under Category 1 for Cycle Ending 841222.Billing Categories 2-5 Can Expect Bills for First Cycle Shortly.Future Notice Prior to Billing Will Not Occur ML20138A3071985-10-0404 October 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Listed in 850826 Notice of Violation. Corrective Actions Will Be Reviewed in Next Physical Security Insp ML20133G4311985-09-27027 September 1985 Forwards Insp Rept 50-133/85-04 on 850826-30 & 0918-22.No Violations Noted ML20135B0521985-09-0303 September 1985 Forwards Environ Assessment Accepting 850425 Request Re Transfer of Sludge from Wastewater Treatment Ponds Offsite. Approval from Relevant State & Local Agencies May Be Necessary for Implementation,Per 10CFR150 IR 05000133/19850031985-08-26026 August 1985 Forwards Safeguards Insp Rept 50-133/85-03 on 850731-0820 & Notice of Violation.Encls Withheld (Ref 10CFR2.790 & 73.21) IR 05000133/19850021985-07-25025 July 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-133/85-02.Steps Identified at 850718 Meeting Include Measures to Address Radiation Protection Program Concerns ML20128M6451985-07-16016 July 1985 Forwards Amend 19 to License DPR-7 & Safety Evaluation.Amend Modifies License to possess-but-not-operate Status ML20127N6621985-06-12012 June 1985 Forwards Insp Rept 50-133/85-02 on 850513-16 & Notice of Violation ML20128L8811985-05-21021 May 1985 Requests Fee for 850425 Application for Amend to License DPR-7,authorizing Disposal of 5,000 Cubic Ft of Low Level Wastes IR 05000133/19840021984-06-12012 June 1984 Discuss IE Safeguards Insp Rept 50-133/84-02 Conducted on 840523-25.No Noncompliance Noted.Major Areas Inspected:Exams of Procedures & Records & Interviews W/Personnel.Rept Withheld (Ref 10CFR2.790 & 73.21) ML20058D1451982-07-0202 July 1982 Forwards IE Safeguards Insp Rept 50-133/82-02 on 820621-24. No Noncompliance Noted ML20054M1801982-07-0202 July 1982 Advises of Acceptability of Changes to Security Plan, Transmitted by .Encl to Ltr Being Withheld (Ref 10CFR73.21) ML20132A9061979-08-13013 August 1979 Forwards IE Bulletin 79-21, Temp Effects on Level Measurements. No Action Required ML20062H1461979-05-11011 May 1979 Forwards IE Bulletin 79-10, Requalification Training Program Statistics. Written Response Required 1990-08-22
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20212J7481999-09-29029 September 1999 Forwards Insp Rept 50-133/99-02 on 990915.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program ML20209D9981999-07-0808 July 1999 Ack Receipt of Which Transmitted Rev 9 to Physical Security Plan for Humboldt Bay Power Plant,Under Provisions of 10CFR50.54(p).Changes Do Not Decrease Plan Effectiveness,So NRC Approval Is Not Required ML20207E7301999-05-27027 May 1999 Discusses Reorganization of Nrr,Effective 990328 & Forwards Organizational Chart ML20205L9951999-04-0808 April 1999 Forwards Insp Rept 50-133/99-01 on 990222-25 & 0308.No Violations Identified ML20195H7631998-11-20020 November 1998 Forwards Insp Rept 50-133/98-04 on 980901-03,1012-17 & 20-22.No Violations Noted.Insp Focused on Activities Associated with Removal of 250 Feet Ventilation Stack ML20154G4441998-10-0101 October 1998 Ack Receipt of Which Transmitted Rev 8 to Physical Security Plan for Humboldt Bay Power Plant,Under Provisions 10CFR50.54.Based on Determination That Changes Do Not Decrease Effectiveness of Plan,No NRC Approval Required ML20247R9091998-05-26026 May 1998 Forwards Copy of Transcript of Public Meeting Held by NRC W/Participation by PG&E on 980429 in Eureka,California Re Decommissioning of Humboldt Bay Power Plant ML20236E7681998-05-22022 May 1998 Forwards Insp Rept 50-133/98-03 on 980427-30.No Violations Noted.Insp Included Plans for Future Decommissioning of Facility,Including Removal of Unit 3 Stack & Eventual Dry Cask Storage of Unit 3 Spent Fuel ML20247F9241998-05-14014 May 1998 Forwards Insp Rept 50-133/98-02 on 980414-15.No Violations Noted.Areas Examined During Insp Included Portions of Physical Security Program.Determined That Physical Security Program Was Properly Implemented ML20216B7291998-05-12012 May 1998 Expresses Appreciation for Support Provided for Recent Public Meeting Held at Eureka Inn on Decommissioning of Humboldt Bay Power Plant ML20216B6801998-05-11011 May 1998 Expresses Appreciation for Outstanding Support Staff Provided for Recent Public Meeting Held at Eureka Inn on Decommissioning of Humboldt Bay Power Plant ML20216C8681998-04-0808 April 1998 Forwards Amend 32 to License DPR-7 & Safety Evaluation. Amend Revises TS to Implement GL 89-01 & to Incorporate Requirements of Revised 10CFR20 & App I to 10CFR50 ML20203K9691998-02-27027 February 1998 Forwards Insp Rept 50-133/98-01 on 980126-29.No Violations Noted.Major Areas Reviewed as Part of Insp Included Compliance W/Selected TS of License,Review of 1997 Annual Exercise & Evaluation of Facility Re Decommissioning Plan ML20198J4791998-01-0707 January 1998 Informs That LL Wheeler Assumed Project Mgt Responsibilities for Humboldt Bay on 971229.LL Wheeler Can Be Contacted at Listed E-mail Address ML20199B3851997-11-13013 November 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-133/97-02 on 971001 ML20217D6191997-10-0101 October 1997 Forwards Insp Rept 50-133/97-02 on 970513-0828 & Nov.Nrc Will Use Licensee Response to NOV to Determine Whether Further Enforcement Action Necessary ML20149K8321997-07-25025 July 1997 Ack Receipt of Transmitting Rev 7 to Physical Security Plan,Submitted Under Provisions of 10CFR50.54(p). Changes Do Not Decrease Effectiveness of Plan & No NRC Approval Is Required ML20138H4121996-12-31031 December 1996 Final Response to FOIA Request for Documents.Forwards Documents Listed in App C.Documents Encl Available in PDR ML20133A6131996-12-24024 December 1996 Discusses Withdrawal of Amend Request for Plant,Unit 3 for License DPR-7.Notice of Withdrawal for Amend to FOL Encl ML20129J4001996-10-18018 October 1996 Forwards Order Approving Corporate Restructuring by Establishment of Holding Company & Safety Evaluation IR 05000133/19930041993-12-0202 December 1993 Forwards Insp Rept 50-133/93-04 on 931115-18.No Violations Noted.Encl Withheld (Ref 10CFR2.790) ML20057C6451993-08-26026 August 1993 Forwards Insp Rept 50-133/93-03 on 930817.No Violations Noted ML20057C5091993-08-26026 August 1993 Forwards Insp Rept 50-133/93-02 on 930817-20.No Violations Noted ML20056G0041993-06-25025 June 1993 Submits Info Re Implementation of Training Rule 10CFR50.120 for Licensees of Plant in Decommissioning Process ML20059C0381990-08-22022 August 1990 Advises That 880826 & 900717 Rev 2 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20055H4661990-07-13013 July 1990 Forwards Insp Rept 50-133/90-02 on 900618-21.No Violations Noted IR 05000133/19890021989-09-28028 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations in Insp Rept 50-133/89-02 IR 05000133/19890031989-08-28028 August 1989 Forwards Safeguards Insp Rept 50-133/89-03 on 890814-24.No Violations Noted.Rept Withheld (Ref 10CFR73.21 & 2.790(d)) ML20246M1151989-08-22022 August 1989 Forwards Exemption from Property Damage Insurance Requirement,Per 890609 Request ML20246D2811989-08-11011 August 1989 Forwards Insp Rept 50-133/89-02 on 890717-20 & Notice of Violation ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20206K6001988-11-18018 November 1988 Forwards Temporary Exemption from Schedular Requirements of Property Insurance Rule 10CFR50.54(w)(5)(i) Re Insurance Policies That Prioritize Insurance Proceeds for Stabilization & Decontamination After Accident ML20205T7301988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region ML20154P5851988-09-16016 September 1988 Forwards Insp Rept 50-133/88-01 on 880829-0902.No Violations Noted ML20151U7621988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status ML20151U3741988-08-11011 August 1988 Informs of NRC Interpretation of 10CFR50.74(a) Re Changes in Operator or Senior Operator Status ML20151U0111988-08-0404 August 1988 Advises That Rev 1 to Plant Emergency Plan for Safstor Meets Stds in 10CFR50.47(b) & Requirements of 10CFR50,App E & Acceptable ML20151G2141988-07-19019 July 1988 Forwards Amend 23 to License DPR-7 & Safety Evaluation. Amend Deletes Certain Conditions Re Seismic Mods Required Before NRC Would Authorize Return to Power Operation.Notice of Issuance Also Encl ML20196B2331988-06-21021 June 1988 Forwards Request for Addl Info Re Use of Tamper Indicating Security Seals on Spent Fuel Storage Pool to Allow Change from Present Annual Inventories of SNMs to Inventories Every 5 Yrs,In Response to ML20195E3301988-06-16016 June 1988 Informs That Portions of Rev 2 to Nov 1986 Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable.Util Instructed to Follow Previously Approved Plan for Noted Inconsistent Portion,Per 10CFR73.57.Encl Withheld (Ref 10CFR73.21) ML20236Y2981987-12-0404 December 1987 Advises That 870430 Rev 1 to Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20236J4791987-10-23023 October 1987 Forwards Insp Rept 50-133/87-05 on 870928-1001.No Violations Noted ML20235B3081987-09-21021 September 1987 Responds to FOIA Request for Documents,Including AEC to ACRS Forwarding Safety Evaluation Re Zimmer.App a Documents Cannot Be Located.App B Documents in Pdr.App C & D Documents Withheld (Ref 10CFR2.790) ML20236D4941987-07-23023 July 1987 Forwards Request for Addl Info Re Tech Specs on Insp Programs for Decommissioning.Necessary Changes to Tech Specs Also Encl.Response Requested within 30 Days of Ltr Date ML20236D5351987-07-23023 July 1987 Forwards Safeguards Insp Rept 50-133/87-03 on 870714-16.No Violations Noted ML20235M4251987-07-13013 July 1987 Partial Response to FOIA Request for Documents Re Acrs. Forwards Documents for Categories One & Three of FOIA Request.Review of 21 Addl ACRS Documents Continuing ML20234E4571987-06-23023 June 1987 Partial Response to FOIA Request for 771026 Minutes of ACRS Subcommittee on Fluid/Hydraulic Dynamic Effects Meeting in Portland,Or & Addl ACRS Documentation.Documents Identified on App H & Addl ACRS Documents Encl ML20235D1691987-06-23023 June 1987 Forwards Insp Rept 50-133/87-02 on 870602-05 & Notice of Violation ML20214K9931987-05-26026 May 1987 Responds to FOIA Request for GE Repts NEDE-10182 & GEAP-3143.Forwards Rept GEAP-3143, Test Rept for Pressure Suppression,Development Program ML20214M6631987-05-22022 May 1987 Forwards Revised NRC Form 398.Rev Reflects Changes to 10CFR55 Effective on 870526.Revised Form Requires New Applications to Complete Each Category Including Educ, Training & Experience.Changes Detailed in Encl 2 1999-09-29
[Table view] |
Text
'
June 21, 1988 4
Docket No. 50-133 Mr. J. D. Shiffer, Vice President Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Room 1451 San Francisco, California 94106
Dear Mr. Shiffer:
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION, HUMBOLDT BAY POWER PLANT UNIT NO. 3 By letter dated June 6, 1988 you requested our concurrence in using tamper indicating security seals on the spent fuel storage pcol to allow a change from the present annual inventories of special nuclear materials to inventories every 5 years.
During our evaluation of your request we determined that we needed additional information. Enclosure No. 1 identifies the information that we need to complete our review. We request your response within 30 days of the date of this letter.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, Original Signed By Peter B. Erickson,: Project Manager Standardization and Non-Power Reactor Project Di ectorate ;
Division of Reactor -rojects III, l IV, V and Special Projects Office of Nuclear Reactor Regulation i
Enclosure:
As stated cc: See next page bk kkb$ $$$$$jgg PDR
, DISTRIBUTION:
l Jocket 111ea PEriekson NRC & Local PORs OGC-Rockville PDSNP Reading E. Jordan DCrutchfield J. Partlow EHylton ACRS (10)
PDSNP P !J RSGB A PErickson:ls Ston DCarlson LRu ein 06/E/88 06/p/88 06/**/88 06/0 /88
t 0#
UNITED STATES
'/. ~ ;.
.j NUCLEAR REGULATORY COMMISSION h WASHINGTON, D. C. 20555
'a
/ June 21, 1988 ess.*
Docket No. 50-133 Mr. J. D. Shiffer, Vice President Nuclear Power Generation, Licensing Pacific Gas and Electric Company 77 Beale Street, Recm 1451 San Francisco, California 94106
Dear Mr. Shiffer:
SUBJECT:
REQUEST FOR ADDITIONAL IiWORMATION, HUMBOLDT BAY POWER PLANT UNIT NO. 3 By letter dated June 6, 1988 you requested our concurrence in using tamper indicating security seals on the spent fuel storage pool to allow a change from the present ennual inventories of special nuclear materials to inventories every E years.
During our evaluation of your request we determined that we needed additional infcrmation. Enclosure No. 1 identifies the information that we need to complete otir review. We request your response within 30 days of the date of this letter.
The reporting and/or recordkeeping requirements contained in this letter affect fewer then ten respondents; therefore, OMB clearance is not required under P.L. 96-5*.1.
Sincerely, 9
2 h Peter B. Erickson, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, Y and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: See next page
e Humboldt Bay Nuclear Power Plant Mr. J. D. Shiffer Pacific Gas and Electric Company Docket No. 50-133 cc:
Richard F. Locke Mr. loseph 0. Ward, Chief Pacific Gas and Electric Company Radiological Health Branch Law Department State Department of Health Services Post Office Box 7442 714 P Street, Office Bldg. #18 San Francisco, California 94120 Sacramento, California 95814 Chairman Director Humboldt County Board of Supervisors Energy Facilities Siting Division County Courthouse Energy Resources Conservation &
825 Fifth Street Development Commission Eureka, California 95501 1516 9th Street Sacramento, California 95814 Linda J. Brown, Esquire Gretchen Dumas, Escuire Donohaw, Jones, Brown & Clifford Public Utrilities Comission 100 Van Ness Avenue, 19 Floor of the State of California San Francisco, California 94102 5066 State Building San Franci.co, California 94102 U.S. Environmental Protectio- Agency Public Af% irs Officer Region IX Office Region Y ATTN: Regional Radiation Representative U.S. Nuclear Regulatory Commission 215 Freement Street 1450 Maria Lane San Francisco, California 94105 Walnut Creek, California 94596 Regional Administrator Office of Intergovernmental Nuclear Regulatory Comission, Region V Management 1450 Maria Lane, Suite 210 State o,' California Walnut Creek, Califortiia 94596 1400 10tn Street, Room 108 :
Sacramento, California 95814 Michael R. Sherwood, Esquire Sierra Club Legal Defense Fund, Inc.
2044 Fillmore Street j San Francisco, California 94115 Dr. Perry Aminoto !
Department of Conservation i Division of Mines & Goclogy ,
1416 9th Street, Room 1341 i Sacramento, California 95814 Scott L. Fielder, Esquire 517 Third Street, Suite 14 Eureka, California 95501
- Enclosure 1 REQUEST FOR ADDITIONAL INFORMATION ,
HUMBOLDT BAY UNIT NO. 3, PHYSICAL-INVENTORY OF SPENT FUEL For us to com31ete our review of the June 6, 1988 application, we need a response in w1ich PG & E agrees to the following condit'ons or proposes alternate, connensurate requirements:
- 1. The Regulatory Fosition stated in Section C of Regulatory Guide 5.15, entitled, "Security Seals for the Protection and Control of Special Nuclear Material," dated January 1974, shall be adhered to;
- 2. A physical inventory of all spent fuel shall be conducted whenever a seal has been found to be comprised;
- 3. Seal number and integrity shall be verified every 12 months;
- 4. A physical inventory of all spent fuel shall be conducted after an authorized cpening of the cover in which the period of time since the last inventory is in excess of 12 months; and
- 5. Two authorized individuals shall remain in the area of the spent fuel storage pool when the cover is removed and the period of time since the last inventory is less than 12 months, and the same two individuals shall attest in writing that no fuel was removed from the pool. Alternatively, ar, inventory of all spent fuel shall be conducted.
l l
__ -._-. . _ . _ _ . . _ _ ._ __ ._. _. ._______ _-__ _.