ML20206L552

From kanterella
Jump to navigation Jump to search
Advises That Rev 2 to Safstor QA Plan Continues to Satisfy Requirement That QA Program Description Provide Adequate Assurance That Decommissioning Will Be Conducted in Controlled Manner.Plan Acceptable
ML20206L552
Person / Time
Site: Humboldt Bay
Issue date: 06/18/1986
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Shiffer J
PACIFIC GAS & ELECTRIC CO.
References
NUDOCS 8606300341
Download: ML20206L552 (1)


Text

.- . . -

?

g.

JtJN 181?AS

~I bNSEEG San Francisco, California 94106 Attention: Mr. James D. Shiffer Vice President, Nuclear Power Generation

SUBJECT:

QUALITY ASSURANCE PROGRAM DESCRIPTION FOR DECOMMISSIONING OF HUMBOLDT BAY Ue have reviewed the changes addressed in Revision 2 to the SAFSTOR QA '

3 Plan for the decommissioning of the Humboldt Bay Power Plant,' Unit 3 (HBPP-3).

4 As a result of our review, we conclude that Revision 2 continues to satisfy the requirement that the QA program description provide adequate' assurance that i the decommissioning of HBPP-3 will be conducted in a controlled manner and

<is-therefore acceptable.

Any questions you may have concerning this review should be directed to W. J. Wagner of my staff on (415) 943-3731.

/s/

Dennis F. Kirsch, Director

. Division of Reactor Safety and Projects cc:

P. B. Erickson, NRR W. L. Belke, QAB C. Hooker, RV DRS&P Section Chiefs DRS&P Branch Chiefs

% M " **1 3?"F '31 h*k i MJ3-RV/jk l WAGNER YOUNG PATE KIRSCH l 6//d/86 6//f/86 6//8/86 6/j[86 1

I EEOl 8606300341 860618 PDR P

ADOCK 05000133 PDR F jd

- -- .. -. - .- . -- - . _ . - . - . _ - _ - - -