Forwards 10CFR50.59 Annual Rept of Changes,Tests & Experiments for 980101-981231, for Humboldt Bay Power Plant,Unit 3
ML20211J657
Person / Time
Site: Humboldt Bay
Issue date: 08/27/1999
From: Moulia T
PACIFIC GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211J663 List:
References
HBL-99-011, NUDOCS 9909030221
Download: ML20211J657 (2)


Text

E ...

. Pacific Gas and Electric Comp:ny 1000 King Salmon Avenue ll:mboldt Bay Power Plant E*k*' CA 93303 TOM A. MOULIA 'O'I###400 Plant Manager August 27,1999 PG&E Letter HBL-99-011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-133, OL-DPR-7 Humboldt Bay Power Plant, Unit 3 10 CFR 50.59 Annual Report of Chances. Tests. and Exoeriments for the Reportina Interval of January 1.1998. throuah December 31.1998

Dear Commissioners and Staff:

Pursuant to 10 CFR 50.59, attached is the Annual Report of Changes, Tests, and Experiments for Humboldt Bay Power Plant, Unit 3 (HBPP) for the reporting interval of January 1,1998, through December 31,1998.

Chanaes in the Facility as Described in the SAFSTOR Decommissionina Plan (SDP)

The attached annual report provides a brief description of the 10 CFR 50.59 facility design changes, including a summary of each safety evaluation. Each change was reviewed and accepted by the Plant Staff Review Committee (PSRC).

Chanaes in Procedures as Described in the SDP I

The attached annual report provides a brief description of the 10 CFR 50.59 procedure changes, including a summary of each safety evaluation. Each /

change was reviewed and accepted by the PSRC.

Tests and Exoeriments Not Described in the SDP No tests or experiments were performed during the reporting period that are not described in the SDP. 66 /

The PSRC determined that none of the design changes or procedure changes involved an unreviewed safety question or a change to the HBPP Technical Specifications. It should be noted that the SDP was renamed the Defueled Safety Analysis Report (DSAR) on August 28,1998.

9909030221 990827 PDR ADOCK 05000133 R PDR

1 1

i l

Document Control D:sk PG&E Letter HBL-99-011 August 20,1999 Page 2 Sin rely

% d Thomas A. Mo' lia cc: Ellis W. Merschoff Louis L. Wheeler Attachment l