IR 05000133/1984002

From kanterella
Jump to navigation Jump to search
Discuss IE Safeguards Insp Rept 50-133/84-02 Conducted on 840523-25.No Noncompliance Noted.Major Areas Inspected:Exams of Procedures & Records & Interviews W/Personnel.Rept Withheld (Ref 10CFR2.790 & 73.21)
ML20197G867
Person / Time
Site: Humboldt Bay
Issue date: 06/12/1984
From: Norderhaug L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Schuyler J
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8406180186
Download: ML20197G867 (2)


Text

_

$

,

'

-

-

r

'I f

SAFEGU ARDS INFORMATION

-

,

,

Docket No. 50-133

'

i 219M

'

.

Pacific Gas and Electric Company 77 Beale Street, Room 1435 San Francisco, California 94106 f Attention:

Mr. J. O. Schuyler, Vice President

'

Nuclear Power Generation, Licensing

,

' Gentlemen:

This letter refers to the routine Physical Security inspection of your

~

activities authorized under NRC License No. DPR-7 conducted by

"

Mr. C. A. Schwan of this office on May 23-25, 1984.

It also refers to the discussions of our inspection findings held by the inspector with Messrs. E. Weeks, G. Busey and D. Peterson on May 25, 1984.

'<-

-Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and records, interviews with facility and contract personnel, and observations b, the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

l

-

In accordanc,e with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10,. Code of Federal Regulations, documentation of the findings of your safeguards and security measures are exempt from public disclosure; therefore, the enclosed inspection report will not be placed in the Public Document Room and will receive limited distribution.

We'have' determined that the enclosures so designated contain Safeguards Information and therefore are subject to the controls of 10 CFR 73.21.

<

.

>

%

A i f (

,

-

lE o

'

ENCI2)SURE CONTAINS h

-

j SAFEGUARDS INFO'.WATION.

  • UPON SEPARATION THIS gi

= PAGE IS DECONTROLLED.

84 6

,

G..

__

- _

- _

.-

w-

.-

i

'

JUN 121984 Pacific Gas and Electric Company

n Should you have any questions concerning this letter, we will be glad to

discuss them with you.

e

'

Sincerely, (

-

.

~.,m. '

>

C@rl :i.p:3 W

. L. R. ~ t h -

- ' ' '

,

'"

LeRoy R. Norderhoug, Chief t

's

',. -

..

'

'

.'

Safeguards Branch

.

.

,

>

Enclosure :

.

-

,,

f

Inspection Report

t

'

.

.No. 50-133/84-02'(IE-V-633)

'

?s

,

' ' cc w/ enclosure :

,

& ', -

(J;=D.*JShiffer,PG&E

.,

E. Weeks, Plant Superintendent, PG&E (Humboldt Bay)

/

W. A. Raymond, PG&E

.-

bec: RSB/Do'cument Control Desk (RIDS)

.

' distributed by RV:

State of CA (w/o enc 1)

Martin (w/ encl)

2 Safeguard copies (w/ enc 1)

SCHWAN

N

ERHAUG

SCA

6/7/84

6/g/84

6/g /84

,4,

1